Understanding Changes in Formula Bharat 2025 Rules Booklet
26 Questions
22 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What does the Formula Bharat competition challenge teams to do?

  • Conceive and fabricate race cars
  • Design and fabricate formula style cars
  • Develop and conceive small race cars
  • Design and compete with small race cars (correct)
  • In the Formula Bharat rules booklet, what do the abbreviations AMS stand for?

  • Accumulator Management System (correct)
  • Accumulator Isolation Relay
  • Accelerator Pedal Position Sensor
  • Anti Intrusion Plate
  • According to the 2025 rules booklet, what does LPI refer to?

  • Low Pressure Injection (correct)
  • Low Voltage Master Switch
  • Low Voltage Vehicle
  • Low Voltage System
  • What was clarified in regulation D9.4.2 for the 2024 FSG event?

    <p>Applicability of disqualification</p> Signup and view all the answers

    Which rule was changed for the 2023 FB event regarding Tmax multiplier?

    <p>Tmax multiplier adjustment</p> Signup and view all the answers

    What did regulation D7.6.6 clarify for the 2024 FSG event?

    <p>Tire change after puncture</p> Signup and view all the answers

    For what aspect was there an addition of a new rule in regulation D9.2.6 for the 2024 FSG event?

    <p>Penalties application</p> Signup and view all the answers

    What was removed in regulation D5.1.1 for the 2024 FSG event?

    <p>Rule restriction on marking cones</p> Signup and view all the answers

    Which regulation specified a change to refer to table 3 for maximum points in the 2024 FSG event?

    <p>D7.8.4</p> Signup and view all the answers

    In the Formula Bharat rules, what does APPS stand for?

    <p>Accelerator Pedal Position Sensor</p> Signup and view all the answers

    Which of the following is not a requirement for a team to participate in Formula Bharat 2025?

    <p>All team members must be students at the same university</p> Signup and view all the answers

    What is the purpose of the Brake System Plausibility Device (BSPD) required in the Formula Bharat 2025 rules?

    <p>To prevent the motor from providing torque when the brake is applied</p> Signup and view all the answers

    Which of the following is a penalty that can be applied during the Endurance Event in Formula Bharat 2025?

    <p>All of the above</p> Signup and view all the answers

    What is the purpose of the Tractive System Active Light (TSAL) required in Formula Bharat 2025 electric vehicles?

    <p>To indicate when the tractive system is active and the vehicle is ready to move</p> Signup and view all the answers

    What is the main purpose of the Insulation Monitoring Device (IMD) required in Formula Bharat 2025 electric vehicles?

    <p>To monitor the insulation resistance of the tractive system and shut it off if it becomes too low</p> Signup and view all the answers

    What is the main purpose of the Tilt Test performed during the technical inspection of Formula Bharat 2025 vehicles?

    <p>To check that the vehicle's center of gravity is low enough to prevent rollover</p> Signup and view all the answers

    Which of the following is a requirement for the Endurance Event in Formula Bharat 2025?

    <p>Vehicles must complete a minimum number of laps to be classified</p> Signup and view all the answers

    What is the purpose of the Brake Over-Travel Switch (BOTS) required in Formula Bharat 2025 vehicles?

    <p>To shut off the engine or tractive system if the brake pedal is pressed too far</p> Signup and view all the answers

    What is the primary purpose of the Flags used during the Dynamic Events in Formula Bharat 2025?

    <p>To regulate the flow of vehicles on the track and ensure safe driving</p> Signup and view all the answers

    What is the primary purpose of the Skidpad Event in Formula Bharat 2025?

    <p>To evaluate the vehicle's handling and cornering ability</p> Signup and view all the answers

    According to the table, what is the penalty for late submission of the FMEA (Failure Mode and Effects Analysis) document?

    <p>10 points deducted from the overall score per 24-hour delay</p> Signup and view all the answers

    If a team fails to submit the Cost Report Document (CRD) for the Bill of Materials (BOM) before the deadline, what is the consequence?

    <p>De-registration from the Cost &amp; Manufacturing event and a score of 0 points</p> Signup and view all the answers

    What is the consequence for non-submission of the Structural Equivalency Spreadsheet (SES) document after 7 days?

    <p>De-registration from the Technical Inspection and Dynamic events</p> Signup and view all the answers

    If a team fails to submit the Design Spec Sheet (DSS) on time, what is the penalty?

    <p>10 points deducted from the Engineering Design score per 24-hour delay</p> Signup and view all the answers

    What is the consequence for non-submission of the Team Member Identification (TMI) document by the deadline?

    <p>Team members' inability to receive electronic certificates and inability to participate at the on-site event</p> Signup and view all the answers

    According to the table, what is the penalty for late submission of the Ergonomics Submission Form 2 (ESF-2) document?

    <p>10 points deducted from the overall score per 24-hour delay</p> Signup and view all the answers

    Study Notes

    Formula Bharat 2025 Rules Booklet

    Abbreviations

    • AIP: Anti Intrusion Plate
    • AMS: Accumulator Management System
    • APPS: Accelerator Pedal Position Sensor
    • BOM: Bill of Material
    • BOTS: Brake Over-Travel Switch
    • BPP: Business Plan Presentation Event
    • BPPV: Business Plan Pitch Video
    • BSE: Brake System Encoder
    • BSPD: Brake System Plausibility Device
    • CBOM: Costed Bill of Material
    • CRMR: Concept-Resources-Management Report
    • CRD: Cost Report Documents
    • CV: Internal Combustion Engine Vehicle
    • DBOM: Detailed Bill of Material
    • DI: Direct Injection
    • DNA: Did Not Attempt
    • DNF: Did Not Finish
    • DOO: Down or Out
    • DQ: Disqualified
    • DSS: Design Spec Sheet
    • DV: Driverless Vehicle
    • EAIR: ESF Add Item Request
    • EBS: Emergency Brake System
    • ECU: Electronic Control Unit
    • EDP: Engineering Design Presentation
    • EI: Electrical Insulation
    • ESF: Electrical System Form
    • ESO: Electrical System Officer
    • ESOQ: Electrical System Officer Qualification
    • ETC: Electronic Throttle Control
    • EV: Electric Vehicle
    • HPI: High Pressure Injection
    • HV: High Voltage
    • HVD: High Voltage Disconnect
    • IA: Impact Attenuator
    • IAD: Impact Attenuator Data
    • IMD: Insulation Monitoring Device
    • LPI: Low Pressure Injection
    • LV: Low Voltage
    • LVMS: Low Voltage Master Switch
    • LVS: Low Voltage System
    • OC: Off-course
    • OEM: Original Equipment Manufacturer
    • PCB: Printed Circuit Board
    • R2D: Ready-to-drive
    • RES: Remote Emergency System
    • RMS: Root Mean Square
    • SCS: System Critical Signal
    • SDC: Shutdown Circuit
    • SE3D: Structural Equivalency 3D Model
    • SES: Structural Equivalency Spreadsheet
    • SVCR: Second Year Vehicle Compliance Report
    • TMI: Team Member Information
    • TPS: Throttle Position Sensor
    • TS: Tractive System
    • TSAC: Tractive System Accumulator Container
    • TSAL: Tractive System Active Light
    • TSMP: Tractive System Measuring point
    • TSMS: Tractive System Master Switch
    • USS: Unsafe Stop
    • VSV: Vehicle Status Video

    Administrative Regulations

    • A1.1.1: The competition challenges teams of university students to conceive, design, fabricate, develop and compete with small, formula style, race cars.

    Penalties

    • A5.3.1: Late or non-submissions of documents will result in penalties and consequences.
    • Penalties and consequences:
      • Late submission: Points penalty per 24 hours
      • Non-submission: De-registration from the competition

    Document Submission

    • ESOQ, FMEA, SVCR, SES, ESF-1, ESF-2, IAD, BPPV, CRMR, DSS, EDP, VSV, TMI, CRD (BOM), CRD (CEXP), CRD (CSUP) are required documents for submission.
    • Failure to submit these documents will result in penalties and consequences.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Explore the changes made in the Formula Bharat 2025 rules booklet by FS2024 and FB, including updates and eliminations indicated by specific text colors and versions. Get familiar with the modifications made for the 2024 version.

    More Like This

    Use Quizgecko on...
    Browser
    Browser