What is the recommended density for the best hivis pill compared to the mud?

  • 0.5 ppg greater
  • 2 ppg greater
  • 1 ppg greater (correct)
  • Equal density

What is the recommended yield point for the hivis pill?

  • < 50 lbf/100ft²
  • > 70 lbf/100ft² (correct)
  • = 60 lbf/100ft²
  • = 80 lbf/100ft²

Why is pipe reciprocation NOT recommended while placing a plug?

  • To increase rig time savings
  • To enhance fluid flow
  • To reduce waiting on cement time
  • To prevent swabbing of the fluids (correct)

Why is batch mixing preferred for slurry mixing?

<p>To achieve homogeneous density (D)</p> Signup and view all the answers

How long is the normal waiting on cement (WOC) time recommended after placement of plugs?

<p>12 to 24 hours (A)</p> Signup and view all the answers

Why should a minimum of 12 hours be used for WOC time after plug placement?

<p>For higher compressive strength (D)</p> Signup and view all the answers

What does early compressive strength heavily depend on?

<p>Thickening time (D)</p> Signup and view all the answers

Why is it common practice to allow for longer WOC time than necessary?

<p>Due to unknown well temperature (C)</p> Signup and view all the answers

What should be done if the cement does not drill as expected after 12 hours?

<p>Wait an additional 6 hours (B)</p> Signup and view all the answers

More Like This

Cement Production and Packaging
88 questions
Cement Setting Time and Factors
18 questions
Cement Manufacturing Lecture 2
24 questions
Use Quizgecko on...
Browser
Browser