TSM Steel Plant Overview and Processes
48 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the minimum weight required for weighment to be applicable for HR Coil?

  • 100 kg (correct)
  • 150 kg
  • 50 kg
  • 200 kg
  • Which materials fall under the weighment application category?

  • CRCA, HR Slit
  • All types of metals
  • Non CRCA, CTL & HR Slit (correct)
  • HR Plate/Sheet only
  • In the slab dispatch process, what document is associated with the weighment process?

  • Delivery Note
  • Purchase Order
  • Invoice (correct)
  • Sales Order
  • What action occurs if the weighment is below 100 kg for the HR Coil?

    <p>It does not proceed with the process.</p> Signup and view all the answers

    What is the final action before a vehicle departs from CRM Logistics Park?

    <p>PDIR Check</p> Signup and view all the answers

    What is the role of Gate 2 in the process flow?

    <p>It marks the start of TAT.</p> Signup and view all the answers

    What is the first step in the HR Dispatch process after TAT starts?

    <p>Loading</p> Signup and view all the answers

    Which activity directly follows the lashing activity in the dispatch process?

    <p>PDIR Check</p> Signup and view all the answers

    What issue primarily affects traceability in CR products?

    <p>Poor communication between teams</p> Signup and view all the answers

    Which of the following sheets are dispatched to Yard 10?

    <p>PPGL coils and GC sheets</p> Signup and view all the answers

    How many loading points for dispatch are available in SMS-1 CR Yard?

    <p>9</p> Signup and view all the answers

    What is the significance of a weight difference greater than 100 kgs during re-weighment?

    <p>Products are sent back to the production team</p> Signup and view all the answers

    Which plant code corresponds to the Hot Rolled Pickled and Oiled line?

    <p>742</p> Signup and view all the answers

    What is the combined storage capacity of Yard 10?

    <p>5kT</p> Signup and view all the answers

    Which sheet types are produced by the 743 plant code?

    <p>GP Sheet and GP3 line</p> Signup and view all the answers

    What maintenance activity affects O.H crane availability?

    <p>Permanent shutdown for maintenance</p> Signup and view all the answers

    What is the rail coefficient for the TSM plant?

    <p>72%</p> Signup and view all the answers

    Which product has the highest production quantity in the product mix?

    <p>H.R Coil</p> Signup and view all the answers

    What is the approximate number of vehicles involved in the dispatch activities?

    <p>110 vehicles</p> Signup and view all the answers

    What is the purpose of the re-weighment during the process flow of CR Dispatch?

    <p>To update weight in SAP</p> Signup and view all the answers

    Which of the following combines the activities necessary for CRM logistics?

    <p>Loading and Lashing</p> Signup and view all the answers

    What action is taken if the weight is less than or equal to 100 during the dispatch process?

    <p>Use tarpaulin</p> Signup and view all the answers

    What is the overall capacity of steel making for the TSM plant?

    <p>4.8 MTPA</p> Signup and view all the answers

    What represents the acceptable vehicle turnaround time within the dispatch activities?

    <p>Approximately 110 vehicles</p> Signup and view all the answers

    What is the overall monthly production capacity of the TSM plant in KT?

    <p>440 KT/month</p> Signup and view all the answers

    Which product mix includes the highest amount produced in tons?

    <p>H.R Coil (350 kT)</p> Signup and view all the answers

    What is the minimum weight needed for a weighment to be applicable in the process flow?

    <p>100 kg</p> Signup and view all the answers

    Which mode of transport has the highest allocation in the product dispatch activities?

    <p>Rail for HR Coil</p> Signup and view all the answers

    What is the acceptable vehicle turn around time within the dispatch activities?

    <p>110 minutes</p> Signup and view all the answers

    Which step occurs after the invoice is generated in the dispatch process?

    <p>Lashing</p> Signup and view all the answers

    What represents the rail coefficient for the TSM plant?

    <p>72%</p> Signup and view all the answers

    What is the primary impact of not adhering to the acceptable vehicle turn around time?

    <p>Delayed dispatch schedules</p> Signup and view all the answers

    What is the critical weight threshold for weighment in both HR Coil and Slab Dispatch processes?

    <p>100 kg</p> Signup and view all the answers

    In the HR Dispatch process, what task follows the lashing activity?

    <p>Weight Update in SAP</p> Signup and view all the answers

    What happens if the weighment in the Slab Dispatch process is under the specified limit?

    <p>The vehicle must be reweighed</p> Signup and view all the answers

    Which of the following activities is not part of the HR Coil process flow?

    <p>Customer Invoicing</p> Signup and view all the answers

    Which stage in the dispatch process involves a PDIR Check for compliance?

    <p>Before Loading</p> Signup and view all the answers

    What critical information is updated in SAP during the dispatch process?

    <p>Weight Measurements</p> Signup and view all the answers

    Which of the following does not relate to the timing aspect in the dispatch activities?

    <p>Gate 2 Process Flow</p> Signup and view all the answers

    What signifies the end of the load process in CRM Logistics Park?

    <p>Vehicle Departure Confirmation</p> Signup and view all the answers

    Identify the function of Overhead (O.H) cranes in facilities apart from Yard 10.

    <p>Shifting, loading, unloading, and packing activities.</p> Signup and view all the answers

    What is the primary consequence of a weight difference greater than 100 kg during the re-weighment process?

    <p>The product gets redirected back to the production team.</p> Signup and view all the answers

    Which statement accurately describes the storage capabilities of Yard 10?

    <p>It has a storage capacity of 5kT and 3 loading points for dispatch.</p> Signup and view all the answers

    Which product types are dispatched from the 743 plant code?

    <p>Galvanized Plain sheets and Galvanized Corrugated sheets.</p> Signup and view all the answers

    What likely causes traceability issues in Cold Rolled (CR) products?

    <p>Intrashifting by the production team and lack of system updates.</p> Signup and view all the answers

    How many loading points are available for dispatch in the SMS-1 CR Yard?

    <p>9 loading points.</p> Signup and view all the answers

    Which description accurately reflects the maintenance situation of the cranes in the sheds?

    <p>One O.H crane is permanently shut down, affecting operational capacity.</p> Signup and view all the answers

    How are the loading processes in CRM Yard differentiated?

    <p>By associating specific loading points with product types.</p> Signup and view all the answers

    Study Notes

    TSM Overview

    • TSM plant has a steel-making capacity of 4.8 MTPA
    • 72% of the plant’s output is transported by rail
    • The plant produces 440 KT of steel per month

    Product Mix

    • Steel product mix includes: HR (350 kT), CR (50 kT), and Slab (40 kT)
    • HR (Hot-Rolled) products are 310 KT of coil, 40 KT of plate and 39 KT of sheet
    • CR (Cold-Rolled) products are 1 KT of coil, 5 KT of plate, and 35 KT of sheet
    • Different products are transported by both rail and road

    Dispatch Activities

    • The acceptable vehicle turn-around time (TAT) for dispatch is ~110 vehicles
    • There are ~60 vehicles for CRM and CR dispatch activities

    Process Flow Paths

    • The TAT starts at the CRM parking and ends at Gate 2
    • CR dispatch activities include: loading, lashing, weighment, PDIR check, tarpaulin, and invoice
    • HR dispatch activities include: loading, lashing, weighment, PDIR check, and invoice
    • Slab dispatch activities include: loading, lashing, weighment, PDIR check, and invoice

    Infrastructure Constraints

    • Yard 10 has 5kT storage capacity and 3 loading points for dispatch
    • SMS-1 CR Yard has 12kT storage capacity and 9 loading points for dispatch
    • There are O.H cranes in the sheds for various activities, including loading/unloading, shifting, packing.
    • Crane utilization for dispatch is a key factor in operations
    • Re-weighment is necessary after loading, and if there is a difference greater than 100 kgs, the products are sent back to the production team for re-work
    • Traceability issues in CR products are due to intrashifting by the production team, and a lack of coordination with the OBL team.

    TSM (Meramandali) Overview

    • TSM plant has a steel-making capacity of 4.8 MTPA
    • TSM plant has a 440 KT/month outbound logistics (OBL) capacity
    • 72% of the TSM plant's outbound logistics is transported by rail
    • The product mix includes:
      • HR (350 kT)
      • CR (50 kT)
      • Slab (40 kT)

    Product Mix Details

    • HR Coil (310 kT)
      • 40 kT transported by road
      • 39 kT transported by rail
    • HR Plate (1 kT)
      • 5 kT transported by road
      • 35 kT transported by rail
    • CRCA Sheet (40 kT)
      • All transported by rail
    • GP Coil (5 kT)
      • Transported by road
    • Galume Coil (35 kT)
      • Transported by road

    Dispatch Activities and Turnaround Time (TAT)

    • Acceptable TAT for vehicle is ~ 110 vehicles
    • CRM (Customer Relationship Management) logistics park has a TAT of ~ 60 vehicles

    CR Dispatch Process Flow

    • TAT starts at CRM Parking
    • TAT ends at Gate 2
    • Weighment and re-weighment are done at the mill
    • If the weight difference is >= 100 kg, the product is sent back to the production team
    • Lashing and PDIR (Pre Departure Inspection Report) are conducted.
    • Tarpaulins are applied to the product.
    • Products are weighed and loaded.
    • An invoice is generated and the product is dispatched

    HR Dispatch Process Flow

    • TAT starts at HSM (Hot Strip Mill) Parking
    • TAT ends at Gate 2
    • Weighment and re-weighment is done at the mill
    • Lashing and PDIR (Pre Departure Inspection Report) are conducted.
    • Products are weighed and loaded.
    • An invoice is generated and the product is dispatched

    Slab Dispatch Process Flow

    • TAT starts at HSM (Hot Strip Mill) Parking
    • TAT ends at Gate 2
    • Weighment and re-weighment is done at the mill
    • Products are weighed and loaded
    • PDIR is conducted.
    • The product is dispatched directly to the customer
    • An invoice is generated and the product is dispatched

    Infrastructure - CRM Shed-10

    • Shed 10 has a capacity of 5 kT and has 3 loading points for dispatch
    • Shed 10 uses O.H cranes for loading, unloading, shifting, packing and dispatch activities
    • After loading, CR products are re-weighed. If the difference is >100 kg, the product is sent back to the production team. This issue is more prevalent with HR Slit (Shed 1) and PPGL (Shed 8), increasing the TAT.
    • Traceability issue with CR products is primarily due to shifting by the production team and not updating the system or OBL team.

    Infrastructure Constraints - SMS-1 CR Yard

    • Has 12 kT storage capacity and 9 loading points for dispatch.
    • Shed is big, has 2 O.H cranes on one half and 1 O.H crane on the other. One O.H crane is permanently shut down for maintenance.

    Product Abbreviations

    • CRCA - Cold Rolled Close Annealed
    • GP Sheet - Galvanized Plain Sheet
    • GL Sheet - Galvalume Sheet
    • PPGL - Pre-Painted Galvalume Sheet
    • GC Sheet - Galvanized Corrugated Sheet
    • HRPO - Hot Rolled Pickled and Oiled

    Plant Codes

    • Plant codes allocate specific areas for product processing and storage:
      • Plant Code 1 - 742 - HRPO, Pickling line - direct dispatch
      • Plant Code 2 - 743 - GP1 Line - Galvanized Plain (GP Hard) - to Yard 10
      • Plant Code 3 - 742 - CRFH - Mill1 and Mill 2 - to SMS Yard
      • Plant Code 4 - 743 - GP2 Line (GL Coil) - to Yard 10
      • Plant Code 5 - 743 - CTL1, GP Sheet, GC Sheet - to Yard 10
      • Plant Code 6 - 742 - CR coils, CRFH coils, Mill 3 - to SMS Yard
      • Plant Code 7 - 743 - CRCA sheet - to SMS Yard
      • Plant Code 8 - 742, 743, 744 - PPGL coil, GL coil, CR coil - to Yard 10
      • Plant Code 9 - 744 - CCL, Profile - to Yard 10
      • Plant Code 10 - 5kT Yard for direct dispatch by road and rail
      • Plant Code 11 - 743 - GP3 line, CTL2, GP sheet, GC sheet - to Yard 10
      • Plant Code 12 - 756 - IBMD for Filler loading

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz explores the TSM steel plant's capacity, product mix, and dispatch activities. It covers the plant's output distribution, vehicle turnaround times, and individual product dispatch processes for hot-rolled and cold-rolled products. Test your knowledge on each aspect of the plant's operations!