Transit-Oriented Development (TOD) Guidelines

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the defined radius of the TOD Zone around a Metro station?

  • 200 meters
  • 400 meters
  • 300 meters
  • 500 meters (correct)

The TOD zone must be delineated on ground within how many months from notification?

  • 3 months
  • 4 months
  • 1 month
  • 2 months (correct)

What is the maximum FSI permissible in TOD zones according to the provisions?

  • 1 to 2
  • 2 to 4 (correct)
  • 2 to 3
  • 3 to 5

The main purpose of providing lesser parking in TOD zones is to:

<p>Encourage public transport use (C)</p> Signup and view all the answers

Who needs to approve the TOD zone delineation?

<p>State Government (B)</p> Signup and view all the answers

What type of development is promoted in TOD zones?

<p>Mixed-use development (B)</p> Signup and view all the answers

The FSI in TOD zones depends on:

<p>Road width (C)</p> Signup and view all the answers

Premium for additional FSI in TOD zones is charged:

<p>Above base FSI (C)</p> Signup and view all the answers

Base permissible FSI in TOD zones is determined by:

<p>UDCPR (B)</p> Signup and view all the answers

Flashcards

TOD Zone Radius

The defined area around a metro station, typically 500 meters, for mixed-use development.

TOD Zone Delineation Time

The time (in months) allowed to delineate the TOD zone after a notification is issued.

Maximum FSI in TOD Zones

The allowed Floor Space Index (ratio of building area to plot area) in TOD zones, ranging from 2 to 4.

Purpose of Reduced Parking in TOD

To encourage public transport utilization by reducing the reliance on private cars.

Signup and view all the flashcards

TOD Zone Approval Authority

The State Government is responsible for approving the TOD zone delineation.

Signup and view all the flashcards

TOD Zone Development Type

TOD zones promote mixed-use development combining residential, commercial, and other activities.

Signup and view all the flashcards

FSI in TOD Zones Depends On

Road width influences the permitted Floor Space Index (FSI) in a TOD zone.

Signup and view all the flashcards

FSI Premium in TOD

Additional FSI above the base FSI level requires a premium.

Signup and view all the flashcards

Base FSI in TOD Zone Determined By

The Urban Development (Control of Development and Planning) Rules (UDCPR) determine the base FSI.

Signup and view all the flashcards

Study Notes

TOD Zone Parameters

  • Radius: The defined radius of a Transit-Oriented Development (TOD) zone around a Metro station is 500 meters.
  • Delineation Timeframe: The TOD zone must be delineated on the ground within two months of notification.
  • Maximum Floor Space Index (FSI): The maximum permissible FSI in TOD zones is 2 to 4.
  • Parking Reduction Purpose: Lower parking provisions in TOD zones aim to promote public transport use.
  • Approval Authority: The State Government approves the demarcation of TOD zones.
  • Development Type: Mixed-use development is encouraged within TOD zones.
  • FSI Determinants: The FSI in TOD zones is dependent on road width.
  • Additional FSI Premium: A premium is charged for additional FSI above the base FSI in TOD zones.
  • Base FSI Determination: The base permissible FSI in TOD zones is determined by the Urban Development and Construction Practices Regulations (UDCPR).
  • TOD Promotion Focus: TOD promotes a compact urban form.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

TOD Stages and Future Trends
13 questions
TOD Zone Regulations Overview
8 questions
TOD Zone Regulations and Impact Assessment
15 questions
Use Quizgecko on...
Browser
Browser