Transformer Installation and Testing Procedures
5 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Under what condition is the installation of a reconditioned transformer permissible?

  • Only during weekends
  • When there are multiple transformers available
  • For any consumer request without restrictions
  • As a replacement for a defective sole-used transformer, with approval from TSD (correct)
  • The warehouse section is responsible for endorsing transformers for testing without the required documents.

    False

    Who must approve the results of transformer testing before release by the Warehouse Section?

    TSD Manager, duly noted by the General Manager

    The consumer must shoulder the delivery of a ______ transformer.

    <p>sole-used</p> Signup and view all the answers

    Match the following activities with their corresponding details:

    <p>Transformer banking = Requires a Service Memorandum and assigned TSD personnel Line maintenance work = Includes clearing, upgrading, and construction activities Weekend activities = Dedicated to power interruption schedules Hauling expenses = Covered by the consumer during on-site testing</p> Signup and view all the answers

    Study Notes

    Transformer Installations

    • Reconditioned transformers can only be used as replacements for defective transformers.
    • Installation requires approval from the Technical Services Department (TSD).

    Transformer Testing and Endorsement

    • All distribution transformers require endorsement before being sent to the Warehouse Section.
    • Necessary documents include:
      • Consumer name and details
      • Photocopy of receipt or invoice
      • Warranty
    • The Warehouse Section facilitates transformer endorsement.
    • The TSD Special Equipment Section submits testing results to the TSD Manager for approval.
    • The General Manager must note the approval before the Warehouse Section can release the transformer.

    Transformer Banking and Disbanking

    • All transformer banking and disbanking activities require a Service Memorandum.
    • This is carried out by TSD personnel assigned to the Area Service Department (ASD), potentially with assistance from District Office maintenance personnel.
    • The consumer is responsible for delivering sole-used transformers.
    • Transformer banking is prohibited on weekends, which are designated for power interruption activities.

    Transformer Banking Priorities

    • Transformer banking and disbanking are the highest priority for the TSD in the area.
    • Secondary priority is given to line maintenance work, such as clearing, upgrading, uprating, construction, relocation, and rehabilitation.

    Cost Considerations

    • Consumers are responsible for hauling and transportation expenses related to on-site testing of sole-used transformers.
    • Transformer banking is prohibited on Saturdays and Sundays, except for emergency cases.
    • Offsetting or refunding payments for line hardware and materials used for consumer accounts with sole-used transformers is prohibited.
    • Line hardware and materials should be donated, as described in items 28 and 29.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers essential procedures related to transformer installations, testing endorsements, and banking practices. It includes information on documentation and approval processes necessary for compliance with technical standards. Ensure you understand each step required for successful transformer management.

    More Like This