TK-820: C20-C24 Product Storage and Handling

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Describe the primary function of TK-820 and explain how its design supports this function.

TK-820's primary function is to store C20-C24 product. Its cone roof, mixer, and heaters support this function by providing stable storage conditions, preventing settling, and maintaining the required temperature.

Explain why M-820 is installed internally within TK-820, and what problem does it solve?

M-820 is installed internally in TK-820 to prevent settling or layering of sludge and to maintain a homogeneous blend of different hydrocarbon densities.

Outline the purpose of E-820A/B/C and specify the heating medium utilized by these heaters.

E-820A/B/C's purpose is to maintain the temperature of the C20-C24 product within TK-820. They use 60 psig steam as the heating medium.

Describe the function of P-820, detailing where it sources the C20-C24 product from and its destination(s).

<p>P-820 routes C20-C24 product from TK-820 to either the C20-C24 Loading Rack or D-321 as a dilutant.</p> Signup and view all the answers

What measures are in place to prevent contamination within TK-820, and what type of contamination are these measures designed to prevent?

<p>A nitrogen blanket from D-801 is used to maintain TK-820 under pressure preventing moisture or oxygen contamination.</p> Signup and view all the answers

Flashcards

TK-820 Function

Stores C20-C24 product and prevents moisture with a nitrogen blanket.

M-820 Purpose

Prevents settling and maintains a consistent mixture of hydrocarbons inside TK-820.

E-820A/B/C Function

Internal heaters within TK-820 that maintain product temperature using 60 psig steam.

P-820 Purpose

Routes C20-C24 product from TK-820 to the loading rack or to D-321 as a dilutant.

Signup and view all the flashcards

TK-820 Internals

Cone roof, internal mixer (M-820), and internal heaters (E-820A/B/C).

Signup and view all the flashcards

Study Notes

  • TK-820 receives C20-C24 product from the bottom of T-470.
  • TK-820 sends/receives C20-C24 product to/from Unit 1798.
  • P-820 routes the C20-C24 product to the C20-C24 Loading Rack or to D-321 as a dilutant.
  • TK-820 has an internal mixer (M-820) and internal heaters (E-820A/B/C).
  • The heaters use 60 psig steam as the heating medium.
  • TK-820 is maintained under a nitrogen blanket from D-801 to prevent moisture or oxygen contamination.
  • TK-820 has a diameter of 55 feet and a length of 48 feet.
  • TK-820 is equipped with a cone roof, a mixer, and heaters.
  • TK-820 stores C20-C24 product.
  • Product enters and exits TK-820 at the bottom.
  • M-820 prevents settling/layering of sludge and maintains a homogeneous blend of different hydrocarbon densities.
  • M-820 is driven by a 7.5HP 12885 GPM induction electric motor.
  • E-820A/B/C maintain temperature using 60 psig steam as the heating medium.
  • P-820 is a single-stage centrifugal pump.
  • P-820 is driven by a 30 HP 3535 RPM horizontally-mounted, induction electric motor.
  • P-820 routes C20-C24 product from TK-820 to the C20-C24 Loading Rack.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

TK Process and Training
10 questions
TK-800: C6+ Storage Tank
5 questions

TK-800: C6+ Storage Tank

WellEducatedEllipse6137 avatar
WellEducatedEllipse6137
TK-808 C8 Product Tank Overview
5 questions

TK-808 C8 Product Tank Overview

WellEducatedEllipse6137 avatar
WellEducatedEllipse6137
TK-812 (C12 Product Tank) Operations
5 questions
Use Quizgecko on...
Browser
Browser