Technical Instructions Quiz
21 Questions
0 Views

Technical Instructions Quiz

Created by
@MagicalSard9624

Questions and Answers

What is the initial step in the forming and punching process mentioned?

  • Cutting the raw material
  • Quality checking
  • Starting the forming and punching (correct)
  • Measuring the material
  • A length of approximately 3 meters is required for the raw material.

    True

    What features should the sheet include after forming and punching?

    pockets, sprocket hole, and center hole

    The sheet should have a __________ hole for proper functioning.

    <p>center</p> Signup and view all the answers

    Match the forming processes with their corresponding actions:

    <p>Forming = Creating shapes and structures Punching = Making holes in sheets Unwinding = Releasing material from coils Handling = Storing and moving raw materials</p> Signup and view all the answers

    What is the first step in the unwinding process of raw material?

    <p>Peel off the adhesive tape</p> Signup and view all the answers

    Cutting the barcode is the final step in the unwinding process.

    <p>True</p> Signup and view all the answers

    What should be done with the adhesive tape after it is peeled off?

    <p>It should be discarded.</p> Signup and view all the answers

    The __________ logo must be cut during the unwinding process.

    <p>barcode</p> Signup and view all the answers

    Match the following terms with their descriptions:

    <p>Unwinding = The process of removing the raw material from its packaging Forming = Shaping the raw material into its final form Installation = Setting up equipment for production Raw Material = The basic substance from which a product is made</p> Signup and view all the answers

    What is the correct procedure to position the raw material after unwinding?

    <p>Hang it on the fix roller shaft</p> Signup and view all the answers

    The fix roller is not used in the installation process of raw materials.

    <p>False</p> Signup and view all the answers

    Describe what should be done with the tail end of the raw material after peeling off the adhesive tape.

    <p>It should be pulled past the fix roller.</p> Signup and view all the answers

    What is the initial step in the process described?

    <p>Slowly pull the sheet</p> Signup and view all the answers

    The RETURN button is pressed to unlock the raw material.

    <p>False</p> Signup and view all the answers

    What measurement should be considered when pulling the sheet into the gripper?

    <p>Approximately 250 cm</p> Signup and view all the answers

    The sheet is inserted into the ______ gripper.

    <p>fix</p> Signup and view all the answers

    Match the process step with its appropriate action:

    <p>Pull the sheet = Initial step of handling RETURN button = Locks the raw material Insert into gripper = Secures the material for processing Pass 250 cm = Ensures material is ready for forming</p> Signup and view all the answers

    What happens after approximately 250 cm of the sheet passes the forming fix roller?

    <p>The sheet is locked in place</p> Signup and view all the answers

    The sheet should be eased into the machine without any tension.

    <p>True</p> Signup and view all the answers

    What is the purpose of the gripper in the process?

    <p>To secure the sheet for processing</p> Signup and view all the answers

    Study Notes

    Raw Material Installation Process

    • Begin by slowly pulling the sheet and inserting it into the fixing gripper.
    • Pull the sheet until approximately 250 cm passes through the forming fix roller.
    • Lock the raw material (sheet) by pressing the RETURN button.

    Unwinding & Forming Procedures

    • Peel off the adhesive tape from the tail end of the raw material.
    • Pass the material through the fix roller and cut the barcode logo, hanging it on the fix roller shaft.
    • Initiate the forming and punching process until a sheet with several features is produced.

    Specifications for Finished Sheet

    • The finished sheet should include:
      • Pockets
      • Sprocket hole
      • Center hole
    • The sheet produced should be approximately 3 meters in length.

    Effective Date

    • The outlined procedures are effective from December 1, 2023.

    Equipment and Items

    • No specific prohibited items or equipment are listed for this process.

    Safety and Compliance

    • Ensure compliance with the on-site safety regulations while handling raw materials and operating machinery.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your understanding of the technical instructions outlined in this quiz. Focus on the processes of pulling sheets and inserting them into fixes. Master the details for better application in practical situations.