What is the initial step in the forming and punching process mentioned?
What is the initial step in the forming and punching process mentioned?
A length of approximately 3 meters is required for the raw material.
A length of approximately 3 meters is required for the raw material.
True
What features should the sheet include after forming and punching?
What features should the sheet include after forming and punching?
pockets, sprocket hole, and center hole
The sheet should have a __________ hole for proper functioning.
The sheet should have a __________ hole for proper functioning.
Signup and view all the answers
Match the forming processes with their corresponding actions:
Match the forming processes with their corresponding actions:
Signup and view all the answers
What is the first step in the unwinding process of raw material?
What is the first step in the unwinding process of raw material?
Signup and view all the answers
Cutting the barcode is the final step in the unwinding process.
Cutting the barcode is the final step in the unwinding process.
Signup and view all the answers
What should be done with the adhesive tape after it is peeled off?
What should be done with the adhesive tape after it is peeled off?
Signup and view all the answers
The __________ logo must be cut during the unwinding process.
The __________ logo must be cut during the unwinding process.
Signup and view all the answers
Match the following terms with their descriptions:
Match the following terms with their descriptions:
Signup and view all the answers
What is the correct procedure to position the raw material after unwinding?
What is the correct procedure to position the raw material after unwinding?
Signup and view all the answers
The fix roller is not used in the installation process of raw materials.
The fix roller is not used in the installation process of raw materials.
Signup and view all the answers
Describe what should be done with the tail end of the raw material after peeling off the adhesive tape.
Describe what should be done with the tail end of the raw material after peeling off the adhesive tape.
Signup and view all the answers
What is the initial step in the process described?
What is the initial step in the process described?
Signup and view all the answers
The RETURN button is pressed to unlock the raw material.
The RETURN button is pressed to unlock the raw material.
Signup and view all the answers
What measurement should be considered when pulling the sheet into the gripper?
What measurement should be considered when pulling the sheet into the gripper?
Signup and view all the answers
The sheet is inserted into the ______ gripper.
The sheet is inserted into the ______ gripper.
Signup and view all the answers
Match the process step with its appropriate action:
Match the process step with its appropriate action:
Signup and view all the answers
What happens after approximately 250 cm of the sheet passes the forming fix roller?
What happens after approximately 250 cm of the sheet passes the forming fix roller?
Signup and view all the answers
The sheet should be eased into the machine without any tension.
The sheet should be eased into the machine without any tension.
Signup and view all the answers
What is the purpose of the gripper in the process?
What is the purpose of the gripper in the process?
Signup and view all the answers
Study Notes
Raw Material Installation Process
- Begin by slowly pulling the sheet and inserting it into the fixing gripper.
- Pull the sheet until approximately 250 cm passes through the forming fix roller.
- Lock the raw material (sheet) by pressing the RETURN button.
Unwinding & Forming Procedures
- Peel off the adhesive tape from the tail end of the raw material.
- Pass the material through the fix roller and cut the barcode logo, hanging it on the fix roller shaft.
- Initiate the forming and punching process until a sheet with several features is produced.
Specifications for Finished Sheet
- The finished sheet should include:
- Pockets
- Sprocket hole
- Center hole
- The sheet produced should be approximately 3 meters in length.
Effective Date
- The outlined procedures are effective from December 1, 2023.
Equipment and Items
- No specific prohibited items or equipment are listed for this process.
Safety and Compliance
- Ensure compliance with the on-site safety regulations while handling raw materials and operating machinery.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
Test your understanding of the technical instructions outlined in this quiz. Focus on the processes of pulling sheets and inserting them into fixes. Master the details for better application in practical situations.