Technical Aspect Consideration for Plant Design and Implementation
18 Questions
0 Views

Technical Aspect Consideration for Plant Design and Implementation

Created by
@ProlificMiami

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Program of Implementation includes Electrical works, Civil works, and ______ works.

mechanical

Present a GANTT CHART and PERT CPM of the Electrical works including testing and ______.

commissioning

Environmental considerations include DENR Standards and environmental design of water treatment facility, precipitators, ash disposal system equipment, or other emission system reduction control ______.

equipment

Power Plant Organization Chart outlines the number and scope of work of each ______.

<p>personnel</p> Signup and view all the answers

Power plant cost management and management structure are part of the ______ Aspect.

<p>Economic</p> Signup and view all the answers

Cost of energy in Peso per kW-hr should be ______ in the Economic Aspect.

<p>reasonable</p> Signup and view all the answers

One key factor to be considered in Power Plant Design is the Program of Implementation, which includes Gantt Chart and PERT-CPM for effective ____________.

<p>scheduling</p> Signup and view all the answers

The Power Plant Design Format includes a detailed background study, clear objectives, and a thorough ____________.

<p>load presentation</p> Signup and view all the answers

Under Load Presentation, one important aspect is Load Analysis which involves analyzing residential, commercial, industrial, or combined ____________.

<p>loads</p> Signup and view all the answers

Load graph presentation is crucial for understanding reserve over peak load, diversified load, and resultant load ____________.

<p>curve</p> Signup and view all the answers

Effective load dispatching requires proper generator unit ____________.

<p>scheduling</p> Signup and view all the answers

In Power Plant Schemes, if part of the grid, it is important to draw the typical or actual power systems ____________.

<p>line diagram</p> Signup and view all the answers

Program of Implementation: 6.1) Electrical works, Civil works, ________ works.

<p>mechanical</p> Signup and view all the answers

Program of Implementation: 6.2) Present a GANTT CHART and PERT CPM of the Electrical works including testing and ________.

<p>commissioning</p> Signup and view all the answers

Program of Implementation: 6.2) Present a ________ CHART and PERT CPM of the Electrical works including testing and commissioning.

<p>GANTT</p> Signup and view all the answers

Program of Implementation: 6.1) ________ works, Civil works, mechanical works.

<p>Electrical</p> Signup and view all the answers

Program of Implementation: 6.2) Present a GANTT CHART and PERT CPM of the Electrical works including ________ and commissioning.

<p>testing</p> Signup and view all the answers

Program of Implementation: 6.2) Present a GANTT CHART and ________ CPM of the Electrical works including testing and commissioning.

<p>PERT</p> Signup and view all the answers

Study Notes

Technical Aspect Considerations

  • Site location of power plant is crucial
  • Plant layout, equipment layout, and electrical study (fault analysis) are essential considerations
  • Design concept of switchyard and major equipment specifications are important
  • Transmission line data and specs, protective device and specs, and monitoring system equipment (SCADA facilities) are vital components

Program of Implementation

  • Electrical works, civil works, and mechanical works are necessary stages
  • Gantt chart and PERT-CPM are used to present the electrical works, including testing and commissioning

Environmental Considerations

  • DENR standards must be adhered to
  • Environmental design of water treatment facility, precipitators, ash disposal system equipment, and other emission system reduction control equipment are essential

Power Plant Organization Chart

  • Number and scope of work of each personnel are critical
  • Organization chart outlines the roles and responsibilities of each personnel

Economic Aspect

  • Power plant cost management is crucial
  • Power plant management structure includes key personnel, scope of responsibility during planning, construction, and post-construction stages
  • Investment cost, cost of energy in Peso per kW-hr, and recognition of funding agency are important considerations

Factors to be Considered in Power Plant Design

  • Types of load history (Residential, commercial, industrial or combination)
  • Details of electrical loads, location map, plant site, and load curve analysis
  • Scheduling of generating units operational, power plant equipment, and generating station
  • Power plant maintenance program and scheduling, power plant economics, and environmental considerations
  • Program of implementation, including Gantt chart and PERT-CPM, and rate cost of energy (ROR, YOR)

Power Plant Design Format

  • Introduction and background study
  • Objectives of the study
  • Load presentation: load analysis, load graph presentation, load dispatching, and power plant schemes

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Description

This quiz covers various technical aspects to consider in plant design, such as site location, plant layout, equipment layout, electrical studies, design concepts, and more. It also includes details about the program of implementation, covering electrical, civil, and mechanical works, GANTT CHART, and PERT CPM.

More Quizzes Like This

Aerial Plant Design Quiz
0 questions

Aerial Plant Design Quiz

InstrumentalSense avatar
InstrumentalSense
Gr12 Wiskunde Lit: Kwartaaltoets 3
64 questions
Use Quizgecko on...
Browser
Browser