What type of survey is required for an area of 5,000 hectares and above, involving inter-regional boundary dispute?
What is the minimum area required for a Reclamation Project Survey to be conducted under the SO category?
Which government office is responsible for conducting Mineral Land Surveys?
What is the maximum area for a Townsite Reservation and Group Settlement Survey to be conducted under the SO category?
Signup and view all the answers
What type of survey is conducted for areas of 12 hectares and below, under the SA category?
Signup and view all the answers
Which government office is responsible for conducting Parks and Protected Areas Delimitation Surveys for areas less than 5,000 hectares?
Signup and view all the answers
What must a GE secure before conducting surveys of lands of the public domain?
Signup and view all the answers
Who issues Survey Orders (SO) for delimitation surveys that cover two or more regions?
Signup and view all the answers
What is a Survey Authority (SA) issued for?
Signup and view all the answers
Who issues Survey Authorities (SA) for isolated land surveys?
Signup and view all the answers
What type of survey does the Admin, NAMRIA issue Survey Orders (SO) for?
Signup and view all the answers
Under what condition is a Survey Order (SO) issued by the Director, LMB?
Signup and view all the answers
Study Notes
Survey Categories and Requirements
- Cadastral Surveys, Survey Order (SO) required
- Parks and Protected Areas Delimitation Surveys, SO required for areas 5,000 hectares and above
- Political Boundary Survey, SO required if no inter-regional boundary dispute is involved
- Delimitation Survey for Watershed Reservation, SO required for areas 5,000 hectares and above in the same region
- Reclamation Project Surveys, SO required for areas 100 hectares and above
- Isolated Land Surveys, SO required for areas more than 100 hectares
- Survey of LGU Lands, SO required for areas more than 100 hectares
- Foreshore Land Surveys, Survey Authority (SA) required for areas more than 100 hectares
Regional Technical Director (RTD) for Lands
- Political Boundary Survey, SO required if involved areas are within the same city or municipality
- Public Land Subdivision, SO required
- Reclamation Project Surveys, SO required for areas less than 100 hectares
- Townsite Reservation and Group Settlement Surveys, SO required for areas up to 1500 hectares
- Isolated Land Surveys, SO required for areas more than 12 hectares, up to 100 hectares
- Survey of LGU Lands, SO required for areas up to 100 hectares
- Foreshore Land Surveys, SA required for areas 12 hectares up to 100 hectares
Mineral Land Surveys
- Regional Director MGB, SO required
RTD for Forestry
- Delimitation Survey for Watershed Reservation, SO required for areas in the same region less than 5,000 hectares
RTD for PAWCZMS
- Parks and Protected Areas Delimitation Surveys, SO required for areas less than 5,000 hectares
CENRO
- Isolated Land Surveys, SA required for areas 12 hectares and below
- Foreshore Land Surveys, SA required for areas 12 hectares and below
Survey Order and Survey Authority
- Survey Order (SO) refers to the instruction issued by the concerned DENR Official to conduct a survey over a parcel of land of the public domain or a specific survey project
- Survey Authority (SA) refers to the permit issued by the concerned DENR Official to a private Geodetic Engineer to conduct an isolated survey over public lands for public land application purposes
Issuance of Survey Order and Authority
- The following DENR officials shall issue SA/SO for the conduct of surveys of public and government land for land registration and other purposes:
- Secretary
- Director, LMB
- Admin, NAMRIA
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Learn about the rules and regulations surrounding survey orders and authorities in the Philippines, including the roles of government and private Geodetic Engineers.