730 Standard Operating Procedures: Switching Lime Silo when Empty.
12 Questions
3 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of the Standard Operating Procedure (SOP) mentioned in the text?

  • To clean the Lime Distribution Auger
  • To prepare a ‘Stand-By’ Lime Feeder to go online (correct)
  • To inspect the water production equipment
  • To shut down the Lime Slurry Feeder permanently

What happens if a ‘Stand-By’ Lime Feeder is placed into service without lime slurry available?

  • The lime distribution auger will get clogged
  • The Lime Slurry Drain Valve will close automatically
  • The FPW pH will remain stable
  • There will be an unnecessary dip in FPW pH (correct)

How can the ‘Knife Gate’ be identified?

  • It is operated by the Panel’s “Local/Remote” switch
  • It is a green-colored gate near the Silo
  • It has a red handle located on the East side of the Lime Distribution Auger
  • It is directly above the Lime Slurry Feeder and is operated by its 12” diameter wheel (correct)

Where is the Panel’s “Local/Remote” switch located?

<p>In front of the Lime Feeder Panel (B)</p> Signup and view all the answers

What does opening the ‘Knife Gate’ do?

<p>Allows the flow of lime from the Silo into the Lime Distribution Auger (B)</p> Signup and view all the answers

Where is the Lime Slurry Drain Valve located?

<p>On the West side of Feeders AO1and AO2, and the East side of Feeder BO1, and on both sides of Feeders AO3 and BO2 (A)</p> Signup and view all the answers

What will happen if the Drain Valve is placed in the Horizontal position?

<p>The Feeder Tank will drain (D)</p> Signup and view all the answers

When should the Button labeled Auto/Pre-Start be pressed?

<p>When the Slurry level is at 15 inches (C)</p> Signup and view all the answers

What should be done when the batching sequence begins?

<p>Place the Slurry Tank Drain Valve in the vertical position (D)</p> Signup and view all the answers

When should the slurry tank be drained again?

<p>At the end of the batching sequence (C)</p> Signup and view all the answers

How many times should the Lime Slurry Tank be drained/filled before placing the Lime Feeder into service?

<p>3 times (C)</p> Signup and view all the answers

What should be done after filling up the Lime Slurry Tank 3 times?

<p>Place the “Local/Remote” switch into “Remote” and notify the Control Room Operator (B)</p> Signup and view all the answers