Specification for Electronic Interlocking Quiz
38 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Match the following terms related to cross-acceptance with their corresponding definitions:

Cross acceptance = A process where a system is approved based on pre-existing certifications Indigenization = The requirement that a system uses locally sourced components Long Term Availability of Spares = The manufacturer's commitment to provide spare parts for an extended period Annual Repair Contract = A contract covering maintenance and repair of the system after the warranty expires

Match the following requirements with their primary purpose within the cross-acceptance process:

Training = Ensuring Railway officials have the expertise to operate and maintain the system Test &­ Repair facility = Providing a dedicated space for troubleshooting and repairing system components Certificates of Type tests = Verifying that the system meets pre-defined performance standards Sufficient inventory of consumable spares = Guaranteeing readily available components for system maintenance

Match the following sections of the document with their corresponding focus:

Para 16.3 = Requirements for cross-acceptance approval and ongoing support Para 16.4 = Exemptions from testing for cross-accepted systems and required documentation Para 15.2 = Type test procedures for verifying the system's functionality Para 15.4 = Routine test procedures for ensuring ongoing system performance

Match the following terms with their corresponding roles in the document:

<p>SE/Signal = Prepared the document DD/Signal-III = Checked the document Director/Signal-III = Issued the document RDSO = Organization responsible for the document</p> Signup and view all the answers

Match the following roles with their corresponding initials in the document.

<p>Prepared By = SE/Signal Checked By = DD/Signal-III Issued By = Director/Signal-III Approving Authority = Mahesh Mangal</p> Signup and view all the answers

Match the following document attributes with their respective values.

<p>Document No = RDSO/SPN/203/2011 Version No = 1 Date Effective = 13/09/2011 Document Title = SPECIFICATION FOR ELECTRONIC INTERLOCKING FOR BIG YARDS</p> Signup and view all the answers

Match the following individuals with their respective roles in the document's preparation.

<p>Jitendra Kumar = Member S.N.Ram = Member Alok Katiyar = Signing Authority Mahesh Mangal = Approving Authority</p> Signup and view all the answers

Match the following sections with their corresponding clause numbers.

<p>Foreword = 0.0 Scope = 1.0 Applicable/Reference Documents = 2.0 Terminology = 3.0</p> Signup and view all the answers

Match the following environmental/climatic requirements with their descriptions:

<p>Air-conditioning = Increase the life of components/system Non-air conditioned environment = Used for object controller RDSO/SPN/144 = Specification for indoor equipment Ambient atmospheric conditions = Conditions for conducting tests</p> Signup and view all the answers

Match the following warranty and availability requirements with their details:

<p>Three years warranty = Duration from commissioning of complete system Spare parts indication = For first line maintenance MTBF = More than one lac hours System availability = 99.98% or better operational availability</p> Signup and view all the answers

Match the following types of tests with their requirements:

<p>Routine tests = Carried out with essential testing equipment Type tests = Conducted using layout of existing stations Acceptance tests = Approved by RDSO Ambient tests = Conducted under normal atmospheric conditions</p> Signup and view all the answers

Match the following components with their functionalities:

<p>EI system = Includes equipment and subsystems Object controller = May be in non-air conditioned environment Testing equipment = Facilitates testing as per STR Vital modules = Need a high MTBF for reliability</p> Signup and view all the answers

Match the following statements about tests with their implications:

<p>Essential testing equipment = Necessity for conducting tests RDSO approval = Required for routine/acceptance tests Layout of existing stations = Used for type tests Ambient conditions = Default for all tests unless specified</p> Signup and view all the answers

Match the following environmental factors with their impact:

<p>Air conditioning = Reduces component wear Non-air conditioned rooms = May impact object controllers Environmental tests = Follow specific clauses Climatic requirements = Outline conditions for equipment usage</p> Signup and view all the answers

Match the following components with their descriptions:

<p>Central Interlocking Unit = Microprocessor-based system managing station-specific logic Centralised Train Control = Controls multiple stations from a central location Data Logger = Logs chronological events pertaining to signaling gears Object Controller = Miniature interlocking system near field gears</p> Signup and view all the answers

Match the following functions with their respective systems:

<p>Monitoring of internal variables = Central Monitoring Unit of Data Logger Executing commands for interlocking = Central Interlocking Unit Logging station events = Data Logger Traffic schedule management = Centralised Train Control</p> Signup and view all the answers

Match the following types of system availability with their metrics:

<p>Operational availability = Performance metric of the system MTBF of one lac hours = Reliability indicator Three years warranty = Guarantee of system integrity Spare parts for maintenance = Ensure system functionality</p> Signup and view all the answers

Match the following terms with their definitions:

<p>Warranty = Protection period after commissioning System availability = Percentage of operational time Type tests = Verification of design under operational conditions Ambient tests = Conducted at normal environmental settings</p> Signup and view all the answers

Match the following features with the appropriate system:

<p>Field Gear Control = Central Interlocking Unit Remote Status Monitoring = Central Monitoring Unit of Data Logger Chronological Event Tracking = Data Logger Command Execution from Central Location = Centralised Train Control</p> Signup and view all the answers

Match the following descriptions with their correct terms:

<p>System for logging events in sequence = Data Logger Integrated system for handling field gear commands = Object Controller Provides central oversight for signaling statuses = Central Monitoring Unit of Data Logger Facilitates traffic management across multiple stations = Centralised Train Control</p> Signup and view all the answers

Match the following systems with their characteristics:

<p>Central Interlocking Unit = Interlocking based on vital inputs Centralised Train Control = Updates field status on a monitoring screen Data Logger = RDSO approved for event logging Object Controller = Communicates with CIU for commands</p> Signup and view all the answers

Match the following terms with their definitions:

<p>Central Interlocking Unit = Processes commands and generates outputs Centralised Train Control = Manages traffic schedules from a single point Data Logger = Records time-stamped events Object Controller = Communicates field gear statuses to CIU</p> Signup and view all the answers

Match the following operational features with the correct systems:

<p>Field gears control = Central Interlocking Unit Centralized operational traffic control = Centralised Train Control Monitoring condition of signaling systems = Central Monitoring Unit of Data Logger Field gear command processing = Object Controller</p> Signup and view all the answers

Match the following monitoring aspects with their respective systems:

<p>Monitoring internal system variables = Central Monitoring Unit of Data Logger Execution of interlocking commands = Central Interlocking Unit Tracking signaling event history = Data Logger Oversight of multiple station operations = Centralised Train Control</p> Signup and view all the answers

Match the following abbreviations with their full forms:

<p>QAP = Quality Assurance Program RBC = Radio Block Center RE = Railway Electrification RDSO = Research Development and Standards Organisation</p> Signup and view all the answers

Match the following systems with their functions:

<p>TPWS = Train Protection Warning System VGA = Video Graphic Array VDU = Visual Display Unit SIL = Safety Integrity Level</p> Signup and view all the answers

Match the following documents with their purposes:

<p>SM = Station Master STR = Schedule of Technical Requirements TOT = Transfer of Technology SAT = Site Acceptance Test</p> Signup and view all the answers

Match the following technologies with their applications:

<p>UV = Ultra Violet RTC = Timekeeping in systems TPWS = Collision prevention in trains VGA = Display output for graphical systems</p> Signup and view all the answers

Match the following entities with their roles:

<p>Checked By = DD/Signal-III Prepared By = SE/Signal Issued By = Director/Signal-III Version No = 1</p> Signup and view all the answers

Match the following elements with their relevant areas:

<p>Quality Assurance = QA Safety Integrity Level = SIL Signal Engineering = SEM Research Development = RDSO</p> Signup and view all the answers

Match the types of tests with their descriptions:

<p>Visual inspection = Clause 15.1 Insulation Resistance tests = Clause 15.2 System Software tests = Clause 15.5 Environmental tests = Relevant Clause of latest RDSO/SPN/144</p> Signup and view all the answers

Match the test types to their corresponding focus areas:

<p>Card-level functional tests = All cards System Diagnostics tests = Clause 15.4 Failed-safety tests = One card of each type Computerised testing = Permutations and combinations as per Clause 15.3</p> Signup and view all the answers

Match the acceptance tests with their specific requirements:

<p>Verification of application software = Selection table by user Railway Card level functional test = All the cards System level functional tests = Clause 15.2 Visual inspection = Clause 15.1</p> Signup and view all the answers

Match the testing entities with their roles:

<p>Independent Safety Assessor = Fail-safety tests RDSO = Sample testing and additional tests Purchaser = Determine necessity of additional tests User Railway = Software verification</p> Signup and view all the answers

Match the clauses with their corresponding test types:

<p>Clause 15.1 = Visual inspection Clause 15.2 = Insulation Resistance tests Clause 15.3 = Computerised testing Clause 15.4 = System Diagnostics test</p> Signup and view all the answers

Match the types of tests with their scopes:

<p>System level functional tests = Overall system performance Fail-safety tests = Redundancy checks on specific cards Environmental/climatic tests = Indoor Equipment relevance Card-level functional tests = Individual card operations</p> Signup and view all the answers

Match the outcomes of tests with corresponding actions:

<p>Fail in any type test = Call for another equipment/card Pass all type tests = Conformity with specification achieved Perform repeat test(s) = No failures allowed Any other tests mandated = Considered necessary by RDSO or purchaser</p> Signup and view all the answers

Match the following tests with their nature:

<p>Card-level functional tests = Operational capability assessment System Diagnostics test = Fault detection and analysis Environmental tests = Compliance with climatic conditions Visual inspection = Physical conformity check</p> Signup and view all the answers

Study Notes

Document Information

  • Document Number: RDSO/SPN/203/2011
  • Document Title: SPECIFICATION FOR ELECTRONIC INTERLOCKING FOR BIG YARDS
  • Version Number: 1
  • Date Effective: 13/09/2011
  • Number of Pages: 24
  • Organization: RESEARCH DESIGNS & STANDARDS ORGANIZATION, MANAK NAGAR, LUCKNOW – 226011
  • Signal Directorate
  • Ministry of Railways
  • Prepared By: SE/Signal
  • Checked By: DD/Signal-III
  • Issued By: Director/Signal-III

Document Data Sheet

  • Designation: RDSO/SPN/203/2011
  • Version Number: 1.0
  • Title of Document: Specification for Electronic Interlocking For Big Yards
  • Authors: See Document Control Sheet
  • Signed by: Alok Katiyar, designation: Director/Signal/RDSO, and Shri Mahesh Mangal, designation: Sr. Executive Director/Signal, RDSO
  • Abstract: This document defines Electronic Interlocking For big Yards.

Electronic Interlocking

  • Scope: This specification covers the technical requirements of Electronic Interlocking for big yards at stations with more than 200 routes.
  • Equipment: Microprocessor/Microcontroller based equipment used for operation of points, signals, track circuits, level crossings, and manual controls. It interfaces with ATP, TPWS, ETCS, Radio Block Centre, and CTC.

Table of Contents

  • Lists sections like Foreword, Scope, Applicable/Reference Documents, Terminology, Definitions, General Requirements, and others
  • Includes detailed sections on technical requirements, software, and hardware requirements for Electronic Interlocking systems
  • Specific clauses detailed out (e.g., Functional requirements, Technical requirements, Software requirements, System architecture, Object Controller, Power supply requirements, Safety requirements)

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Description

Test your knowledge on the RDSO/SPN/203/2011 specification for electronic interlocking systems designed for big yards. This quiz covers key concepts, technical requirements, and standards related to electronic interlocking in railway signaling systems. Perfect for professionals in the railway sector looking to refresh their expertise.

More Like This

Signalling Circuits Design Criteria Quiz
42 questions
Electronic Interlocking Systems for Big Yards
48 questions
Electronic Interlocking for Big Yards
45 questions
Use Quizgecko on...
Browser
Browser