The portion of the building above the ground is called the ______

superstructure

The habitable portion of the building found below the ground is called the ______

substructure

The structural portion of the building that transfers the building's load into the soil is called the ______

foundation

A slab which rests on the ground and is not suspended is called a slab on ______

fill

In a building without a basement, an unfinished accessible space below the first floor, usually less than a full story height, is called a ______

crawl space

The low story of a building, either partly or entirely below grade, is called a ______

basement

Square is a ________ foundation loads

perpendicular

Square – ________ FOUNDATION LOADS

dead

Square – perpendicular FOUNDATION ________

LOADS

______ and snow loads

Rain

Boulder – an individual particle of soil requiring two hands to ________

lift

Rock – is a continuous mass of solid mineral material that can only be removed by ________ and blasting

drilling

Gravel – soil particle requiring only ________ and forefinger to lift

thumb

Clay – consist of nonvisible particles that are ________ shaped

plate

Silt – consists of non-visible soil particles that are ________

equidimensional

TEST PITS – can be dug when the ________ will not extend deeper than roughly 16ft (3m)

foundation

The major parts of a building above the ground are called the ______

superstructure

The portion of the building found below the ground is called the ______

substructure

A slab which rests on the ground and is not suspended is called a slab on ______

fill

The structural portion of the building that transfers the building's load into the soil is called the ______

foundation

In a building without a basement, an unfinished accessible space below the first floor, usually less than a full story height, is called a ______

crawl space

The low story of a building, either partly or entirely below grade, is called a ______

basement

Buoyant uplift forces from underground water exert ________ on the structure

pressure

The range of particle sizes present, or gradation, may vary. Well graded soil includes a broad, well-distributed range of ________ sizes

particle

The elevation at which the soil is normally fully saturated is known as the ________

water table

Standard penetration tests can give an indication of the bearing capacity of the soil by the number of blows of a standard driving hammer required to advance a sampling tube into the soil by a fixed ________

amount

On undeveloped sites, construction may begin with grubbing and clearing, in which trees and plants, stumps, large roots, and other surface materials are removed with heavy ________

machinery

Next, organically rich topsoil may be scraped away and stockpiled to one side, to await reuse at the end of ________

construction

Sheet piling is installed with a vibratory ________

driver

The structural portion of the building that transfers the building's load into the soil is called the ________

foundation

A slab which rests on the ground and is not suspended is called a slab on ________

grade

Slope support techniques include sheeting, soldier beams & lagging, shotcrete, slurry wall, soil mixing, and ________

bracing

Test your knowledge on various aspects of site works and foundation, including master format, building parts, site layout, foundation loads, soil, testing, excavation, and construction methods such as sheet piles, slurry walls, soil mixing, bracing, and tie backs.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Use Quizgecko on...
Browser
Browser