32 Questions
The portion of the building above the ground is called the ______
superstructure
The habitable portion of the building found below the ground is called the ______
substructure
The structural portion of the building that transfers the building's load into the soil is called the ______
foundation
A slab which rests on the ground and is not suspended is called a slab on ______
fill
In a building without a basement, an unfinished accessible space below the first floor, usually less than a full story height, is called a ______
crawl space
The low story of a building, either partly or entirely below grade, is called a ______
basement
Square is a ________ foundation loads
perpendicular
Square – ________ FOUNDATION LOADS
dead
Square – perpendicular FOUNDATION ________
LOADS
______ and snow loads
Rain
Boulder – an individual particle of soil requiring two hands to ________
lift
Rock – is a continuous mass of solid mineral material that can only be removed by ________ and blasting
drilling
Gravel – soil particle requiring only ________ and forefinger to lift
thumb
Clay – consist of nonvisible particles that are ________ shaped
plate
Silt – consists of non-visible soil particles that are ________
equidimensional
TEST PITS – can be dug when the ________ will not extend deeper than roughly 16ft (3m)
foundation
The major parts of a building above the ground are called the ______
superstructure
The portion of the building found below the ground is called the ______
substructure
A slab which rests on the ground and is not suspended is called a slab on ______
fill
The structural portion of the building that transfers the building's load into the soil is called the ______
foundation
In a building without a basement, an unfinished accessible space below the first floor, usually less than a full story height, is called a ______
crawl space
The low story of a building, either partly or entirely below grade, is called a ______
basement
Buoyant uplift forces from underground water exert ________ on the structure
pressure
The range of particle sizes present, or gradation, may vary. Well graded soil includes a broad, well-distributed range of ________ sizes
particle
The elevation at which the soil is normally fully saturated is known as the ________
water table
Standard penetration tests can give an indication of the bearing capacity of the soil by the number of blows of a standard driving hammer required to advance a sampling tube into the soil by a fixed ________
amount
On undeveloped sites, construction may begin with grubbing and clearing, in which trees and plants, stumps, large roots, and other surface materials are removed with heavy ________
machinery
Next, organically rich topsoil may be scraped away and stockpiled to one side, to await reuse at the end of ________
construction
Sheet piling is installed with a vibratory ________
driver
The structural portion of the building that transfers the building's load into the soil is called the ________
foundation
A slab which rests on the ground and is not suspended is called a slab on ________
grade
Slope support techniques include sheeting, soldier beams & lagging, shotcrete, slurry wall, soil mixing, and ________
bracing
Test your knowledge on various aspects of site works and foundation, including master format, building parts, site layout, foundation loads, soil, testing, excavation, and construction methods such as sheet piles, slurry walls, soil mixing, bracing, and tie backs.