Scientific Management Overview
22 Questions
2 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary purpose of a Fishbone Diagram?

To identify and analyze the root causes of a specific problem.

Name one potential solution that could arise from analyzing a Fishbone Diagram.

Improved training for staff or better machinery.

What is the primary purpose of a Gantt chart in project planning?

A Gantt chart is used for project or process planning to show projected time and track progress.

How does the PERT chart help in project scheduling?

<p>The PERT chart identifies a network of events and activities, with the longest path determining the minimum completion time, known as the critical path.</p> Signup and view all the answers

List two tools used in the recording and analysis phase of the Methods Engineering Process.

<p>Operation process chart and flow process chart are two tools used for this purpose.</p> Signup and view all the answers

What does the 'Operation' symbol represent in an Operation Process Chart?

<p>The 'Operation' symbol represents a specific task or step in the operation being analyzed.</p> Signup and view all the answers

What questioning attitude should be adopted when reviewing an operation process chart?

<p>One should ask questions to determine the purpose of the operation, potential performers, and areas for improvement.</p> Signup and view all the answers

What are the main objectives of methods, standards, and work design according to scientific management?

<p>The main objectives include minimizing time for tasks, improving quality and reliability, and conserving resources.</p> Signup and view all the answers

What role do safety, health, and environmental concerns play in methods engineering?

<p>Safety, health, and environmental concerns are prioritized to maximize employee well-being and promote sustainable practices.</p> Signup and view all the answers

What is the effect of adopting a humane program of management according to the objectives of scientific management?

<p>A humane program of management leads to increased job interest and satisfaction among employees.</p> Signup and view all the answers

What is the purpose of a flow process chart?

<p>To provide a detailed view of a component or system and identify non-productive periods.</p> Signup and view all the answers

How can material handling be a hindrance in operational efficiency?

<p>Material handling can introduce delays and increase storage times, negatively impacting the flow of production.</p> Signup and view all the answers

What elements should be questioned during a flow process chart review?

<p>All elements that add time to the operation, including delays, storage times, and material handling.</p> Signup and view all the answers

What are the primary uses of a flow process chart?

<p>To track materials and to track workers during operations.</p> Signup and view all the answers

How does a worker and machine process chart assist in operational analysis?

<p>It visually examines the work cycles of both the operator and machines, showing active and idle times.</p> Signup and view all the answers

What is the goal of constructing a gang process chart?

<p>To achieve an appropriate balance between machine idle time and operators' idle time.</p> Signup and view all the answers

Why is plant layout important in flow process analysis?

<p>An effective plant layout minimizes travel distances and reduces traffic congestion.</p> Signup and view all the answers

List the first two steps of the Methods Engineering Process.

<p>The first two steps are to select the project and gather &amp; summarize existing information.</p> Signup and view all the answers

What is the significance of the 80-20 rule in Pareto analysis?

<p>The 80-20 rule suggests that approximately 80% of consequences come from 20% of the causes.</p> Signup and view all the answers

What is a cause-and-effect diagram commonly used for in Methods Engineering?

<p>The cause-and-effect diagram, or fishbone diagram, is used to identify potential causes of a problem.</p> Signup and view all the answers

How do Gantt charts assist in project management?

<p>Gantt charts visually represent a project schedule, showing the start and end dates of tasks.</p> Signup and view all the answers

Which analysis technique is used to illustrate where to focus attention in improving processes?

<p>Pareto analysis is used to illustrate where to focus attention and efforts in process improvement.</p> Signup and view all the answers

Study Notes

Scientific Management

  • Scientific management, pioneered by Frederick Taylor, is a management approach focused on optimizing efficiency in the workplace.
  • Key objectives of methods, standards, and work design include minimizing task time, improving product quality and reliability, conserving resources and minimizing costs, considering power costs and availability, maximizing employee safety and well-being, and emphasizing environmental protection and a humane work environment.
  • Frederick Winslow Taylor (1856-1915) is considered the "father of scientific management". His approach involved experimenting to find the best method for performing tasks and assigning specific tasks to workers with a definite time schedule.
  • Taylor's four key principles for managers focus on replacing rule of thumb with scientific methods, selecting and training the best workers, co-operating with workers to ensure their method adherence, and dividing labor responsibilities between management and labor.
  • Modern time study, a concept developed by Taylor, involved planning work one day in advance, providing written instructions to workers, using time studies by experts to determine standard times for jobs, and breaking tasks into "elements."
  • Taylor's work didn't immediately gain widespread adoption. He published his findings in 1903, and his ideas eventually led to a larger "efficiency madness" across the nation and the world.
  • Frank and Lillian Gilbreth also contributed significantly to the field, pioneering motion study and developing micro motion study procedures.
  • Their predetermined time systems are foundational to current practices. Techniques were also applied in industry, surgery, and homes to improve productivity for those with and without disabilities.

Gilbreths' Techniques

  • The Gilbreths photographed and filmed motions to understand worker movements and tasks.
  • Cyclographic analysis involved lighting workers' fingers to record movement paths on film.
  • Chrono-cyclographic analysis used strobe lights to visualize the detailed movements of the body as photographs.
  • They divided motions into smaller, basic elements called "therbligs".

Engineering Method

  • The process begins by defining the problem and researching. Then, requirements are specified, and a solution is chosen after brainstorming and evaluation.
  • A prototype solution is developed and tested. The results are used to make changes, refine prototypes, and test again, eventually leading to improved results.
  • Finally, the solution is communicated.

Methods Engineering Process

  • The process is structured and focused, starting with selecting a project and gathering and summarizing existing information for the operation.
  • Analysis of the information leads to a developed method that is presented and implemented.
  • The process includes job analysis, setting time standards, and follow up maintenance for long term gain.
  • Recording and analysis tools used in the procedures include operation charts, flow process charts, flow diagrams, worker and machine process charts, and gang process charts.

Exploratory Tools

  • This is used to assist in project selection.
  • Tools that are included in this are Pareto analysis, fishbone analysis (cause and effect), gantt charts, and pert charts.

Pareto Analysis

  • It's a cumulative frequency distribution to highlight areas demanding attention.
  • The 80/20 rule suggests 80% of consequences arise from 20% of causes (important to focus your efforts).
  • Pareto analysis applies to industrial accidents and determining the most critical process areas to improve on.

Fishbone Diagram (Cause-and-Effect Diagram)

  • It's a visual tool to pinpoint root causes of problems by exploring various factors.
  • A fishbone diagram helps to organize and brainstorm causes into general categories (often called the 6 Ms, for example environment, materials etc.).

Gantt Chart

  • This chart is used for project or process planning by outlining projected time allocations for tasks.
  • Gantt charts display the progress of tasks making it easy to identify task interactions.

PERT Chart (Program Evaluation and Review Technique)

  • This is a project scheduling technique using a network of events and tasks.
  • The longest path through the network defines the minimum time needed to complete the project and is called the critical path.

Operation Process Charts

  • Provides a visual blueprint of each operation step-by-step.
  • Provides a summarized overview of the sequence of steps, inspections, time required, and use of materials involved in an operation.
  • Charts can also be used to record the time taken for each action.

Flow Process Charts

  • Flow charts that include worker and material movements in an operation.
  • The charts can be used to analyze existing layouts or to design more efficient processes.

Flow Diagram

  • Shows the movement of parts or people using the current plant layout.
  • Shows the identification of non-productive periods, congestion, and travel distances.
  • Flows can also help in the improvement of plant layout and process.

Worker and Machine Process Chart

  • This chart helps to visually analyze an operator and their tools (e.g., machine) and their actions/cycles of operation.
  • This chart helps to understand the worker-tool balance and identify active and idle time periods.

Gang Process Chart

  • Helps with visually identifying work cycles for multiple operators.
  • The aim is to determine the appropriate balance between machine idle time and operators' idle time, as well as the work balance among operators.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

Description

Explore the principles of scientific management defined by Frederick Taylor. This quiz highlights the key objectives and methods aimed at improving workplace efficiency, quality, and safety. Test your knowledge of Taylor's approach and its impact on management practices.

More Like This

Use Quizgecko on...
Browser
Browser