Saudia Technic Maintenance and Quality Control Manual
16 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary purpose of the Saudia Technic Repair Station and Quality Control Manual?

  • To provide a history of aircraft maintenance
  • To detail procedures and standards for aircraft maintenance (correct)
  • To outline employee benefits and welfare
  • To document financial management practices
  • Which part of GACAR does Saudia Technic comply with to operate as a certificated repair station?

  • GACAR Part-43
  • GACAR Part-150
  • GACAR Part-145 (correct)
  • GACAR Part-41
  • Who maintains the original GACA Repair Station Certificate and Operations Specifications?

  • The Human Resources Manager
  • The Chief Engineer
  • The Operations Supervisor
  • The Director of Safety and Quality Assurance (correct)
  • What is a key point of Saudia Technic's Quality Policy?

    <p>Enhancing employee skills through training</p> Signup and view all the answers

    What does Saudia Technic emphasize for avoiding defects in their maintenance process?

    <p>Process control and continuous improvement</p> Signup and view all the answers

    Where is the main station that houses the GACA Repair Station Certificate located?

    <p>KAIA Building 202 in Jeddah</p> Signup and view all the answers

    What is recognized as the most valuable resource by Saudia Technic?

    <p>Employees</p> Signup and view all the answers

    How does Saudia Technic aim to assist customers according to their quality policy?

    <p>By minimizing downtime</p> Signup and view all the answers

    What is the primary purpose of maintenance procedures in Saudia Technic (ST)?

    <p>To ensure compliance with regulatory standards and company policies</p> Signup and view all the answers

    Which type of maintenance can Saudia Technic (ST) arrange for another person to perform?

    <p>Any maintenance, preventive maintenance, or alterations</p> Signup and view all the answers

    What must be ensured if a non-certificated person performs maintenance for ST?

    <p>They must follow ST's quality control system</p> Signup and view all the answers

    Which inspection occurs before any maintenance work begins?

    <p>Preliminary Inspection</p> Signup and view all the answers

    What is involved in the Receiving (Incoming) Inspection?

    <p>Examining incoming parts and materials for standards compliance</p> Signup and view all the answers

    Which inspection type is conducted to look for damage that may not be visible initially?

    <p>Hidden Damage Inspection</p> Signup and view all the answers

    What is the final step after maintenance is performed on an article by ST?

    <p>Approval for Return to Service</p> Signup and view all the answers

    What does 'Suspected Unapproved Parts (SUP)' refer to?

    <p>Parts suspected of not meeting the required standards</p> Signup and view all the answers

    Study Notes

    Saudia Technic Repair Station and Quality Control Manual

    • The manual is applicable to Saudia Technic when performing maintenance, preventive maintenance, or alterations on aircraft, engines, and components.
    • Saudia Technic complies with GACA regulations (GACAR) to operate as a certified repair station.
    • The manual combines Repair Station Manual and Quality Control Manual.
    • Saudia Technic's maintenance services adhere to GACA standards.

    Compliance

    • Saudia Technic adheres to GACA Repair Station Certificate, its authorized ratings, and Operations Specifications.
    • The Director of Safety and Quality Assurance holds the original GACA certificates.
    • Repair Station and Quality Control manuals are always accessible in each work area.
    • Saudia Technic allows inspections of documents by customers and GACA.

    Quality Policy

    • Saudia Technic is committed to safe and reliable maintenance services.
    • Key focus areas include:
      • Process control and continuous improvement.
      • Employee skills and teamwork.
      • Customer support and workforce morale.
      • Planning and trend monitoring.

    Maintenance Procedures

    • Saudia Technic performs maintenance, preventive maintenance, or alterations on aircraft, engines and components, for which it is rated.
    • Saudia Technic can arrange for another person to perform maintenance, but must ensure that a quality control system equivalent to its own is followed.
    • Saudia Technic approves for return to service any article for which it is rated, after maintenance has been performed in accordance with GACAR Part 43.

    Inspection Procedures

    • Procedures are in place for receiving (incoming) inspection, ensuring parts meet required standards.
    • Procedures are in place to identify and manage suspected unapproved parts.
    • A preliminary inspection assesses the condition of the article and identifies defects.
    • Hidden Damage inspections aim to locate hidden damage.
    • In-process inspections monitor work at various stages.
    • Final inspection is conducted after maintenance work is completed, to ensure safe operation and compliance with regulatory requirements.
    • The final step involves approving the article for return to service, certifying that it has been maintained in accordance with regulations.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the Saudia Technic Repair Station manual and the quality control processes that are in place to ensure compliance with GACA regulations. It includes information on maintenance practices, quality policies, and the structure of quality assurance within the organization. Explore how Saudia Technic maintains safe and reliable services in line with regulatory standards.

    More Like This

    Use Quizgecko on...
    Browser
    Browser