What is the primary responsibility of the Applier in the context of digital instrumentation and control?
What is the primary responsibility of the Applier in the context of digital instrumentation and control?
Which organization has the ultimate responsibility for the safety application and its impact on plant safety?
Which organization has the ultimate responsibility for the safety application and its impact on plant safety?
What is the primary focus of this module in the context of digital instrumentation and control?
What is the primary focus of this module in the context of digital instrumentation and control?
What is the role of the Qualifier in the context of digital instrumentation and control?
What is the role of the Qualifier in the context of digital instrumentation and control?
Signup and view all the answers
What is implicit in the qualification process?
What is implicit in the qualification process?
Signup and view all the answers
What is the temperature range for environmental qualification in IEEE 323?
What is the temperature range for environmental qualification in IEEE 323?
Signup and view all the answers
Which of the following is NOT a part of seismic qualification requirements in IEEE 344?
Which of the following is NOT a part of seismic qualification requirements in IEEE 344?
Signup and view all the answers
What is the minimum voltage required for environmental qualification in IEEE 323?
What is the minimum voltage required for environmental qualification in IEEE 323?
Signup and view all the answers
Which of the following is a part of EMI/RFI requirements?
Which of the following is a part of EMI/RFI requirements?
Signup and view all the answers
How many simulated seismic events are required for seismic qualification in IEEE 344?
How many simulated seismic events are required for seismic qualification in IEEE 344?
Signup and view all the answers
What is the first step in the qualification process for nuclear Class 1E application?
What is the first step in the qualification process for nuclear Class 1E application?
Signup and view all the answers
What is the primary purpose of equipment qualification?
What is the primary purpose of equipment qualification?
Signup and view all the answers
What is the difference between the service conditions and the conditions used for equipment qualification?
What is the difference between the service conditions and the conditions used for equipment qualification?
Signup and view all the answers
What is the environment expected as a result of normal service conditions and extremes in service conditions where seismic is the only design basis event?
What is the environment expected as a result of normal service conditions and extremes in service conditions where seismic is the only design basis event?
Signup and view all the answers
What is the period of time, prior to the start of a design basis event, for which equipment was demonstrated to meet the design requirements?
What is the period of time, prior to the start of a design basis event, for which equipment was demonstrated to meet the design requirements?
Signup and view all the answers
What is the interval from installation to removal, during which the equipment or component may be subject to design service conditions and system demands?
What is the interval from installation to removal, during which the equipment or component may be subject to design service conditions and system demands?
Signup and view all the answers
What is the environment expected as a result of a loss of cooling accident or high energy line break inside containment?
What is the environment expected as a result of a loss of cooling accident or high energy line break inside containment?
Signup and view all the answers
What is the primary requirement for power supplies connected to AC sources?
What is the primary requirement for power supplies connected to AC sources?
Signup and view all the answers
What is the maximum allowed change in any other channel on the module when applying a signal within the specified range for analog outputs?
What is the maximum allowed change in any other channel on the module when applying a signal within the specified range for analog outputs?
Signup and view all the answers
What is the minimum frequency range for power supplies connected to AC sources?
What is the minimum frequency range for power supplies connected to AC sources?
Signup and view all the answers
What is the basis for the power capability of a power supply?
What is the basis for the power capability of a power supply?
Signup and view all the answers
What is the minimum multiple of the bus loading that a power supply must be capable of supplying?
What is the minimum multiple of the bus loading that a power supply must be capable of supplying?
Signup and view all the answers
What type of transient is not included in the qualification process?
What type of transient is not included in the qualification process?
Signup and view all the answers
What is the main issue with the guidance provided by Regulatory positions 2.1-2.9 of RG 1.152 and NEI 04-04?
What is the main issue with the guidance provided by Regulatory positions 2.1-2.9 of RG 1.152 and NEI 04-04?
Signup and view all the answers
What is the purpose of the Interim Staff Guidance developed by the Cyber Security TWG?
What is the purpose of the Interim Staff Guidance developed by the Cyber Security TWG?
Signup and view all the answers
What is the current status of the ISG on cyber security released in August 2007?
What is the current status of the ISG on cyber security released in August 2007?
Signup and view all the answers
What is the limitation of NEI 04-04 Rev 2?
What is the limitation of NEI 04-04 Rev 2?
Signup and view all the answers
What is the goal of the NRC-NEI TWG activities?
What is the goal of the NRC-NEI TWG activities?
Signup and view all the answers
When is the due date for the deliverable of the Cyber Security TWG?
When is the due date for the deliverable of the Cyber Security TWG?