Quality Control of Trial Products Quiz
17 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of the IPQC process monitoring in trial production?

  • To check the quality of the final product
  • To determine the cost of trial production
  • To audit the trial production line for any abnormalities (correct)
  • To increase the speed of the production line
  • What is the consequence if the first pass rate for printing solder paste board does not meet the standard?

  • Tracking for 1 hour without any follow-up measures (correct)
  • Reporting to senior management only
  • No action is required
  • Immediate improvement actions are taken
  • What is the threshold for the furnace front AOI DVT pass-through rate to trigger an action?

  • Higher than 92%
  • Lower than 50% for 2 consecutive hours (correct)
  • Higher than 95%
  • Lower than 30% for 1 hour
  • How many PCS of solder paste board error trigger a tracking without cause and improvement measures in visual inspection after furnace?

    <p>5 PCS with poor parity numbers</p> Signup and view all the answers

    What happens if X-RAY inspection is conducted?

    <p>Defects are checked at a deeper level</p> Signup and view all the answers

    What is the purpose of the Quantity Summary Evaluation Meeting mentioned in the text?

    <p>To finalize the project score and discuss trial production improvement plans.</p> Signup and view all the answers

    When does SMT Quality publish the Quantity Summary Report according to the text?

    <p>After tracking the implementation of improvement measures.</p> Signup and view all the answers

    Who informs the SMT Minister and Supervisor of the final time of the project summary meeting?

    <p>NPI</p> Signup and view all the answers

    What are the main review points of the new model's mass production summary according to the text?

    <p>Improvement of trial production leftover</p> Signup and view all the answers

    What must each module do within two days after receiving the quality notice based on the text?

    <p>Summarize indicators, scores, problem points, and feedback quality.</p> Signup and view all the answers

    What is the purpose of collecting problem points improvement plans from responsible persons before the meeting?

    <p>To pre-score the project and inform senior management.</p> Signup and view all the answers

    What is the reason for tracking 1H without cause in the context of solder paste board quality control?

    <p>BB elongated/defective headrest *2PCS</p> Signup and view all the answers

    In AOI quality control, what action is taken if the team leader is found to be abnormal?

    <p>A notification is sent after confirmation by the team leader.</p> Signup and view all the answers

    What is the requirement for X-RAY inspection in the visual inspection process, according to the text?

    <p>For every 100 stacking models produced, X-RAY needs to be sent to X-RAY machines.</p> Signup and view all the answers

    What action is taken in scoreboard quality control if shipment and production are suspended without reasons?

    <p>Quality team leader and above will lift the ban.</p> Signup and view all the answers

    What warrants sending models for X-RAY inspection after production in the visual inspection process?

    <p>The first frame of 200 ordinary models produced.</p> Signup and view all the answers

    What kind of soldering board quality issue leads to a stop in pulling or single-chip tracking for 1 hour with no reason for improvement measures?

    <p>*2PCS stop pulling or single-chip tracking</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser