project 3 - 2storey administration extension building
22 Questions
3 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

as designed and applied to this project, the yards abutting the RROW are for ______

  • landscape (correct)
  • off-RROW loading spaces
  • driveways
  • short-term off-street parking

the measurement of lot occupancy taken from ground level includes the ______

  • stair well
  • courts
  • yards (correct)
  • light wells

what is the maximum width, in meters, of the driveway if its for one way

  • 8
  • 10
  • 5 (correct)
  • 6

what is the defined approximate total impervious area (ISA) of this project in square meter including the docking/delivery platform

<p>319 (C)</p> Signup and view all the answers

what is the defined approximate unpaved surface area (USA) of this project in square meters

<p>478 (B)</p> Signup and view all the answers

what will be the least total area of the windows at the engineering department office in square meters

<p>10% of total area (A)</p> Signup and view all the answers

what is the least width in meters. of the t&b shower

<p>0.90 (A)</p> Signup and view all the answers

the most suitable and practical door for the workshop are _________

<p>double-swing (B)</p> Signup and view all the answers

what is the minimum width, in meters, of the sidewalk in each side of the RROW

<p>1.20 (D)</p> Signup and view all the answers

the most appropriate floor tiles to use for the open decks are _______________

<p>non skid (C)</p> Signup and view all the answers

the most appropriate floor finish for the storage is ________

<p>ceramic tiles (B)</p> Signup and view all the answers

the most appropriate floor finish for the workshop is

<p>rubberized paint (C)</p> Signup and view all the answers

the most appropriate floor finish for the business center is/are ___________________

<p>ceramic tiles (D)</p> Signup and view all the answers

the most appropriate floor finish for the office is _________________

<p>vinyl (D)</p> Signup and view all the answers

find the vertical drop of the toilet of the gicen slope in meters at 5 meters from the sidewalk/property line

<p>-0.10 (D)</p> Signup and view all the answers

a detailed analysis of the site involving the identification of site development potentials through proper planning is called __________________

<p>site utilization and land use studies (B)</p> Signup and view all the answers

area allotted for the industrial area of the project in sqm considering the heavy equipment

<p>4250 (A)</p> Signup and view all the answers

considering the topography of the site where can be the natural location to which the storm drains pipes are directed

<p>eastwest (A)</p> Signup and view all the answers

how many exact cubic meters of 25tons capacity truck will be used front yard has a need for a backfill

<p>17.86 (A)</p> Signup and view all the answers

what is not a secondary color

<p>yellow (D)</p> Signup and view all the answers

ewrawe

<p>werw (A)</p> Signup and view all the answers

what is not a tertiary color

<p>blue red (D)</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser