project 3 - 2storey administration extension building
22 Questions
3 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

as designed and applied to this project, the yards abutting the RROW are for ______

  • landscape (correct)
  • off-RROW loading spaces
  • driveways
  • short-term off-street parking
  • the measurement of lot occupancy taken from ground level includes the ______

  • stair well
  • courts
  • yards (correct)
  • light wells
  • what is the maximum width, in meters, of the driveway if its for one way

  • 8
  • 10
  • 5 (correct)
  • 6
  • what is the defined approximate total impervious area (ISA) of this project in square meter including the docking/delivery platform

    <p>319</p> Signup and view all the answers

    what is the defined approximate unpaved surface area (USA) of this project in square meters

    <p>478</p> Signup and view all the answers

    what will be the least total area of the windows at the engineering department office in square meters

    <p>10% of total area</p> Signup and view all the answers

    what is the least width in meters. of the t&b shower

    <p>0.90</p> Signup and view all the answers

    the most suitable and practical door for the workshop are _________

    <p>double-swing</p> Signup and view all the answers

    what is the minimum width, in meters, of the sidewalk in each side of the RROW

    <p>1.20</p> Signup and view all the answers

    the most appropriate floor tiles to use for the open decks are _______________

    <p>non skid</p> Signup and view all the answers

    the most appropriate floor finish for the storage is ________

    <p>ceramic tiles</p> Signup and view all the answers

    the most appropriate floor finish for the workshop is

    <p>rubberized paint</p> Signup and view all the answers

    the most appropriate floor finish for the business center is/are ___________________

    <p>ceramic tiles</p> Signup and view all the answers

    the most appropriate floor finish for the office is _________________

    <p>vinyl</p> Signup and view all the answers

    find the vertical drop of the toilet of the gicen slope in meters at 5 meters from the sidewalk/property line

    <p>-0.10</p> Signup and view all the answers

    a detailed analysis of the site involving the identification of site development potentials through proper planning is called __________________

    <p>site utilization and land use studies</p> Signup and view all the answers

    area allotted for the industrial area of the project in sqm considering the heavy equipment

    <p>4250</p> Signup and view all the answers

    considering the topography of the site where can be the natural location to which the storm drains pipes are directed

    <p>eastwest</p> Signup and view all the answers

    how many exact cubic meters of 25tons capacity truck will be used front yard has a need for a backfill

    <p>17.86</p> Signup and view all the answers

    what is not a secondary color

    <p>yellow</p> Signup and view all the answers

    ewrawe

    <p>werw</p> Signup and view all the answers

    what is not a tertiary color

    <p>blue red</p> Signup and view all the answers