project 3 - 2storey administration extension building

StunningSugilite avatar
StunningSugilite
·
·
Download

Start Quiz

Study Flashcards

Questions and Answers

as designed and applied to this project, the yards abutting the RROW are for ______

landscape

the measurement of lot occupancy taken from ground level includes the ______

yards

what is the maximum width, in meters, of the driveway if its for one way

5

what is the defined approximate total impervious area (ISA) of this project in square meter including the docking/delivery platform

<p>319</p> Signup and view all the answers

what is the defined approximate unpaved surface area (USA) of this project in square meters

<p>478</p> Signup and view all the answers

what will be the least total area of the windows at the engineering department office in square meters

<p>10% of total area</p> Signup and view all the answers

what is the least width in meters. of the t&b shower

<p>0.90</p> Signup and view all the answers

the most suitable and practical door for the workshop are _________

<p>double-swing</p> Signup and view all the answers

what is the minimum width, in meters, of the sidewalk in each side of the RROW

<p>1.20</p> Signup and view all the answers

the most appropriate floor tiles to use for the open decks are _______________

<p>non skid</p> Signup and view all the answers

the most appropriate floor finish for the storage is ________

<p>ceramic tiles</p> Signup and view all the answers

the most appropriate floor finish for the workshop is

<p>rubberized paint</p> Signup and view all the answers

the most appropriate floor finish for the business center is/are ___________________

<p>ceramic tiles</p> Signup and view all the answers

the most appropriate floor finish for the office is _________________

<p>vinyl</p> Signup and view all the answers

find the vertical drop of the toilet of the gicen slope in meters at 5 meters from the sidewalk/property line

<p>-0.10</p> Signup and view all the answers

a detailed analysis of the site involving the identification of site development potentials through proper planning is called __________________

<p>site utilization and land use studies</p> Signup and view all the answers

area allotted for the industrial area of the project in sqm considering the heavy equipment

<p>4250</p> Signup and view all the answers

considering the topography of the site where can be the natural location to which the storm drains pipes are directed

<p>eastwest</p> Signup and view all the answers

how many exact cubic meters of 25tons capacity truck will be used front yard has a need for a backfill

<p>17.86</p> Signup and view all the answers

what is not a secondary color

<p>yellow</p> Signup and view all the answers

ewrawe

<p>werw</p> Signup and view all the answers

what is not a tertiary color

<p>blue red</p> Signup and view all the answers