When evaluating the direct objectives of a project, which metric is LEAST likely to be considered by managers according to recent research?

  • The potential for opening new opportunities in the future
  • Adherence to the iron triangle constraints (correct)
  • Effect on the end customer
  • The project's impact on the budget

When adhering to the objectives now suggest managers should use three measures, which of the following is one of those measures?

  • Project investment success (correct)
  • The iron triangle
  • Project time success
  • Project ownership success

Which of the following is NOT considered a characteristic of project management trends?

  • Consistent and routine achievement of established goals
  • Emphasis on achieving strategic organizational goals
  • Increasing number of virtual projects
  • Decreasing role of project managers (correct)

What type of project is characterized by global teams working across different physical locations and time zones?

<p>A virtual project (B)</p> Signup and view all the answers

Which factor is LEAST likely to be a driving force behind the emergence of project management in contemporary society?

<p>Accessibility to vast amounts of information via the Internet (B)</p> Signup and view all the answers

Which phases of a project typically require the MOST overall effort?

<p>Planning, scheduling, monitoring, and control (B)</p> Signup and view all the answers

The 'stretched-S' project lifecycle pattern is mainly attributed to what factor?

<p>Changing resource allocation throughout the project (D)</p> Signup and view all the answers

Earned value analysis relies on the principle that project completion percentage is closely related to:

<p>The project's cost or resource utilization (D)</p> Signup and view all the answers

During which stage of team development do team members typically begin establishing norms and cohesiveness, reconciling behaviors, and developing trust?

<p>Norming (D)</p> Signup and view all the answers

In the Tuckman ladder model, what characterizes the 'Storming' phase of project development?

<p>The team is working independently leading to conflict. (C)</p> Signup and view all the answers

Which of the following methods is most commonly used to acquire workers for a project?

<p>Borrowing resources from existing in-house functional departments (C)</p> Signup and view all the answers

Which attribute is LEAST likely to be specifically recommended for consideration when selecting new members for a project team?

<p>Having low self-esteem to ensure compliance (D)</p> Signup and view all the answers

Which trait is generally considered not important for contributing effectively within a project team?

<p>Having a strong sense of self (D)</p> Signup and view all the answers

What is the meaning of 'scope creep' in the context of project management?

<p>A incremental and uncontrolled expansion of the project's requirements (D)</p> Signup and view all the answers

Which situation generally represents one of the most significant crises a project manager can face?

<p>An alteration in the project's scope (A)</p> Signup and view all the answers

Which of the following phases is NOT a part of the Tuckman ladder model of team development?

<p>Mourning (D)</p> Signup and view all the answers

In an Agile framework, who is primarily responsible for directly engaging with customers to thoroughly understand their needs and translate them into actionable requirements?

<p>Product Owner, who defines the product vision and manages the product backlog. (C)</p> Signup and view all the answers

Within an Agile development team, which role is responsible for updating the sprint backlog at the end of each day to reflect completed work and estimate remaining hours for in-process tasks?

<p>Developers, who are actively involved in task execution and progress tracking. (C)</p> Signup and view all the answers

Which role within an Agile team possesses deep expertise in the Scrum framework, Agile methodologies, and various agile techniques, guiding the team in adopting best practices?

<p>Scrum Master, who serves as a facilitator and removes impediments. (A)</p> Signup and view all the answers

What is the most significant technical challenge a project manager faces when trying to balance project constraints without compromising performance?

<p>Meeting schedule and cost goals. (A)</p> Signup and view all the answers

At which stage of the project life cycle do project priorities typically have the most significant impact and require the most careful consideration?

<p>Earlier (C)</p> Signup and view all the answers

Which behavior in a project manager is most likely to correlate with unsuccessful project management outcomes, hindering the team's ability to overcome obstacles and make timely decisions?

<p>Conflict avoidance (A)</p> Signup and view all the answers

According to Dewhurst, what term accurately describes a group of individuals who work independently, without a shared purpose or integrated approach?

<p>Name-only team (A)</p> Signup and view all the answers

What term is used to describe the practice of delegating tasks or portions of a project to smaller, independent contractors who specialize in specific areas?

<p>Subcontracting (D)</p> Signup and view all the answers

Which statement does not reflect a major disadvantage of using the matrix approach?

<p>The project manager takes responsibility for managing the project. (D)</p> Signup and view all the answers

Which organizational structure should be chosen when a project requires inputs from several functional areas but does not need full-time specialists?

<p>Matrix (B)</p> Signup and view all the answers

In which organizational structure does the project manager have the highest authority?

<p>Projectized (A)</p> Signup and view all the answers

Which organizational structure provides the highest resource availability?

<p>Projectized (A)</p> Signup and view all the answers

In which structure is the project manager likely to be part-time?

<p>Functional (D)</p> Signup and view all the answers

Where is the project administrative staff typically full-time?

<p>Projectized (B)</p> Signup and view all the answers

What type of project is characterized by crossing time, space, organizational, and cultural boundaries?

<p>Virtual (D)</p> Signup and view all the answers

How many team members should approximately be 'boundary spanners' in a virtual team?

<p>6-7 (A)</p> Signup and view all the answers

Which approach prioritizes the customer as the top priority followed by the team and then scope?

<p>Agile project management (A)</p> Signup and view all the answers

Which approach prioritizes schedule as the top priority followed by scope and then team?

<p>Traditional waterfall approach (C)</p> Signup and view all the answers

Which approach includes measures of success such as value, quality, and constraints?

<p>Agile project management (B)</p> Signup and view all the answers

Which approach commonly measures success through cost, schedule, and scope?

<p>Traditional waterfall approach (D)</p> Signup and view all the answers

What is the process of coordinating the work and timing of different groups in multidisciplinary teams called?

<p>Integration management (C)</p> Signup and view all the answers

Which option describes a plan for allocating resources?

<p>A budget (B)</p> Signup and view all the answers

If a project budget is over funded, what is a likely outcome?

<p>Produce waste and encourage slack management (C)</p> Signup and view all the answers

What effect does underfunding a project budget often have on stakeholders?

<p>Frustrate committed stakeholders (D)</p> Signup and view all the answers

Which element of principled negotiation emphasizes the importance of using fair standards to determine the quality of an outcome?

<p>Insisting on using objective criteria. (D)</p> Signup and view all the answers

How does understanding the other party's interests contribute to successful negotiation?

<p>It allows for the suggestion of solutions that meet their needs without necessarily agreeing with their stated position. (D)</p> Signup and view all the answers

In project management, which aspect is LEAST likely to be the primary source of conflict, according to the authors?

<p>Whether the task will be completed. (D)</p> Signup and view all the answers

To prevent conflicts from becoming personal, what is recommended?

<p>Clearly articulate the substantive issue. (B)</p> Signup and view all the answers

Which of the following is NOT a core component of principled negotiation?

<p>Generating solutions for mutual benefit before seeking agreement. (C)</p> Signup and view all the answers

Which is not one of the reasons for project-oriented organizations’ rapid growth?

<p>Low prices and low incremental costs have become absolute requirements for successful competition. (A)</p> Signup and view all the answers

During a negotiation, both parties are pushing for opposing solutions but seem unwilling to budge. How can the negotiator best overcome this deadlock, according to the principles discussed?

<p>By exploring the underlying needs and motivations of both parties to discover common objectives. (D)</p> Signup and view all the answers

In what instance is it suitable to mention a conflict to the opposing party?

<p>When you are ready to define the substantive problem. (C)</p> Signup and view all the answers

Flashcards

The Iron Triangle

A model in project management focusing on the balancing of scope, time, and cost.

Not a project success measure

Project time success is not a recognized measure of project success.

Owner of PMBOK Guidebook

The Project Management Institute (PMI) publishes the PMBOK Guidebook.

Trend Not in Project Management

Decreasing importance of project managers is not a trend in project management.

Signup and view all the flashcards

Virtual Project

A project involving global teams in different locations and time zones.

Signup and view all the flashcards

Forces Not Paramount in Management

Access to information via the internet is not a primary force in project management evolution.

Signup and view all the flashcards

Stretched-S Pattern Cause

The stretched-S pattern is mainly due to changing resource levels during the project lifecycle.

Signup and view all the flashcards

Most Effort in Project Phase

The largest effort in a project occurs during planning, scheduling, monitoring, and control.

Signup and view all the flashcards

Forming Phase

The initial stage where team members learn their roles.

Signup and view all the flashcards

Norming Phase

The phase where team norms develop and trust builds.

Signup and view all the flashcards

Storming Phase

A phase where conflict arises as project work begins.

Signup and view all the flashcards

Scope Creep

An uncontrolled change in project requirements.

Signup and view all the flashcards

Key Crisis for Project Managers

Change in required project scope is a major concern.

Signup and view all the flashcards

Characteristics of Effective Team Members

Important traits include high technical skills and sensitivity.

Signup and view all the flashcards

Phases of Tuckman Ladder

The model includes forming, storming, and norming.

Signup and view all the flashcards

Hiring New Team Members

Focus should be on skills and orientation, not low self-esteem.

Signup and view all the flashcards

Separate the people from the problem

A principle stating that negotiators should focus on issues, not personal conflicts.

Signup and view all the flashcards

Focus on interests, not positions

Encourages negotiators to understand underlying needs instead of fixed stances.

Signup and view all the flashcards

Invent options for mutual gain

The principle of brainstorming solutions that benefit both parties before deciding.

Signup and view all the flashcards

Insist on using objective criteria

The practice of relying on standards that are fair rather than subjective opinions.

Signup and view all the flashcards

Substantive problem definition

Identifying the core issue to avoid escalating interpersonal conflict during negotiations.

Signup and view all the flashcards

Nature of project negotiation

Most project-related conflicts arise from different perceptions rather than task completion.

Signup and view all the flashcards

Four points of principled negotiation

Includes: separate people from the problem, focus on interests, invent options, and use objective criteria.

Signup and view all the flashcards

Growth of project-oriented organizations

Factors driving the rise in project-oriented firms centered around specialization and competitive pricing.

Signup and view all the flashcards

Matrix Approach Disadvantage

The project manager takes responsibility for managing the project is not considered a major disadvantage.

Signup and view all the flashcards

Best Structure for Integration

The matrix structure is ideal for projects needing integration from various functional areas without full-time specialists.

Signup and view all the flashcards

Highest Authority Structure

Projectized organizational structure gives the project manager the highest level of authority.

Signup and view all the flashcards

Resource Availability Structure

Projectized structure maximizes the availability of resources.

Signup and view all the flashcards

Ownership of Project Budget

In a projectized structure, the project manager has ownership over the project budget.

Signup and view all the flashcards

Part-time Project Manager Structure

Functional structure means the project manager works part-time.

Signup and view all the flashcards

Full-time Administrative Staff

In a projectized structure, the project administrative staff operates full-time.

Signup and view all the flashcards

Characteristic of Virtual Projects

Virtual projects can cross time, space, organizational, and cultural boundaries.

Signup and view all the flashcards

Agile project management

An approach prioritizing customer needs and team collaboration over strict schedules.

Signup and view all the flashcards

Traditional waterfall approach

A linear project management method prioritizing schedule, then scope and team.

Signup and view all the flashcards

Customer priority in project management

In Agile, the customer is prioritized above team and scope.

Signup and view all the flashcards

Schedule priority in project management

In Waterfall, the schedule is the top priority, followed by scope and team.

Signup and view all the flashcards

Measures of success: Agile

Success in Agile is based on value, quality, and constraints.

Signup and view all the flashcards

Measures of success: Waterfall

Success in Waterfall is measured by cost, schedule, and scope.

Signup and view all the flashcards

Integration management

The process of coordinating work among multidisciplinary teams in projects.

Signup and view all the flashcards

Consequences of project budget overfunding

Overfunding can lead to waste and encourage slack management.

Signup and view all the flashcards

Product Owner

The person who works with customers to understand their needs in Agile.

Signup and view all the flashcards

Responsibilities of Developers

Developers create new products or improve existing ones in Agile.

Signup and view all the flashcards

Daily Task Prioritization

Developers select the next task based on priorities after completing a task.

Signup and view all the flashcards

Scrum Master Expertise

The Scrum master has deep knowledge of the Scrum framework and Agile techniques.

Signup and view all the flashcards

Project Manager's Challenge

Meeting schedule and cost goals without compromising performance.

Signup and view all the flashcards

Project Life Cycle Focus

Project priorities are more critical in the earlier stages of the project lifecycle.

Signup and view all the flashcards

Name-only Team

A group of individuals working independently without collaboration.

Signup and view all the flashcards

Subcontracting

The practice of outsourcing tasks to smaller contractors or vendors.

Signup and view all the flashcards

Study Notes

Project Management Forces

  • Three forces combine to require teams for problem-solving: explosion in certified project managers, worldwide acceptance of the Project Management Institute (PMI), and interaction of supply and demand.
  • The evolution of worldwide competitive markets for goods and services is not one of the forces identified.
  • The overwhelming majority of projects are small.

Project Examples

  • A house is not an example of a project and would usually not be considered a project.
  • Assembly line manufacturing of automobiles is an example of not usual project.
  • Developing computer software and hosting a wedding reception are considered projects.

Project Management Objectives

  • Scope, cost, and time are the prime objectives of project management.
  • Quality, scope, schedule and customer satisfaction are not the prime objectives.
  • Customer satisfaction and budget are not the prime objectives.

Project Dimensions

  • Four dimensions of project success are: Project efficiency, business impact on the organization, opening new opportunities for the future and cost to the customer.
  • Number of people working on the project is not one of the four dimensions of project success.
  • Outcome of a project could change over time but is not a characteristic of all projects.
  • All projects have a finite duration.

Non-Project Examples

  • The delivery of mail and production of weekly employment reports are not considered projects.

Key Players in Project Management

  • The military has played a significant role in the development of project management techniques.
  • European navigators, trader community, and brokerage firms are not identified as key players in project development.

Shenhar's Dimensions of Success

  • Shenhar defines four dimensions of project success : the iron triangle, impact on the customer, opening new opportunities for the future and the impact on the budget.

Recent Research on Project Management

  • Recent research suggests three important measures for managing projects: the iron triangle, project ownership success, and project investment success.
  • Project time success is not one of the measures.

Project Management Organization

  • The Project Management Institute (PMI) is the organization responsible for maintaining and publishing the PMBOK Guidebook.

Project Types

  • A virtual project involves global teams working across different physical locations and time zones.

Project Characteristics

  • The "stretched-S" pattern during the project lifecycle is primarily due to changing levels of resources used in successive stages.

Project Effort

  • The majority of effort in a project occurs during the planning, scheduling, monitoring, and control phases.

Earned Value

  • Earned value is closely correlated with the cost or use of resources.

Agile Approaches

  • Agile approaches to projects are generally characterized by dividing the projects into iterations and relying on lean management principles for emphasis on simplicity.

Scrum Roles

  • Product owner, developers, and Scrum master are three specific team roles associated with scrum frameworks.
  • Scrum lord is not a specific scrum role.

Goal Setting Theory

  • Goal setting theory identifies three characteristics of effective goals: specificity, attainability and comprehensive reflection of stakeholder views.
  • Requiring "stretching" to meet stakeholder goals is not one of the identified characteristics.

Project Success Measures

  • Generic measures of any project's success include outputs meeting the iron triangle specifications, successful completion of business case objectives and successful investments.
  • Project was fully funded is not a generic measure for success.

Project Termination

  • Project termination may occur when a project exceeds its budget or falls behind schedule or when the project manager is terminated.
  • Termination also occurs when the boss feels the project has failed.

Project Selection Criteria

  • Criteria for project selection that focuses on how new products fit an existing product line is production line extension.

Project Selection Criteria

  • A project selection criteria that focuses on environmental and social issues is sustainability.

Project Evaluation

  • Payback period is a numeric model.
  • Sacred cow is not a numeric model.

Project Costing Model

  • A project with a $12,000 implementation cost and $3,000 annual cash flow has a four-year payback period.

Project Interest Rate

  • The minimum acceptable rate of return set by an organization for a project is called a hurdle rate.

Real Options Approach

  • The premise of the real options approach is that delaying an investment may lead to potentially greater returns.

Discounted Cash Flow Approach

  • The discounted cash flow approach is simple, understands available data, allows for adjustment of project risk, but may have inaccurate data.

Project Selection Models

  • A project profitability model, like a discounted cash flow, might not account for risk factors, time value of money, or non-monetary factors and is strongly biased toward short term solutions.
  • Project selection models should account for project realism.

Project Success Factors

  • Characteristics of highly successful strategic projects include exceptional value for stakeholders, a powerful vision, and qualified project managers unconditionally supported by top management.
  • Creating a satisfied project culture is not listed as a characteristic of highly successful strategic projects.

Project Team Development

  • The Tuckman ladder describes four stages of team development: Forming, Storming, Norming, and Performing.
  • The stages describe how teams go from initial independent work in the forming stage to working together as a cohesive unit for the project's completion in the performing stage.

Project Team Members

  • Teams might be comprised of temporary agencies or borrowed/transferred functional departments.

Project Management Characteristics

  • Effective project managers possess strong technical skills, handle political sensitivity, and have high self-esteem.

Project Scope Creep

  • Scope creep involves changes in the project's scope or requirements after project initiation and is a source of frequent projects crises.

Project Planning Approach

  • One planning approach for handling complex projects is to communicate effectively with stakeholders.
  • Project leadership includes gaining knowledge of the client to complete the task.

Core Project Management Duties

  • Project managers are heavily involved in communicating, overseeing, and motivating staff.

Project Manager Skills

  • Essential skills for project managers include negotiation, resolving conflicts, and taking care of budgetary and scheduling issues among varied organizational areas.

Project Management Roles

  • A critical project role is to maintain a broad network of communication.

Stakeholder Management

  • Identifying stakeholders, creating a stakeholder register that includes project stage interest, and effectively communicating with stakeholders is part of establishing a well-managed project.

Project Methodology

  • Expert judgement of project teams, user surveys, and corporate guidelines are common methods for identifying stakeholders.

Standard Project Management Procedures

  • Project managers need to develop a project plan, establish a cost baseline, communicate project results, and organize project teams by a clear plan and hierarchical structure.
  • Project teams need members from various disciplinary backgrounds, and communication among their members needs to be supported.

Project Lifecycle

  • Thamhain suggests project conflict intensity is highest in the early phases of the project concerning priorities or cost versus time. Toward the end of the project lifecycle, conflict increases with scheduling issues.

Project Budgeting and Costing

  • In budgeting, the project manager is expected to predict costs, forecast resources, and ensure accuracy.
  • A variety of project budgeting strategies are used.

Project Risk Management

  • Project managers need to know about all types of risks (preventable and unpreventable).

Project Planning Processes

  • Four steps in risk management planning involve determining risks and analyzing responses.

Project Management Tools

  • Techniques in quantitative risk analysis include decision tree analysis, Monte Carlo simulation.

Project Management Processes

  • Risk identification, response planning, monitoring, and control are critical steps in project risk management.

Project Outcomes

  • A Risk Management Register is used to keep track of risks.

Methods for Project Coordination

  • Project managers coordinate work and timing of diverse, interdisciplinary teams using methods such as integration management.

Project Budget

  • Project budgets are an integral part of project management, setting the limits on the resources used.

Project Management Estimators

  • Professional project cost estimators work closely with clients to maintain budget accuracy.

Project Scope

  • A project's scope describes the precise work to be completed.
  • Scope creep involves ongoing changes to project objectives.

Project Launch Meetings

  • Project launch meetings play a key role in aligning stakeholders and clarifying expectations.

Agile Project Management

  • Agile principles value customer satisfaction and feedback with continuous delivery of results.
  • Agile projects utilize efficient methods of communication and short-term iterations.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Project Management Domains Quiz
6 questions
Team Development and Management
10 questions
Project Team Development Stages
10 questions

Project Team Development Stages

OrganizedEmpowerment1022 avatar
OrganizedEmpowerment1022
Project Management Processes Quiz
10 questions
Use Quizgecko on...
Browser
Browser