Project AZORIAN Secrets Quiz

BraveLemur avatar
BraveLemur
·
·
Download

Start Quiz

Study Flashcards

12 Questions

What was the main objective of Project AZORIAN?

Retrieve a sunken Soviet submarine from the Pacific Ocean floor

Where was the Soviet submarine K-129 located after it sank?

1,800 miles northwest of Hawaii

What was the cargo of the Soviet submarine K-129 that made it a valuable target for recovery?

Three SS-N-4 nuclear-armed ballistic missiles

Which agency led the recovery effort of the sunken Soviet submarine in Project AZORIAN?

CIA

How deep was the portion of the wrecked submarine located in Project AZORIAN?

More than three miles below the ocean surface

What was a significant challenge faced by CIA engineers in Project AZORIAN?

Lifting a huge 1,750-ton portion of the submarine from over three miles below

What was the main purpose of the Hughes Glomar Explorer ship?

To recover a sunken submarine

How did the Glomar Explorer maintain secrecy during the recovery operation?

By conducting operations underwater away from other vessels

Why was the capture vehicle built under a roof and loaded onto the ship from a submerged barge?

To keep the design of the capture vehicle secret

What caused the recovered submarine section to break apart during the lift operation?

Structural weaknesses in the submarine section

How did the Glomar crew handle the setback of the recovered section breaking apart?

They successfully hauled up the remaining portion in the capture vehicle

What was significant about the Glomar Explorer's derrick during the recovery operation?

It resembled an oil-drilling rig

Test your knowledge about the highly secret six-year effort by the CIA known as Project AZORIAN, which involved retrieving a sunken Soviet submarine from the Pacific Ocean floor during the Cold War. Explore the challenges faced and the daring mission details in this quiz.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Project Management Quiz
6 questions
Project 4 - 5A - Climate Change
6 questions
Project Management Responsibilities
10 questions
Use Quizgecko on...
Browser
Browser