Podcast
Questions and Answers
What is the correct procedure if a property is VACANT and lists 'Shellpoint' as the Lender name?
What is the correct procedure if a property is VACANT and lists 'Shellpoint' as the Lender name?
What is required per Proctor regarding ALL VACANT property inspections?
What is required per Proctor regarding ALL VACANT property inspections?
What must be done within 48 hours of inspecting a claim exceeding $50,000?
What must be done within 48 hours of inspecting a claim exceeding $50,000?
To whom should calls regarding claim files be directed?
To whom should calls regarding claim files be directed?
Signup and view all the answers
What is the maximum depreciation percentage to be set on materials in Xactimate?
What is the maximum depreciation percentage to be set on materials in Xactimate?
Signup and view all the answers
What action should be taken if the amount of loss exceeds the policy limits?
What action should be taken if the amount of loss exceeds the policy limits?
Signup and view all the answers
Study Notes
Carrier Information
- Carrier Name: Proctor Loan Protector
- Last updated: July 15, 2024
- Contact: RYZE TPA Reviewer
- Phone: 972-934-4400
- Email: [email protected]
- Estimating System: Xactimate (not using Xactanalysis)
- Team Lead: Lori Carter
New Standards and Expectations
- Full property inspections, including roofs, mandatory for all claims, regardless of loss notice details.
- Direct contact with Proctor Loan Protector regarding claims is prohibited; all inquiries must go through the RYZE TPA Reviewer.
- For vacant properties with "Shellpoint" as the lender, do not reach out for inspection reports; access is available through the office.
- It is the responsibility of the adjuster to ensure the availability and review of inspection reports for vacant properties.
- All uploaded documents in the reports section of radius must be reviewed.
Reporting Requirements
- Scheduled inspections must be noted in the claims system within three days of assignment.
- First status with reserves expected within five days of assignment.
- Final report due within ten days of assignment.
- For claims exceeding policy limits, consult the RYZE TPA Reviewer for potential additional coverage.
Inspection Procedures
- Initial contact required within 24 hours of claim assignment.
- Complete inspection, including roofs and any APS outbuildings, must be conducted.
- Coverage on residential APS properties is 10% of the insured value, confirmation on multi-building properties required.
Estimating Guidelines
- Use Xactimate with depreciation capped at 75% on materials based on age and condition.
- Remove labor minimums; adjust estimates as necessary and print using Final Draft.
Documentation Submission
- Ensure all requested documents, including the completed ESX file and Proctor Narrative, are uploaded to radius.
- Upload applicable weather reports and any additional supporting documentation.
- Include completed Other Insurance Forms and Interior Affidavits when applicable.
Third Party Vendor Guidelines
- Roof assists up to $500 are preapproved for steep roofs; invoices must be uploaded for payment.
- Direct inspections require written approval documented in the file.
- Leak detections for unknown plumbing leaks must be coordinated through the RYZE File Reviewer.
- HVAC inspections may be requested by Proctor via RYZE if not previously done by the borrower.
- Electrical damages require StrikeCheck assessments if repairs have not been made.
Engineer Request Process
- Detailed status with the #31 Proctor Engineer Request Form required if an engineer is deemed necessary.
- Examples warranting an engineer include questionable damage timelines or uncertain damage sources.
- The RYZE TPA reviewer will handle submission for engineer assignment and follow up on the status.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.