Procedure A0481: Pulse Check
14 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the confidential product type of FTW Hangtag?

YES

What is the factory country for the Factory name JIALE?

  • China
  • Indonesia (correct)
  • Germany
  • Japan
  • What sizes (UK) are indicated for the Model Name SUPERSTAR SLIP ON W?

    8

    Proper Fit & Quality check is not a part of the responsibilities of T1.

    <p>False</p> Signup and view all the answers

    Who is the author of this document?

    <p>Director Quality Programs – Gunadi, Eliza Senior Manager Quality Programs – Nguyen, Garry</p> Signup and view all the answers

    What is the purpose of the document?

    <p>To outline mandatory testing guidelines for first production output</p> Signup and view all the answers

    The document specifies that any deviation from the defined procedures could lead to potential quality risks.

    <p>True</p> Signup and view all the answers

    What does SDSO stand for according to the document?

    <p>Senior Director Sourcing Operations</p> Signup and view all the answers

    Match the following abbreviations with their corresponding definitions:

    <p>LO = Liaison Office HQ = Headquarter PDX = Portland ACT = Advanced Creation Testing department</p> Signup and view all the answers

    What is the format for APP's unique sample number? Provide an example.

    <p>A-YYMM000X (e.g., A-23090001)</p> Signup and view all the answers

    What action should testers take if a product does not display any problem or defect during the Pulse Check?

    <p>PASS</p> Signup and view all the answers

    What should be done if a product shows a minor issue that needs adjustment during the Pulse Check?

    <p>PASS with comment</p> Signup and view all the answers

    What status should be assigned if defects are found in the product during the Pulse Check?

    <p>FAILED</p> Signup and view all the answers

    What action should be taken in case of a 'FAILED' status during the Pulse Check?

    <p>Immediate improvement in production</p> Signup and view all the answers

    Study Notes

    Procedure for 1st Production Pulse Check

    Purpose

    • Outlines mandatory testing guidelines for first production output of critical products
    • Includes customer's point of view to justify fit and performance of products

    Scope

    • Mandatory for Footwear and Apparel models or articles identified as critical products
    • Adherence to procedure is important to avoid potential quality risks and consumer experience performance

    Definitions

    • LO: Liaison Office
    • HQ: Headquarter
    • PDX: Portland
    • SDQ/DQ: Senior Director Quality/Director Quality
    • SDSO/DSO: Senior Director/Director Sourcing Operations
    • SVP/VP: Senior Vice President/Vice President
    • MCS: Manufacturing Confirmation Sample
    • SS: Sealing Sample
    • FTW: Footwear product types
    • APP: Apparel product types
    • T1: Tier 1 Supplier delivers ready-made, finished products
    • PO: Purchase Order
    • ACT: Advanced Creation Testing department
    • BU: Business Units
    • QATM: Quality Assurance Test Matrix
    • SCPR: Sourcing Critical Product Review
    • TN: Footwear Product Type - Totally New
    • NS: Footwear Product Type - New Silhouette

    Product Selection

    • FTW: All products listed as TN, NS, Sourcing/Brand priority, and/or identified as quality risks during development stage require product review and Pulse Check
    • APP: All products listed on SCPR list (SCPR Full only) require product review and Pulse Check

    Product Review

    • Conducted by T1 to ensure quality of products
    • Review includes safety, compliance, fit & comfort, function, durability, color, appearance overview, and T1 internal fit & wear at OCPT

    Pulse Check

    • Testers provide consumer overview feedback
    • Testers are assigned as representatives of consumers to review products from consumer's point of view
    • Testers include Sourcing LO, SVP, and VP Sourcing
    • Pulse Check includes fit and performance testing, and testing for specific product types (e.g. wear testing and washing cycles for Apparel)

    Process Flow

    • STEP 1: Send First Production PO list to Quality Product Integrity
    • STEP 2: Trigger auto-tagging in Pivot88 and upload product pictures
    • STEP 3: Select First Production Model/Article
    • STEP 4: Receive request and take First Production Sample from the 1st PO of requested products
    • STEP 5: Receive the request and take First Production Sample from the 1st PO of requested products
    • STEP 6: Prepare shipment to addresses outlined in Appendix 3
    • STEP 7: Share DHL# and Estimated Time of Arrival (ETA)
    • STEP 8: Receive the First Production Sample and perform Pulse Check
    • STEP 9: Provide feedback and test results
    • STEP 10: Test results and respective actions taken

    Other Important Information

    • Confidential products are marked as "CONFIDENTIAL" on the hangtag and orders are only accessible for SVP/VP level
    • Photos are not allowed to be taken or shared on social media for confidential products### First Production Pulse Check Procedure
    • The procedure is effective from December 7th, 2023, and will be effective until December 7th, 2026.
    • If a defect is found on the products, an escalation notification will be immediately triggered to DSO/DQ/T1.
    • Products should be immediately improved in production, and a decision made about the orders with already-produced products (e.g., inspect and repair or downgrade to B/C-grades).

    Roles and Responsibilities

    • SQD/DQ should be put in Cc on every First Production Sample comment report in Smartsheet with a "FAILED" status.
    • T1 has the option to request the return of "FAILED" samples from testers when necessary.
    • SDSO/DSO with involvement of LO Quality team will make the decision about the orders with already-produced products.
    • LO team members responsible for Pulse Check include:
      • Queenie Zhu - LO North Asia
      • Fransergio Serafim - LO Indonesia & India
      • Sanjay Sinha - LO South Asia
      • Anice Leite - LO EMEA
      • Gabriela Wong - LO Americas
      • Jan Best - for all LO

    Pulse Check Process

    • Testers will provide relevant pictures corresponding to the feedback through Smartsheet.
    • T1 will produce new samples with respective improvements and resend to testers within ten (10) days from the date of sample's rejection.
    • The process will restart from Step 6 and continue until products pass the test and enter mass production.

    Sample Number and Barcode

    • The sample number is required to precisely input in accordance with the format (e.g., A-YYMM000X for APP and F-YYMM000X for FTW).
    • The barcode will be attached to each of the First Production products as a hangtag.
    • Testers will scan the barcode to enter the feedback.

    Test Result and Reporting

    • The Pulse Check results are tracked and monitored through Smartsheet.
    • T1 will ensure proper fit and quality check, according to the defined control standards.
    • T1 will take appropriate actions in response to the identified issues and ensure proper storage of samples, including testing reports, over a six-month period.

    Follow-up Actions in Case of Failure

    • If a First Production Sample is on "FAILED" status, T1 will receive an auto-notification email from Smartsheet and log follow-up actions into Smartsheet.
    • T1 will access Smartsheet Test Result pages, enter the "T1 Action Plan", and click "YES" to submit the Action Plan to adidas Testers.
    • A revised version of the product has to be retested until the necessary changes result in a "PASS" status.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz is based on the procedure document A0481, covering the 1st production pulse check, including approval and effective dates.

    More Like This

    Production Process and Quality Control Quiz
    3 questions
    Chocolate Production Process
    5 questions

    Chocolate Production Process

    SereneEnlightenment8454 avatar
    SereneEnlightenment8454
    171 - GMP, GSP and GDP
    48 questions

    171 - GMP, GSP and GDP

    ExaltingRhinoceros avatar
    ExaltingRhinoceros
    Use Quizgecko on...
    Browser
    Browser