What is the maximum amount that can be paid for claims settled out of court, according to the content provided?

  • There's no fixed limit
  • Rs. 25,000 (correct)
  • Rs. 10,000
  • Rs. 100,000

What type of claims are specifically excluded from the 'claims settled out of court' category mentioned in item vi(a)?

  • Claims relating to Railway accidents (correct)
  • Claims for injury to person or damage to property
  • Claims for compensation for lost or damaged goods (correct)
  • Claims involving military duty.

In which scenario does the Railway Board need to be informed about the details of a claim?

  • Claims settled out of court for less than Rs. 25,000
  • Claims decreed by a court of law for more than Rs. 25,000 (correct)
  • All claims exceeding Rs. 10,000
  • Claims settled by arbitration award

What is the maximum amount that can be paid for a claim settled out of court, if it involves military duty?

<p>There's not enough information in the text to answer this question. (A)</p> Signup and view all the answers

Which of the following claims is not subject to the power of the higher authority?

<p>Claims settled by arbitration award (B)</p> Signup and view all the answers

What is the maximum amount that can be paid for a claim decreed by a court of law?

<p>Unlimited (C)</p> Signup and view all the answers

Which of the following conditions applies to claims settled by arbitration award?

<p>The Railway Board needs to be informed about the details of the claim. (B), The claim must involve a dispute arising out of a contract. (D)</p> Signup and view all the answers

If the higher authority needs to pay more than Rs. 25,000 for a claim decreed by a court of law, what action is required?

<p>The details of the case must be reported to the Railway Board. (C)</p> Signup and view all the answers

According to the content, what is the purpose of informing the Railway Board about claims exceeding Rs. 25,000?

<p>To enable the Railway Board to review the claim. (C)</p> Signup and view all the answers

What is the main focus of this content?

<p>To delegate the authority to deal with claims to various levels of authority. (B)</p> Signup and view all the answers

What is the maximum amount for which a General Manager can sanction a refund without prior approval?

<p>Rs. 20,000 (D)</p> Signup and view all the answers

Who should the General Managers consult before delegating their powers?

<p>The Financial Adviser and Chief Accounts Officer (A)</p> Signup and view all the answers

Which of the following describes the conditions under which the General Managers can delegate powers?

<p>Only after consulting with Financial Adviser and Chief Accounts Officer (B)</p> Signup and view all the answers

In the presence of a disagreement between the General Manager and the Financial Adviser, what should occur next?

<p>Refer the matter to the Railway Board (D)</p> Signup and view all the answers

What must be observed when exercising the powers delegated by General Managers?

<p>Only the existing Code Provisions and Railway Board restrictions (C)</p> Signup and view all the answers

Which document outlines the powers of General Managers in financial matters?

<p>Indian Railway Financial Code Volume I (A)</p> Signup and view all the answers

Which letter revised the powers of General Managers regarding financial matters?

<p>Board's letter No.F(X)II/86/PW/6 dated 5-5-1987 (D)</p> Signup and view all the answers

How can General Managers ensure their expenditure decisions are compliant with financial regulations?

<p>By adhering to established rules and regulations (C)</p> Signup and view all the answers

What is necessary for the General Managers to handle expenditures that exceed certain limits?

<p>Previous sanction of the higher authority (D)</p> Signup and view all the answers

What is one of the key powers of General Managers regarding expenditure?

<p>To delegate and re-delegate powers to subordinate authorities (C)</p> Signup and view all the answers

Under what condition can payment to a contractor exceed Rs. 50,000 as a result of an arbitrator's award?

<p>If it exceeds the amount due recognized before arbitration. (B)</p> Signup and view all the answers

What is the maximum value of irrecoverable losses that a Railway employee can be responsible for before needing authorization from the Railway Board?

<p>Rs. 1 lakh (B)</p> Signup and view all the answers

Which losses can be written off by the General Manager without reporting to the Railway Board?

<p>Inefficient balances under Suspense Heads not exceeding Rs. 1 lakh. (A)</p> Signup and view all the answers

What is the threshold for writing off irrecoverable losses when no Railway employee is responsible?

<p>Rs. 2 lakhs (D)</p> Signup and view all the answers

Which authority level is allowed to re-delegate powers under the specified items?

<p>HODs (C)</p> Signup and view all the answers

Important cases of loss must be reported to the Railway Board when the loss involved exceeds what amount?

<p>Rs. 50,000 (D)</p> Signup and view all the answers

Which provision allows the General Manager to write off losses?

<p>For irrecoverable losses where cash, stores, tools, and plant are involved. (B)</p> Signup and view all the answers

What is the role of the General Managers regarding quoting station to station rates?

<p>They have outlined powers per the code. (B)</p> Signup and view all the answers

Which of the following is NOT a condition for writing off losses due to responsible Railway employees?

<p>Loss exceeds Rs. 50,000. (A)</p> Signup and view all the answers

For losses not exceeding what amount is there no need to report unless unusual features are present?

<p>Rs. 50,000 (B)</p> Signup and view all the answers

In which scenario does the General Manager have full power to authorize the payment to surveyors engaged for the assessment of the value of damaged consignments?

<p>There is no specific amount limitation for the General Manager to authorize such payments. (D)</p> Signup and view all the answers

Which of the following is NOT a condition that requires the General Manager to seek higher authority approval for a payment?

<p>Payment of contribution to a professional institution exceeding Rs. 2,500 per annum. (D)</p> Signup and view all the answers

Which of the following expenses requires the approval of the Railway Board?

<p>Payments for arbitration fees exceeding Rs. 5,000. (A)</p> Signup and view all the answers

Which category of claims are subject to the power of the General Manager, provided they do not exceed the stipulated amounts?

<p>Claims settled out of court. (D)</p> Signup and view all the answers

What is the maximum amount that can be paid by the General Manager for a claim settled out of court involving a military personnel without requiring approval from the Railway Board?

<p>There is no maximum amount; the General Manager has full authority over the claim. (B)</p> Signup and view all the answers

What is the maximum amount the General Manager can pay for a claim settled out of court, if it involves an ordinary passenger, without requiring approval from the Railway Board?

<p>The maximum amount is subject to the rules framed by the Central Government under Section 129 of the Railway Act, 1989. (B)</p> Signup and view all the answers

For which type of claims does the Railway Board need to be informed about the circumstances leading to their settlement?

<p>Claims settled via arbitration. (A)</p> Signup and view all the answers

Which of the following actions requires the General Manager to seek approval from higher authority?

<p>Paying a Railway Counsel a fee exceeding the scale prescribed by the Ministry of Law and Justice. (D)</p> Signup and view all the answers

What is the maximum amount the General Manager can pay to a private individual for arbitration fees before requiring approval from the Railway Board?

<p>Rs. 5,000. (A)</p> Signup and view all the answers

What is the maximum amount the General Manager can pay for a contribution to a medical institution providing medical aid to Railway employees, without requiring approval from higher authorities?

<p>Rs. 1,000. (A)</p> Signup and view all the answers

What is the maximum amount that can be paid for arbitration fees to private individuals without requiring higher authority approval?

<p>Rs. 5,000 (B)</p> Signup and view all the answers

Which circumstances exempt certain charges from the higher authority's sanctioning power?

<p>Items pertaining to wharfage and demurrage (B)</p> Signup and view all the answers

What is the daily fee limit for engaging counsel in the Supreme Court without requiring higher authority approval?

<p>Rs. 1,050 (B)</p> Signup and view all the answers

What is the threshold amount for contributions to a professional institution without requiring higher authority approval?

<p>Rs. 2,500 (C)</p> Signup and view all the answers

What is the maximum compensation amount for ordinary passengers involved in railway accidents according to established rules?

<p>As specified by the Central Government (B)</p> Signup and view all the answers

In which scenario can a Railway employee's irrecoverable loss be written off without higher authority approval?

<p>When no Railway employee is responsible (B)</p> Signup and view all the answers

Which of the following actions requires the General Manager to seek higher authority approval?

<p>Payments exceeding set fee scales for counsel (B)</p> Signup and view all the answers

What is the maximum amount that can be paid for a claim settled out of court involving ordinary passengers without requiring approval from the Railway Board?

<p>Rs. 25,000 (D)</p> Signup and view all the answers

What is the prescribed daily rate limit for engaging counsel in other High Courts without requiring higher authority approval?

<p>Rs. 1,050 (D)</p> Signup and view all the answers

What is the threshold amount for claims settled out of court related to railway accidents?

<p>Rs. 25,000 (B)</p> Signup and view all the answers

Which scenario requires that the details of a claim be reported to the Railway Board?

<p>Claims decreed by a court of law exceeding Rs. 25,000 (A)</p> Signup and view all the answers

For which of the following types of claims does the Law Officer need to provide advice before settlement?

<p>Claims settled out of court (B)</p> Signup and view all the answers

What is the maximum compensation amount that may be authorized for claims due to negligence or carelessness on the part of the Railway?

<p>Rs. 10,000 (C)</p> Signup and view all the answers

What must the General Manager do if handling a claim that exceeds Rs. 50,000 related to an arbitration award?

<p>Seek prior approval from the Railway Board (A)</p> Signup and view all the answers

What is required for the General Manager to authorize expenditure beyond the established limit for refunds?

<p>Previous sanction from higher authority (B)</p> Signup and view all the answers

Which of the following is NOT a responsibility of the General Managers regarding claims?

<p>To write off losses without justification (A)</p> Signup and view all the answers

If a claim involves military duty, what is the maximum amount that can be authorized without going through higher authority?

<p>Rs. 10,000 (D)</p> Signup and view all the answers

Under what condition is a contractor's payment allowed to exceed Rs. 50,000 due to an arbitrator's award?

<p>When the payment exceeds the amount initially considered due by more than Rs. 50,000. (A)</p> Signup and view all the answers

Which circumstance necessitates that the General Manager refer a matter to the Railway Board?

<p>Disagreements with the Financial Adviser and Chief Accounts Officer (A)</p> Signup and view all the answers

Under what condition may the General Manager not sanction expenditure without prior approval?

<p>For refunds exceeding Rs. 20,000 in specific cases (B)</p> Signup and view all the answers

What must be considered when General Managers exercise their delegated powers?

<p>Adherence to specified limits and reporting requirements (D)</p> Signup and view all the answers

What maximum value of irrecoverable losses can be written off by the General Manager without the Railway Board's notification, when a Railway employee is responsible for the loss?

<p>Rs. 1 lakh (C)</p> Signup and view all the answers

For which type of loss does the General Manager not require notification to the Railway Board unless it shows unusual features?

<p>Losses not exceeding Rs. 50,000 (D)</p> Signup and view all the answers

Which type of claims can be settled with full powers by the authority without the involvement of the Railway Board?

<p>Claims settled out of court within Rs. 10,000 (A)</p> Signup and view all the answers

What limitation is placed on the powers of the General Managers regarding negotiations and contracts?

<p>They need to follow existing codal provisions and restrictions from the Railway Board (C)</p> Signup and view all the answers

What is the minimum value of irrecoverable losses that can be written off by the General Manager if no employee is responsible for the loss?

<p>Rs. 2 lakhs (C)</p> Signup and view all the answers

What is the required action if a General Manager needs to authorize a payment due to damages caused by negligence above a certain threshold?

<p>Report any amount exceeding Rs. 25,000 to the Railway Board (B)</p> Signup and view all the answers

What requirement exists for the General Managers when delegating powers to subordinates?

<p>Consultation with the Financial Adviser and Chief Accounts Officer (D)</p> Signup and view all the answers

Which statement is true regarding the powers under item (vii) concerning irrecoverable losses?

<p>The powers require strict compliance and cannot be delegated further. (B)</p> Signup and view all the answers

What must the General Manager ensure when exercising delegated powers?

<p>Conform to the provisions and regulations laid out by the Railway Board (A)</p> Signup and view all the answers

Which aspect of financial management cannot be bypassed by the General Managers?

<p>Making decisions contrary to Railway Board regulations (D)</p> Signup and view all the answers

For which scenario must the General Manager consult the Railway Board for higher authority approval?

<p>When the total loss is Rs. 2 lakhs regardless of responsibility. (A)</p> Signup and view all the answers

What powers are outlined for the General Managers concerning station-to-station rates?

<p>Their powers are detailed in a specific chapter of the code. (C)</p> Signup and view all the answers

What is the rationale for the Railway Board's involvement in the General Manager's decisions?

<p>To regulate and control all financial powers exercised (B)</p> Signup and view all the answers

What must the General Manager do if they encounter a difference in opinion with the Financial Adviser?

<p>Refer the matter to the Railway Board for orders (C)</p> Signup and view all the answers

What does an important case of loss reported to the Railway Board typically involve?

<p>Losses that exceed Rs. 1 lakh. (C)</p> Signup and view all the answers

What is the correct limit for writing off inefficient balances under Suspense Heads without needing further approvals?

<p>Rs. 1 lakh (C)</p> Signup and view all the answers

Which of the following powers is explicitly permitted to the General Managers under the provisions outlined?

<p>Writing off certain losses without prior approval (A)</p> Signup and view all the answers

What is the maximum amount that can be refunded for fare and freight without prior approval from a higher authority?

<p>Rs. 20,000 (B)</p> Signup and view all the answers

Who must General Managers consult with before delegating their powers to subordinate authorities?

<p>The Financial Adviser and Chief Accounts Officer (D)</p> Signup and view all the answers

In the event of a disagreement between the General Manager and the Financial Adviser and Chief Accounts Officer, what should occur next?

<p>The matter is to be referred to the Railway Board for resolution (C)</p> Signup and view all the answers

What document outlines General Managers' powers in financial matters?

<p>Chapter V of Indian Railway Financial Code, Volume I (B)</p> Signup and view all the answers

What is the key power of General Managers concerning expenditure?

<p>Sanctioning expenditure and delegating their powers (D)</p> Signup and view all the answers

What is the primary purpose of the rules outlined in the document regarding the powers of General Managers in commercial matters?

<p>To ensure efficiency and accountability in financial management (C)</p> Signup and view all the answers

Which of the following is a key requirement for exercising the powers delegated by the General Managers to subordinate authorities?

<p>Observance of existing code provisions, rules, and regulations (D)</p> Signup and view all the answers

Who has the authority to revise the powers of General Managers in financial matters?

<p>The Railway Board (C)</p> Signup and view all the answers

What is the maximum amount that can be paid for a claim settled out of court, if it involves a military personnel, without requiring approval from the Railway Board?

<p>Rs. 25,000 (C)</p> Signup and view all the answers

What is the maximum amount of irrecoverable losses that can be written off by the General Manager without reporting to the Railway Board if a Railway employee is NOT responsible for the loss?

<p>Rs. 2 lakhs (A)</p> Signup and view all the answers

In which scenario does the General Manager need to report to the Railway Board about losses?

<p>When a responsible Railway employee loses Rs. 50,000 worth of tools. (A), When a Railway employee loses Rs. 2 lakhs worth of tools. (C)</p> Signup and view all the answers

What is the maximum amount that a General Manager can pay for a claim settled out of court involving a military personnel without requiring approval from the Railway Board?

<p>Rs. 25,000 (C)</p> Signup and view all the answers

What is the maximum value of irrecoverable losses that the General Manager can write off without reporting to the Railway Board when no Railway employee is responsible for the loss?

<p>Rs. 2 lakhs (B)</p> Signup and view all the answers

What is the maximum amount that the General manager can pay for a claim settled out of court involving an ordinary passenger, without requiring approval from the Railway Board?

<p>Rs. 25,000 (C)</p> Signup and view all the answers

What is the maximum amount the General Manager can authorize for a claim settled out of court, according to item vi(a)?

<p>Rs. 10,000 (A)</p> Signup and view all the answers

Which type of claim requires the General Manager to report details to the Railway Board for expenditure exceeding Rs. 25,000?

<p>Claims decreed by a Court of Law (A)</p> Signup and view all the answers

In what scenario does the General Manager have full power to authorize payment to surveyors engaged for assessing damaged consignments?

<p>When there is no dispute about the value of the consignment (C)</p> Signup and view all the answers

Which of the following requires the General Manager to seek higher authority approval?

<p>Contributions to a professional institution exceeding Rs. 50,000 (C)</p> Signup and view all the answers

In which case can the General Manager write off an irrecoverable loss without reporting to the Railway Board?

<p>When the loss is less than Rs. 10,000 and no Railway employee is responsible (C)</p> Signup and view all the answers

Which of the following requires the General Manager to seek approval from higher authority?

<p>Claims settled out of court involving military personnel for less than Rs. 25,000 (B)</p> Signup and view all the answers

When can the General Manager write off amounts due to the Railways without higher authority approval?

<p>When the amount is less than Rs. 10,000 and the loss is not due to a responsible Railway employee. (C)</p> Signup and view all the answers

What is the maximum amount the General Manager can pay for a claim settled out of court involving an ordinary passenger without requiring approval from the Railway Board?

<p>The amount is determined by the rules framed by the Central Government under Section 129 of the Railway Act, 1989. (D)</p> Signup and view all the answers

What are the circumstances under which wharfage, demurrage, storage, and lost property charges can be written off or refunded by the Railway Administration without the sanction of higher authority?

<p>When the amount involved is less than Rs. 10,000. (A)</p> Signup and view all the answers

What is the maximum amount that can be paid for a claim decreed by a court of law, without requiring higher authority approval?

<p>Rs. 25,000. (A)</p> Signup and view all the answers

Flashcards

Compensation for railway accidents

Monetary remuneration for injuries/damages caused by railway negligence.

Claims decreed by Court

Court-awarded payments for damages or injuries caused by railways.

Out of court settlements

Agreements reached without court intervention, often quicker.

Power to pay compensation

Authority granted to railway officials to pay claims directly.

Signup and view all the flashcards

Limit for compensation claims

Maximum amounts payable for different types of claims.

Signup and view all the flashcards

Railway Board reporting

Requirement to inform Railway Board for claims over a certain threshold.

Signup and view all the flashcards

Claims settled by arbitration

Disputes resolved outside court by third-party mediators.

Signup and view all the flashcards

Claims for loss or damage

Compensation requests for lost goods or damaged property.

Signup and view all the flashcards

Negligence or carelessness

Failure to act with the caution typical of responsible individuals, leading to accidents.

Signup and view all the flashcards

Public compensation limit

Maximum payout for injuries or damage to the public, typically Rs. 10,000.

Signup and view all the flashcards

General Manager Powers

The authority given to General Managers in commercial matters, including expenditure sanctioning.

Signup and view all the flashcards

Financial Code Appendix

Details the powers of General Managers in financial and commercial matters.

Signup and view all the flashcards

Liberalization of Powers

Revision of General Managers' powers made in 1987 to allow greater flexibility.

Signup and view all the flashcards

Expenditure Sanctioning

The authority given to General Managers to approve spending.

Signup and view all the flashcards

Delegation of Powers

General Managers can pass on their authority to lower authorities in consultation with financial advisors.

Signup and view all the flashcards

Re-delegation

The process by which delegated powers can be passed further down to lower authorities.

Signup and view all the flashcards

Financial Adviser Role

A key authority consulted when General Managers delegate their powers.

Signup and view all the flashcards

Railway Board Orders

Directions issued by the Railway Board regarding the regulations that GMs must follow.

Signup and view all the flashcards

Refund of Fare/Freight

A financial adjustment that requires higher authority's approval if over Rs. 20,000.

Signup and view all the flashcards

Codal Provisions

The existing rules and regulations governing financial practices within the railway.

Signup and view all the flashcards

Railway write-off limit

Amounts due to Railways can be written off if over Rs. 10,000.

Signup and view all the flashcards

Wharfage charges

Charges not subjected to write-off limits by the Railway Administration.

Signup and view all the flashcards

Supreme Court appeal

Involves filing or defending an appeal in the highest court.

Signup and view all the flashcards

Railway Counsel fees

Engagement of Railway Counsel can exceed Ministry prescribed fees.

Signup and view all the flashcards

Counsel per day charges

Maximum fee for counsel is Rs. 1,050 in Supreme Court and Rs. 750 elsewhere.

Signup and view all the flashcards

Arbitration fees limit

Payment of arbitration fees to private persons limited to Rs. 5,000.

Signup and view all the flashcards

Medical institution contributions

Contributions to medical institutions are limited to Rs. 1,000 per annum.

Signup and view all the flashcards

Professional institution subscription

Subscriptions to professional institutions capped at Rs. 2,500 annually.

Signup and view all the flashcards

Central Government compensation rules

Accident compensation governed by the Central Government's rules under Rly. Act.

Signup and view all the flashcards

Contractor Payment Exceeding Limits

Payments awarded by arbitrators exceeding Rs. 50,000 above the Railway Administration's assessed amount.

Signup and view all the flashcards

General Conditions of Contract Deficiencies

Shortcomings in the General conditions of contract or procedure identified by the Railway Board.

Signup and view all the flashcards

Irrecoverable Loss Write-Off

Losses exceeding Rs. 1 lakh are written off if a Railway employee is responsible.

Signup and view all the flashcards

Non-Employee Loss Write-Off

Losses exceeding Rs. 2 lakhs can be written off when no Railway employee is liable.

Signup and view all the flashcards

Reporting Large Losses

Important cases of loss must be reported to the Railway Board immediately regardless of amount.

Signup and view all the flashcards

Unusual Features in Loss

Losses under Rs. 50,000 need reporting only if they reveal serious procedural defects.

Signup and view all the flashcards

Suspense Heads Balance

General Managers can write off inefficient balances not exceeding Rs. 1 lakh.

Signup and view all the flashcards

Station Rate Quoting

Powers for quoting rates between stations are detailed in Chapter II of the relevant code.

Signup and view all the flashcards

Role of the General Manager

General Managers have specific powers in commercial matters, especially financial write-offs.

Signup and view all the flashcards

Higher Authority Sanction

Approval needed from senior officials for certain expenditures.

Signup and view all the flashcards

Railway write-off criteria

Conditions under which amounts due to Railways can be written off.

Signup and view all the flashcards

Supreme Court appeal process

Procedures for filing or defending appeals at the Supreme Court.

Signup and view all the flashcards

Counsel fee limitations

Fees for engaging counsel cannot exceed set amounts.

Signup and view all the flashcards

Private arbitration fees

Maximum fee payment for private arbitrators capped at Rs. 5,000.

Signup and view all the flashcards

Compensation rules for accidents

Accident compensations governed by specific government rules.

Signup and view all the flashcards

Wharfage charge exceptions

Certain charges can be written off without authority approval.

Signup and view all the flashcards

Sanctioning fees for surveyors

General Managers have full powers for surveyor fees assessment.

Signup and view all the flashcards

Compensation Limits

Maximum compensation payouts for public injuries or property damage.

Signup and view all the flashcards

Out of Court Claims Limit

Maximum compensation for out-of-court settlements for damages.

Signup and view all the flashcards

Court-Decreed Claims Powers

Authority to pay claims ordered by a court of law.

Signup and view all the flashcards

Claims Reporting Requirement

Condition to report claims over 25,000 to Railway Board.

Signup and view all the flashcards

Public Compensation Conditions

Terms governing compensation payouts for injuries to the public.

Signup and view all the flashcards

Claims Beyond Limits

Authority for claims exceeding specified limits must be reported.

Signup and view all the flashcards

Compensation for Damaged Goods

Claims for compensation due to goods that were lost or damaged.

Signup and view all the flashcards

Authority Delegation Restrictions

Conditions under which powers cannot be redelegated.

Signup and view all the flashcards

Contractor Payment Excess

Payments exceeding Rs. 50,000 awarded by arbitrators over Railway's assessed amount.

Signup and view all the flashcards

Contract Deficiency Reporting

Identifying and reporting deficiencies in the General conditions of contract.

Signup and view all the flashcards

Irrecoverable Loss Criteria

Criteria for writing off losses of cash, stores, tools over Rs. 1 lakh if a Railway employee is responsible.

Signup and view all the flashcards

Important Loss Reporting

Requirement to report significant loss cases to the Railway Board immediately.

Signup and view all the flashcards

Unusual Loss Features

Losses under Rs. 50,000 need reporting only if unusual features exist that reveal serious defects.

Signup and view all the flashcards

Suspense Heads Write-Off

General Managers can write off inefficient balances under Suspense Heads not exceeding Rs. 1 lakh.

Signup and view all the flashcards

Station Rate Quoting Powers

Powers related to quoting rates between stations outlined in Chapter II of the code.

Signup and view all the flashcards

Fiscal Write-Off Limit

General Managers can write off amounts due to Railways over Rs. 10,000.

Signup and view all the flashcards

Loss Notification Process

The procedure for notifying about discovered losses to the Railway Board promptly.

Signup and view all the flashcards

Railway Debt Write-Off Limit

Amounts due to Railways can be written off if over Rs. 10,000.

Signup and view all the flashcards

Counsel Fee Cap

Maximum fee for counsel is Rs. 1,050 in Supreme Court and Rs. 750 elsewhere.

Signup and view all the flashcards

Medical Institution Contribution Cap

Contributions to medical institutions limited to Rs. 1,000 per annum.

Signup and view all the flashcards

Professional Institution Subscription Limit

Subscriptions to professional institutions capped at Rs. 2,500 annually.

Signup and view all the flashcards

Compensation for Ordinary Passengers

Governed by rules for injuries to ordinary passengers as per Rly. Act 1989.

Signup and view all the flashcards

General Manager Full Powers

General Managers can pay surveyor fees for damage assessments without limits.

Signup and view all the flashcards

Loss Reporting to Railway Board

Important loss cases must be reported to the Railway Board, regardless of amount.

Signup and view all the flashcards

Financial Write-Off Criteria

Conditions under which amounts due to Railways may be written off.

Signup and view all the flashcards

Public Compensation for Railway Accidents

Maximum amount payable for public injury or property damage due to railway negligence, up to Rs. 10,000.

Signup and view all the flashcards

Claims Settled Out of Court

Agreements made without court involvement, limited to Rs. 10,000 for each case.

Signup and view all the flashcards

Court-Decreed Claims Reporting

Claims ordered by a court must be reported if exceeding Rs. 25,000.

Signup and view all the flashcards

Compensation for Injury Claims

Compensation claims for injuries or damages caused by negligence are subject to limit.

Signup and view all the flashcards

Claims Payment Powers

Rights granted to railroad authorities to directly pay claims based on specific guidelines.

Signup and view all the flashcards

Arbitration Settlement Powers

Full powers to settle claims by arbitration and inform the Railway Board of details.

Signup and view all the flashcards

Claim Limits for Negligence

Claims for negligence or carelessness in service are fixed at specific monetary limits.

Signup and view all the flashcards

Reporting Large Compensation Payments

Condition to inform Railway Board of claims exceeding Rs. 25,000 for tracking.

Signup and view all the flashcards

Conditions for Out of Court Settlements

Specific circumstances under which claims can be settled without court, with a limit of Rs. 25,000.

Signup and view all the flashcards

Higher Authority Involvement

Certain claims or expenditures need approvals from higher authorities for validity.

Signup and view all the flashcards

Previous Sanction Requirement

Certain expenditures like fare refunds over Rs. 20,000 require approval from higher authority.

Signup and view all the flashcards

Re-delegation of Powers

Delegated powers can be passed further down to lower authorities for specific tasks.

Signup and view all the flashcards

Financial Adviser Consultation

Essential for General Managers before delegation or re-delegation of powers.

Signup and view all the flashcards

Railway Board Regulations

Guide the exercise of powers by General Managers, including restrictions on expenditures.

Signup and view all the flashcards

Expenditure Sanction Limits

Limits set on how much GMs can sanction before needing further approval.

Signup and view all the flashcards

Refund of Fares

General Managers can approve fare refunds, but over Rs. 20,000 needs higher authority sanctions.

Signup and view all the flashcards

Contractor Payment Limits

Payments to contractors exceeding Rs. 50,000 beyond the assessed amount require special attention.

Signup and view all the flashcards

Contract Condition Deficiencies

Identified shortcomings in General conditions of contract should be promptly reported.

Signup and view all the flashcards

Irrecoverable Loss Limits

Losses over Rs. 1 lakh can be written off if a Railway employee is at fault.

Signup and view all the flashcards

Loss Reporting Requirement

Any significant loss must be reported to the Railway Board immediately, regardless of amounts.

Signup and view all the flashcards

Suspense Heads Write-Off Authority

General Managers can write off balances under suspense heads if they do not exceed Rs. 1 lakh.

Signup and view all the flashcards

Fiscal Write-Off Criteria

Conditions under which due amounts can be written off, especially above Rs. 10,000.

Signup and view all the flashcards

Study Notes

Powers of General Managers in Commercial Matters

  • General Managers' powers are detailed in Appendix 11 of the Indian Railway Financial Code, Volume I. These powers have been revised over time.
  • General Managers cannot sanction certain expenditures or handle specific matters without prior approval from a higher authority.
  • Rules permit delegated powers to subordinate authorities, subject to Financial Advisor and Chief Accounts Officer consultation. Delegations must also comply with existing regulations issued by the Railway Board.
  • Delegated powers are constrained by existing rules and regulations and Railway Board directives on expenditure, economy and other matters.
  • Railway Board can impose restrictions regarding expenditure, economy, and other matters.
  • Refunds or write-offs of amounts exceeding specific thresholds require higher authority approval.
    • Refunds or write-offs of fares/freight (over ₹20,000 each case).
    • Write-offs of amounts due to Railways (over ₹10,000 each case).
  • Wharfage, demurrage, storage, and lost property charges can be handled without higher authority approval.
  • Legal proceedings (Supreme Court appeals, counsel engagement exceeding specific rates—₹1,050/day in Supreme Court or High Courts, ₹750/day elsewhere; engagement of counsel exceeding prescribed scales) and arbitration fees requiring higher authority approval, including those exceeding ₹5,000.
  • Compensation payments in cases of railway accidents have certain limits for different categories of passengers (ordinary passengers, military personnel, general public), and are subject to specific laws and guidelines.
  • Payment for assessments of damaged consignments is within the General Manager's authority.
  • General Managers can write off certain debts below specific thresholds (under ₹10,000).
  • Important loss cases, and loss cases concerning employee's liability (exceeding ₹50,000), should be reported to the Railway Board, as well as cases with unusual features or serious procedural defects.
  • Inefficient balances under suspense accounts not exceeding ₹1 lakh can be written off by the General Manager.
  • General Managers have authority for quoting station-to-station rates as contained in Chapter II of the Code.
  • In certain cases involving compensation for railway accidents, the General Manager has full powers for payments up to specific thresholds.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Indian Railways GCC Quiz
5 questions

Indian Railways GCC Quiz

ReverentForethought avatar
ReverentForethought
Indian Railways General Rules Quiz
78 questions
Indian Railways General Information Quiz
39 questions
Use Quizgecko on...
Browser
Browser