PMAY Regulations Quiz

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the FSI available in a developed area under PMAY?

  • 2.0
  • 2.5 (correct)
  • 3.0
  • 1.5

What is the minimum road width required for agricultural land construction?

  • 12 meters
  • 9 meters (correct)
  • 15 meters
  • 6 meters

How much area can be used for shops in developed area construction under PMAY?

  • 15%
  • 5%
  • 10% (correct)
  • 20%

What is the FSI for agricultural land under PMAY?

<p>1.0 (D)</p> Signup and view all the answers

How much FSI is available in U-1 and U-2 zones of Mumbai Metropolitan Region?

<p>2.5 (A)</p> Signup and view all the answers

Who is responsible for providing electricity, water, and sanitation facilities?

<p>Municipality (C)</p> Signup and view all the answers

Can two houses be merged under PMAY rules?

<p>No (A)</p> Signup and view all the answers

What percentage of built-up area is reserved for residential development in developed areas?

<p>60% (B)</p> Signup and view all the answers

Flashcards

FSI in developed PMAY areas

The Floor Space Index (FSI) for developed areas under the Pradhan Mantri Awas Yojana (PMAY) is 2.5

Minimum road width for agricultural land

The minimum road width required for agricultural land construction under PMAY is 9 meters.

Shop area percentage in developed areas

A maximum of 10% of the built-up area in a developed PMAY project can be allocated for shops.

FSI for agricultural land under PMAY

The allowable building area for agricultural land in a PMAY Project is 1.0.

Signup and view all the flashcards

FSI in Mumbai U-1/U-2 zones

The Floor Space Index for U-1 and U-2 zones in the Mumbai Metropolitan Region is 2.5.

Signup and view all the flashcards

Minimum road width for regional planning

The minimum road width for regional planning areas under PMAY is 9 meters.

Signup and view all the flashcards

Responsibility for utilities in PMAY projects

The Municipality is responsible for providing electricity, water, and sanitation facilities related to PMAY developments.

Signup and view all the flashcards

Merging houses under PMAY rules

Under PMAY, rules do not permit merging of houses within the development scheme.

Signup and view all the flashcards

Study Notes

PMAY (Pradhan Mantri Awas Yojana) Regulations

  • Floor Space Index (FSI) in Developed Areas: 2.5
  • Minimum Road Width for Agricultural Land Construction: 9 meters
  • Shop Area Percentage in Developed Areas: 10%
  • FSI for Agricultural Land: 1.0
  • FSI for U-1 and U-2 Zones (Mumbai): 2.5
  • Minimum Road Width for Regional Planning Areas: 9 meters
  • Responsibility for Utilities (Electricity, Water, Sanitation): Municipality
  • House Merging under PMAY: Not allowed
  • Residential Development Area Percentage: 60%
  • Developer's Responsibilities: Roads, gardens within the project

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

Pradhan Mantri Awaas Yojana Gramin Overview
10 questions
PMAY-G Rural Housing Scheme
38 questions
Use Quizgecko on...
Browser
Browser