Philippines Plumbing Code Permit Administration

ConstructiveCharacterization avatar
ConstructiveCharacterization
·
·
Download

Start Quiz

Study Flashcards

8 Questions

Who can issue a plumbing permit?

Building Official

What is the validity period of a plumbing permit if the work has not started?

1 year

Who can apply for a plumbing permit?

RMP or Building Owner

What is the purpose of Section 104 of the Plumbing Code?

Application for existing plumbing system

How many sets of plans are required to be submitted for a plumbing permit?

6 sets

What is the fee for renewing a plumbing permit?

50% of the original fee

Who can conduct inspections of plumbing systems?

Administrative personnel or Plumbing Inspector

How many days' notice is required for a request for inspection of plumbing equipment?

72 hours

Study Notes

Administration of Permits

  • Permits are required and can be issued to a Registered and Licensed Master Plumber (RMP) who holds a valid, unexpired, and unrevoked certificate.

Permit Application

  • The application must include:
    • RMP's information
    • Building owner's information
    • Details of plumbing work
    • Land registration and street address
    • Use or occupancy information
    • Plans, drawings, diagrams, and technical specifications
    • Signed by the owner or permittee and the RMP
    • 6 sets of signed and sealed plans and specifications

Permit Issuance

  • The permit is approved by the administrative authority
  • One set of plans is retained by the administrative authority
  • Two sets are given to the applicant or owner
  • One set is kept at the jobsite
  • The permit is valid for 1 year or 365 days if plumbing work has not started
  • If the work is suspended, the permit is valid for 4 months or 120 days
  • Renewal fees are 50% of the original fee

Application for Existing Plumbing System

  • The permit is required for:
    • Additions, alterations, or repairs to existing plumbing systems
    • Changes in building occupancy
    • Maintenance of plumbing systems, including materials and appurtenances
    • Existing or new plumbing systems in moved buildings

Inspections

  • Inspections are conducted by administrative plumbing personnel and plumbing inspectors
  • Inspection requests must be made at least 72 hours or 3 days before the scheduled inspection date

This quiz covers the administration of plumbing permits in the Philippines, including permit requirements and issuing authorities.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Use Quizgecko on...
Browser
Browser