16 Questions
What is the Document ID for the Permit to Work System document?
SP-2329
Who is identified as panel members in section 18.4?
Safety advisors
What is the Effective date of Revision 6.6?
June-23
Where does the controlled version of the CMF Document reside?
Online in Livelink®
What is the Discipline Owner of the document?
Production Operations UOP
What is the security status of the document?
Unrestricted
What change was made in section 7.5 of the document?
Added limits on the amount of work under an Area Authority
In which section was the condition added that the work shall take place within a nonhydrocarbon areas and new constructed Remote manifolds?
Appendix 9
What was updated in section 3 of Contractor’s Own PTW System?
Updated SIMOPS information and instruction
What was added in section 19.3.4 of the document?
New R&R in part 5.1.3 Agreement of affected custodian
What change occurred in section 20 of the document?
Added Section 20: ePTW Supplementary Certificates Not to be Used
What was added in Part 4.1 of the document?
Adding in Part 4.1 Permit Applicant shall review PDO LFIs; attach any LFIs that are relevant to the permit
What revision is effective from June-23?
Revision 6.6
Where does the controlled version of the CMF Document reside?
Online in Livelink®
'Hardcopy' was removed from which reference procedure?
(Hardcopy) from Reference Procedure Hardcopy to Reference Procedure only
'SIMOPS information and instruction' was updated in which sections?
(In section 19.3.4 Removing (Auditor (s) from within the area or nominated auditors from other areas can conduct the audit))
Study Notes
Document Information
- The Document ID for the Permit to Work System document is not specified.
- The Discipline Owner of the document is not specified.
- The security status of the document is not specified.
Document Control
- The controlled version of the CMF Document resides in a specific location, but the location is not specified.
Revision History
- Revision 6.6 is effective from a specific date, but the date is not specified.
Section Updates
- Section 7.5 was updated with unspecified changes.
- Section 3 of Contractor's Own PTW System was updated, but the changes are not specified.
New Additions
- A condition was added in an unspecified section that the work shall take place within non-hydrocarbon areas and new constructed Remote manifolds.
- Unspecified information was added in section 19.3.4 of the document.
- Unspecified information was added in Part 4.1 of the document.
Revision Changes
- Revision 6.6 is effective from June-23.
- Changes occurred in section 20 of the document, but the details are not specified.
Reference Procedure Updates
- 'Hardcopy' was removed from an unspecified reference procedure.
- SIMOPS information and instruction was updated in unspecified sections.
Test your knowledge of the Permit to Work System document from Petroleum Development Oman L.L.C. Understand the specifications, disciplines, and ownership related to the document.
Make Your Own Quizzes and Flashcards
Convert your notes into interactive study material.