Which planning tool is used for performance-based budgeting at the council/city level?
Which planning tool is used for performance-based budgeting at the council/city level?
- Council/City Council Development Plan (CDP) (correct)
- Medium-Term Expenditure Framework
- Urban Summary Plan (PSU)
- Sector Development Programme
Which of the following laws provides the legal framework for town planning in Cameroon?
Which of the following laws provides the legal framework for town planning in Cameroon?
- Law No. 2019/024
- Law No. to regulate town planning in Cameroon (correct)
- Law No. 2011/008
- Joint Order No. 000031
What does SND30 aim to achieve in the context of national strategic guidelines?
What does SND30 aim to achieve in the context of national strategic guidelines?
- Highlight regional development objectives.
- Breakdown national strategic guidelines into actions at the local level. (correct)
- Promote national cultural events.
- Outline international trade agreements.
Which document provides guidance for creating development plans for councils and city councils in Cameroon?
Which document provides guidance for creating development plans for councils and city councils in Cameroon?
Which body plays a role in CDP development?
Which body plays a role in CDP development?
During which stage of preparing a CDP are strategic choices formulated?
During which stage of preparing a CDP are strategic choices formulated?
What is a key element that the Council/City Council Development Plan (CDP) makes available for the programming phase?
What is a key element that the Council/City Council Development Plan (CDP) makes available for the programming phase?
Which tools are utilized primarily during the performance-based budget programming phase?
Which tools are utilized primarily during the performance-based budget programming phase?
What constitutes a pre-requisite for the preparation of Medium Term Budget Frameworks (MTBFs) and Medium Term Expenditure Frameworks (MTEFs)?
What constitutes a pre-requisite for the preparation of Medium Term Budget Frameworks (MTBFs) and Medium Term Expenditure Frameworks (MTEFs)?
According to the General Code of Regional and Local Authorities (RLAs), which article(s) provide the framework for MTBFs and MTEFs?
According to the General Code of Regional and Local Authorities (RLAs), which article(s) provide the framework for MTBFs and MTEFs?
In the context of preparing the MTBF & MTEF, who typically coordinates the process?
In the context of preparing the MTBF & MTEF, who typically coordinates the process?
During which stage of MTBF preparation is the resource forecast typically developed?
During which stage of MTBF preparation is the resource forecast typically developed?
What is the name of the preparatory activity that includes review of activities and projects while preparing the MTEF?
What is the name of the preparatory activity that includes review of activities and projects while preparing the MTEF?
Which of the following represents a key tool within the budgeting phase for performance-based budgeting?
Which of the following represents a key tool within the budgeting phase for performance-based budgeting?
What preliminary step is essential in preparing the budget?
What preliminary step is essential in preparing the budget?
Which legal document outlines articles concerning the RLA budget?
Which legal document outlines articles concerning the RLA budget?
Which body is responsible for the voting stage of the budget preparation process?
Which body is responsible for the voting stage of the budget preparation process?
Which phase is included in the budget preparation procedures?
Which phase is included in the budget preparation procedures?
In which part of the RSPES presentation plan would you find a monograph of the council?
In which part of the RSPES presentation plan would you find a monograph of the council?
Which of the following best describes Part Two of the RSPES preparation procedures?
Which of the following best describes Part Two of the RSPES preparation procedures?
Which element falls under Part One: Overall RLA Strategic Objective
when preparing the APP?
Which element falls under Part One: Overall RLA Strategic Objective
when preparing the APP?
Which of the following is included in the annexes when preparing the APP?
Which of the following is included in the annexes when preparing the APP?
Which tools are essential for monitoring and evaluating the execution of performance-based budgeting?
Which tools are essential for monitoring and evaluating the execution of performance-based budgeting?
Under the General Code of RLAs, which article relates to the PPA and its annex, PTA?
Under the General Code of RLAs, which article relates to the PPA and its annex, PTA?
Who are the primary actors involved in preparing the monitoring and evaluation plan?
Who are the primary actors involved in preparing the monitoring and evaluation plan?
What initial step is crucial in formulating the Annual Work Plan (AWP)?
What initial step is crucial in formulating the Annual Work Plan (AWP)?
Which document serves as an input when preparing the AWP?
Which document serves as an input when preparing the AWP?
What information is detailed in the programme monitoring plan?
What information is detailed in the programme monitoring plan?
What are three key elements specified by a monitoring plan?
What are three key elements specified by a monitoring plan?
What step is essential to ensure the successful implemention of a monitoring plan?
What step is essential to ensure the successful implemention of a monitoring plan?
What is the general objective of module 4? Provide the best response.
What is the general objective of module 4? Provide the best response.
Which of these options is NOT a specific objective listed for module 4?
Which of these options is NOT a specific objective listed for module 4?
Which of these best describes the terms of reference for programming tools?
Which of these best describes the terms of reference for programming tools?
What questions should you ask regarding the terms of reference for the monitoring and evaluating tools?
What questions should you ask regarding the terms of reference for the monitoring and evaluating tools?
According to the presentation, what are the terms of reference for the budgeting tools?
According to the presentation, what are the terms of reference for the budgeting tools?
When using planning tools for performance-based budgeting, understanding coordinating bodies is essential. According to the presentation, what are the terms of reference for your coordinating bodies for REFARMING PLANNING TOOLS?
When using planning tools for performance-based budgeting, understanding coordinating bodies is essential. According to the presentation, what are the terms of reference for your coordinating bodies for REFARMING PLANNING TOOLS?
To ensure alignment with national strategies, which action is undertaken concerning national strategic guidelines within the SND30 framework?
To ensure alignment with national strategies, which action is undertaken concerning national strategic guidelines within the SND30 framework?
When defining the terms of reference for programming tools in performance-based budgeting, which consideration is most essential?
When defining the terms of reference for programming tools in performance-based budgeting, which consideration is most essential?
In the context of performance-based budgeting, how do Medium-Term Budget Frameworks (MTBFs) and Medium-Term Expenditure Frameworks (MTEFs) relate to project maturation?
In the context of performance-based budgeting, how do Medium-Term Budget Frameworks (MTBFs) and Medium-Term Expenditure Frameworks (MTEFs) relate to project maturation?
According to the General Code of Regional and Local Authorities, what roles does the Chief Executive play in the MTBF and MTEF preparation?
According to the General Code of Regional and Local Authorities, what roles does the Chief Executive play in the MTBF and MTEF preparation?
How does the program monitoring plan ensure effective performance measurement?
How does the program monitoring plan ensure effective performance measurement?
Flashcards
General Objective of Module 4
General Objective of Module 4
Identifies and explains tools for performance-based budgeting.
Specific Objectives of Module 4
Specific Objectives of Module 4
Tools for planning, programming, budgeting, and monitoring/evaluation phases.
Council/City Development Plan (CDP)
Council/City Development Plan (CDP)
A development plan created by a council or city council.
Law No. Town Planning Cameroon
Law No. Town Planning Cameroon
Signup and view all the flashcards
Master Plan for Urban Development (PDU)
Master Plan for Urban Development (PDU)
Signup and view all the flashcards
Land Use Plan (POS)
Land Use Plan (POS)
Signup and view all the flashcards
Sector Plan (PS)
Sector Plan (PS)
Signup and view all the flashcards
Urban Summary Plan (PSU)
Urban Summary Plan (PSU)
Signup and view all the flashcards
Law No. 2011/008 Cameroon
Law No. 2011/008 Cameroon
Signup and view all the flashcards
National Scheme Land Use
National Scheme Land Use
Signup and view all the flashcards
Regional Land-Use Schemes (SRADDT)
Regional Land-Use Schemes (SRADDT)
Signup and view all the flashcards
Sector Development Program
Sector Development Program
Signup and view all the flashcards
Local Land Use Plans
Local Land Use Plans
Signup and view all the flashcards
Articles 157 et al: Devolution
Articles 157 et al: Devolution
Signup and view all the flashcards
Articles 269 et al: Devolution Regions
Articles 269 et al: Devolution Regions
Signup and view all the flashcards
SND30: Breakdown Guidelines
SND30: Breakdown Guidelines
Signup and view all the flashcards
Methodological Guide, 2024
Methodological Guide, 2024
Signup and view all the flashcards
CDP Development Bodies
CDP Development Bodies
Signup and view all the flashcards
Stages in Preparing a CDP
Stages in Preparing a CDP
Signup and view all the flashcards
CDP Elements for Programming
CDP Elements for Programming
Signup and view all the flashcards
Medium-term Budget Framework
Medium-term Budget Framework
Signup and view all the flashcards
Medium-Term Expenditure Framework
Medium-Term Expenditure Framework
Signup and view all the flashcards
Pre-requisites for MTBFs/MTEFs
Pre-requisites for MTBFs/MTEFs
Signup and view all the flashcards
Legal basis MTBFs/MTEFs
Legal basis MTBFs/MTEFs
Signup and view all the flashcards
Procedure for Preparing MTBF
Procedure for Preparing MTBF
Signup and view all the flashcards
Procedure for Preparing MTEF
Procedure for Preparing MTEF
Signup and view all the flashcards
Actors for MTBF & MTEF
Actors for MTBF & MTEF
Signup and view all the flashcards
Budgeting Tools
Budgeting Tools
Signup and view all the flashcards
Preliminary Budget Prep
Preliminary Budget Prep
Signup and view all the flashcards
Articles 374, 385, 386
Articles 374, 385, 386
Signup and view all the flashcards
Article 416, 418, 419
Article 416, 418, 419
Signup and view all the flashcards
Actors in Budget Preparation
Actors in Budget Preparation
Signup and view all the flashcards
Budget Preparation Procedures
Budget Preparation Procedures
Signup and view all the flashcards
RSPES Preparation Items
RSPES Preparation Items
Signup and view all the flashcards
APP procedures
APP procedures
Signup and view all the flashcards
PPA annexes
PPA annexes
Signup and view all the flashcards
Monitoring tools
Monitoring tools
Signup and view all the flashcards
Basis Framework
Basis Framework
Signup and view all the flashcards
Actors in plan
Actors in plan
Signup and view all the flashcards
AWP steps
AWP steps
Signup and view all the flashcards
Inputs Needed.
Inputs Needed.
Signup and view all the flashcards
Helps performance
Helps performance
Signup and view all the flashcards
Programme Plan
Programme Plan
Signup and view all the flashcards
Verified Data
Verified Data
Signup and view all the flashcards
Study Notes
- The general objective of Module 4 is to enable participants to identify and explain the tools for implementing performance-based budgeting.
- The specific objectives include idenifying and explaining tools used in:
- The planning phase
- The programming phase
- The budgeting phase
- The monitoring and evaluation phase
Terms of Reference for Planning Tools
- Key questions to consider when thinking about planning tools:
- What planning tool is being used for performance-based budgeting?
- What is its framework or legal basis?
- What are the coordinating bodies?
- What are the planning procedures involved?
- What elements will the planning tool make available for the programming phase?
Terms of Reference for Programming Tools
- Key questions to consider include:
- What programming tools are being used for performance-based budgeting?
- What are the prerequisites for their preparation?
- What is the programming tool's framework or legal basis?
- What are the development actors involved?
- What are the planning procedures?
Terms of Reference for Budgeting Tools
- Key questions for budgeting tools:
- What budgeting tools are being implemented for the performance-based budget programme?
- What are the prerequisites for their development?
- What is the framework or legal basis for using budgeting tools?
- Who are the actors or what are the design stages involved?
- What are the planning procedures?
Terms of Reference for Monitoring & Evaluating Tools
- What monitoring and evaluating tools will be implemented for the performance-based budget?
- What is the framework or legal basis for the monitoring and evaluating tools?
- Who are the actors or what are the design stages involved in the monitoring and evaluating tools?
- What are the planning procedures for the monitoring and evaluating tools?
Reframing Planning Tools
Question 1: Tool for Performance-Based Budget Planning Phase
- The Council/City Council Development Plan (CDP) can be used.
Question 2: Framework and/or Legal Basis
- Laws to regulate town planning in Cameroon are important.
- Article 26 covers:
- The Master Plan for Urban Development (PDU)
- Land Use Plan (POS)
- Sector Plan (PS)
- Urban Summary Plan (PSU)
- Law No. 2011/008 of 06 May 2011 relates to land use planning and sustainable development in Cameroon (Article 10...).
- The National Scheme for the Land Use and Sustainable Development
- The Regional land-use planning and development schemes (SRADDT)
- Sector Development Programme
- Local Land Use and Sustainable Development Plans
- Law No. 2019/024 of 24 December 2019 institutes the General Code of Regional and Local Authorities.
- Articles 157 et al cover devolution of planning powers to Councils
- Articles 269 et al cover devolution of planning powers to Regions
- The SND30 is also relevant:
- National strategic guidelines are broken down into actions to be implemented at the local level.
- RLAs contributions to the achievement of national development objectives are highlighted
- The implementation of the National Development Policy is coherent
- The methodological guide to preparing development plans for councils and city councils in Cameroon, 2024 edition.
Question 3: CDP Development Bodies
- Bodies involved in CDP developments:
- Municipal/Community Council
- Steering committee
- Technical Monitoring Committee
Question 4: Stages in Preparing a CDP
- Preparing a CDP involves 8 stages:
- Preparing the planning process
- Participatory diagnosis
- Strategic forecasting
- Formulating strategic choices
- Cost and budget framework
- Preparation of the implementation, monitoring and evaluation mechanism
- Validation of the CDP
- Dissemination and popularisation of the CDP
Question 5: Elements Made Available for the Programming Phase by the CDP
- Ideas for development projects
Reframing Programming Phase Tools
Question 1: Tools for Performance-Based Budget Programming Phase
- Medium-term budget framework
- Medium-Term Expenditure Framework
- Project maturation is a pre-requisite for preparing MTBFs and MTEFs.
Question 2: Framework and/or Legal Basis for MTBFs & MTEFs
- Article 373 (1) and (2) of the General Code of RLAs is the legal basis.
Question 3: Actors Involved in Preparing the MTBF & MTEF
Acteurs | Préparation | Coordination | Validation |
---|---|---|---|
Le Chef de l'exécutif | X | X | X |
Le Secrétaire Général | X | ||
Le responsable de programme | X | ||
Le comité PPBS | X | ||
L'organe délibérant de la CTD | X |
Question 4: Procedure for Preparing the MTBF
- Preparing the MTBF development process
- Resource forecast
- Expenditure forecast
- Proposed expenditure framework
- Consolidation and validation of the MTBF
Question 4: Procedure for Preparing the MTEF
- Development process includes:
- Strategic phase
- Detailed preparatory phase
- Preparatory stages include:
- Preliminary activities
- Review of activities and projects
- Performance review
- Following the development process the next steps are:
- Preparation of the Initial MTEF
- Preparation of the adjusted MTEF
- Preparation of the final MTEF
Reframing the Tools for the Budgeting Phase
Question 1: Budgeting Tools
- Budget
- RSPES
- APP
Question 1: Preliminary Preparation of the Budget
- Citizen consultations should be performed.
Question 2: Framework and/or Legal Basis
- Law No. 2019/024 of 24 December 2019 institutes the General Code of RLAs.
- Article 374, 385 and 386 on RLA budget
- Article 416, 418 and 419 sur les CC, RSPES and APP
- Joint Order No. 000031/AC/MINDDEVEL/MINFI of 03 March 2021 on RLA budget calendar
Question 3: Actors and/or Bodies in Charge of Preparing the Plan
Actors/bodies | Preparation | Voting | Approval |
---|---|---|---|
The Chief Executive | X | ||
The Secretary General | X (coordinates) | ||
Programme Manager | X | ||
The RLA deliberative organ | X (BOD) | ||
The Representative of the State | X |
Question 4: Budget Preparation Procedures
- Stages involved in the budget preparation procedures:
- The preparatory phase
- The framing phase
- The detailed preparation phase
- The adoption and approval phase
Question 4: RSPES Preparation Procedures
Presentation Plan:
- Introduction
- Part One: Presentation of the situation of the council in year N
- A-Monograph of the council
- Geographical and socio-economic data
- Regional dynamics: data on council institutions, etc.
- B-Local economic situation
- Presentation of State priorities for the next 3 years (summary of BOD / State budget preparation circular)
- Presentation of local planning priorities: results of public consultations
- C-Financial and physical execution situation of the budget at mid-term
- Financial execution situation at mid-term (specify period)
- Mid-term physical execution situation (specify period)
- A-Monograph of the council
- Part Two: Medium term budget prospects for the council
- Tax policy and investment financing strategy over the next 3 (or) 5 years
- Socio-economic prospects for the council
- Supply of basic social services
- Economic and environmental development
- Youth, sport and culture
- Locale Governance
- Success and risk factors
- Conclusion
Question 4: Procedures for Preparing the APP
- PART ONE: OVERALL RLA STRATEGIC OBJECTIVE
- Strategic framing of RLA: Presentation of national priorities in line with RLA missions
- Presentation of the domain of intervention of RLAs: competences devolved to RLAs
- Presentation of the strategic objective of RLA: Presentation of the RLA strategic objective
- Strategic framework: Presentation of the strategic framework for the programmes and actions by programme
- PART TWO: RLA OPERATIONAL FRAMEWORK
- Presentation of past performance and prospects: Past performance, difficulties encountered and prospects, programme performance targets
- Framework for estimating budgetary resources: evaluation of the RLA's medium-term budgetary resources, estimate of medium-term financial resources
- Presentation of expenditure per programme
- Objective
- Functioning: CA & PA
- Investment: CA & PA
- Presentation of expenditure per action and per programme
- Objective
- Functioning: CA & PA
- Investment: CA & PA
The following annexes are required
- Annual Work Plan (AWP)
- Indicator sheet
- Commitment plan
Reframing Monitoring and Evaluation Tools
Question 1: Tools for Monitoring and Evaluating the Execution of Performance-Based Budgeting
- The monitoring and evaluating tools will be:
- AWP
- Monitoring and evaluation plan
Question 2: Framework and/or Legal Basis
- Law No. 2019/024 of 24 December 2019 institutes the General Code of RLAs.
- Article 419 on the PPA (the PTA is an annex)
Question 3: Actors and/or Bodies in Charge of Preparing the Plan
- The Mayor
- Programme Manager
Question 4: Procedures for Preparing the AWP
TITLE | STAGES |
---|---|
Process | Identify the units and individuals in charge of drafting Set a schedule for drafting meetings Examining the current AWP with the planning group, as well as lessons learned from previous monitoring and evaluation reports Discuss the need to modify some of the current activities with the planning group |
Inputs | CDP, MTEF, Programme logical framework matrix, Programme of activities, Cost tables per activity, Organisational chart |
Question 4: Procedures for Preparing the AWP (AWP Template)
- Required information on the AWP Template:
- Programme; objective of the programme; action; activity; product indicator
- Tasks code; process indicator; CA; PA 2025; 2025 Execution Calendar (J F M A M J J A S O N D); Official
Question 4: Procedures for Preparing the Monitoring and Evaluation Plan
- The programme monitoring plan is a tool that provides a framework and guidance for the implementation of performance measurement tools.
- The plan is based on the logical framework of projects/programmes
- The plan details:
- The corresponding indicators
- Collection methods used
- The costs involved
- Time frames
- Performance targets
- The plan is largely based on the performance indicator sheet
- The plan contains an overall schedule of monitoring activities for the year in question, specifying who is in charge of each monitoring activity
- The plan specifies the various outputs produced by the monitoring system and the associated budget
- It also specifies the procedures for verifying the quality and reliability of the data (units in charge of verification, methods used, resources required)
- Finally the plan specifies the procedures for disseminating the information produced by the monitoring system to potential users
- To implement the monitoring plan, a structured system for collecting information on performance is required.