Podcast
Questions and Answers
When did NTPC start working on its first thermal power project at Shaktinagar?
When did NTPC start working on its first thermal power project at Shaktinagar?
- 1976 (correct)
- 1975
- 1983
- 1986
In which year did NTPC achieve power generation capacity of 2000 MW?
In which year did NTPC achieve power generation capacity of 2000 MW?
- 1986
- 1988
- 1985 (correct)
- 1983
When did NTPC commission two 500 MW units, one each in Rihand and Ramagundam?
When did NTPC commission two 500 MW units, one each in Rihand and Ramagundam?
- 1988 (correct)
- 1986
- 1983
- 1985
Which year saw NTPC take over the Talcher Thermal Power Station from Orissa State Electricity Board?
Which year saw NTPC take over the Talcher Thermal Power Station from Orissa State Electricity Board?
What is the primary function of NTPC Limited?
What is the primary function of NTPC Limited?
In what year did NTPC get listed on BSE and NSE?
In what year did NTPC get listed on BSE and NSE?
How does NTPC contribute to the total power generation in India?
How does NTPC contribute to the total power generation in India?
What is the total electric power generating capacity of NTPC?
What is the total electric power generating capacity of NTPC?
How many power stations does NTPC currently operate?
How many power stations does NTPC currently operate?
In which year was NTPC founded?
In which year was NTPC founded?
Flashcards
When did NTPC start its first thermal power project?
When did NTPC start its first thermal power project?
NTPC began working on its first thermal power project at Shaktinagar in 1976.
When did NTPC reach 2000 MW power generation capacity?
When did NTPC reach 2000 MW power generation capacity?
In 1985, NTPC achieved a power generation capacity of 2000 MW.
When did NTPC commission the 500 MW units?
When did NTPC commission the 500 MW units?
In 1988, NTPC commissioned two 500 MW units, one in Rihand and one in Ramagundam.
When did NTPC take over Talcher Thermal Power Station?
When did NTPC take over Talcher Thermal Power Station?
Signup and view all the flashcards
What is NTPC's primary function?
What is NTPC's primary function?
Signup and view all the flashcards
When did NTPC get listed on BSE and NSE?
When did NTPC get listed on BSE and NSE?
Signup and view all the flashcards
How does NTPC contribute to India's power generation?
How does NTPC contribute to India's power generation?
Signup and view all the flashcards
What is NTPC's total electric power generating capacity?
What is NTPC's total electric power generating capacity?
Signup and view all the flashcards
How many power stations does NTPC operate?
How many power stations does NTPC operate?
Signup and view all the flashcards
When was NTPC founded?
When was NTPC founded?
Signup and view all the flashcards
Study Notes
NTPC History
- NTPC began its first thermal power project at Shaktinagar in 1975.
- NTPC reached a power generation capacity of 2000 MW in 1984.
- In 1985, NTPC commissioned two 500 MW units, one each in Rihand and Ramagundam.
- NTPC took over the Talcher Thermal Power Station from the Orissa State Electricity Board in 1989.
NTPC Function
- NTPC Limited's primary function is generating and supplying electricity to various states in India.
NTPC Listing
- NTPC was listed on the Bombay Stock Exchange (BSE) and the National Stock Exchange of India (NSE) in 1991.
NTPC Power Generation
- NTPC contributes significantly to India's total power generation.
- As of now, NTPC operates 24 power stations across India.
- The total electric power generating capacity of NTPC is 62,828 MW.
- NTPC was founded in 1975.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Test your knowledge of NTPC Limited, a major Indian central Public Sector Undertaking engaged in electricity generation, distribution, consultancy, and project contracts. Learn about its history, operations, and headquarters.