NTPC Limited Overview

CatchyDwarf avatar
CatchyDwarf
·
·
Download

Start Quiz

Study Flashcards

10 Questions

When did NTPC start working on its first thermal power project at Shaktinagar?

1976

In which year did NTPC achieve power generation capacity of 2000 MW?

1985

When did NTPC commission two 500 MW units, one each in Rihand and Ramagundam?

1988

Which year saw NTPC take over the Talcher Thermal Power Station from Orissa State Electricity Board?

1995

What is the primary function of NTPC Limited?

Generating and distributing electricity

In what year did NTPC get listed on BSE and NSE?

2004

How does NTPC contribute to the total power generation in India?

By focusing on operating power plants at higher efficiency levels

What is the total electric power generating capacity of NTPC?

71,594 MW

How many power stations does NTPC currently operate?

55

In which year was NTPC founded?

1975

Test your knowledge of NTPC Limited, a major Indian central Public Sector Undertaking engaged in electricity generation, distribution, consultancy, and project contracts. Learn about its history, operations, and headquarters.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free