NTPC Quiz
10 Questions
29 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What was the total income of NTPC on a standalone basis for FY24?

Answer hidden

What was the increase in NTPC's standalone gross generation in FY24 compared to the previous year?

Answer hidden

What was the Plant Load Factor of NTPC Coal stations in FY24?

Answer hidden

What was the total dividend declared by NTPC for FY24?

Answer hidden

What was the purpose of the workshop conducted by NTPC in association with Microsoft and KPMG?

Answer hidden

What is the total installed capacity of NTPC with the completion of the trial operation of Unit#2 of North Karanpura Super Thermal Power Project?

Answer hidden

What is the benefit of using Air Cooled Condensers (ACC) in comparison to conventional Water-Cooled Condensers?

Answer hidden

What was the purpose of the workshop organized by RLI, Vindhyachal in association with Corporate Quality Assurance department?

Answer hidden

How many participants attended the workshop offline from NTPC-Vindhyachal, Singrauli, and Rihand?

Answer hidden

What recognition did NTPC Limited receive from the Top Employers Institute?

Answer hidden

Flashcards

What was NTPC's total standalone income for FY24?

₹ 1,65,707 crore

How much did NTPC's standalone gross generation increase in FY24 compared to the previous year?

5%

What was the Plant Load Factor of NTPC Coal stations in FY24?

77.25%

What was the total dividend declared by NTPC for FY24?

₹ 7.75 per equity share

Signup and view all the flashcards

Why did NTPC conduct a workshop with Microsoft and KPMG?

To explore the use of Artificial Intelligence (AI)

Signup and view all the flashcards

What is the total installed capacity of NTPC after Unit#2 of North Karanpura Super Thermal Power Project started trial operations?

75418 MW

Signup and view all the flashcards

what is the benefit of Air Cooled Condensers (ACC) over traditional Water-Cooled Condensers?

Reduces water consumption to 1/3rd

Signup and view all the flashcards

What was the purpose of the workshop organized by RLI, Vindhyachal, and the Corporate Quality Assurance department?

To discuss Quality Challenges in Super Critical / Ultra Critical Boilers and FGD System

Signup and view all the flashcards

How many participants attended the workshop offline from NTPC-Vindhyachal, Singrauli, and Rihand?

50

Signup and view all the flashcards

What recognition did NTPC Limited receive from the Top Employers Institute?

Top Employer in India

Signup and view all the flashcards

More Like This

Use Quizgecko on...
Browser
Browser