What is the purpose of conducting a survey of the entire Node area?

  • To find out the number of nodes in the area
  • To identify the geographical features of the area
  • To determine the predominant equipment and equipment manufacturers in the area (correct)
  • To assess the quality of the equipment in the area

What does the surveyed data need to be applied to, according to the text?

  • The quality assessment of the equipment
  • The equipment manufacturers' locations
  • The entire Node map (correct)
  • The geographical features of the area

What will a survey of the equipment in four corners of the node determine?

  • The types of equipment used in the area
  • The equipment manufacturers in the area (correct)
  • The number of nodes in the area
  • The geographical layout of the area

What information can be obtained from a survey of the entire Node area?

<p>What equipment and equipment manufacturers are predominately in the area (D)</p> Signup and view all the answers

What are the two main phases of the design process?

<p>Map update and design with deliverable creation (C)</p> Signup and view all the answers

What is the purpose of the walkout before design?

<p>To determine and reconcile discrepancies between the design platform and the existing equipment (C)</p> Signup and view all the answers

What must legacy equipment be capable of passing, according to the text?

<p>At least 1002MHz (A)</p> Signup and view all the answers

What does the upgrade design project involve replacing?

<p>Actives, passives, and power supplies (C)</p> Signup and view all the answers

What is the intent when upgrading existing networks?

<p>To use as much existing cable and as many existing passives as possible (A)</p> Signup and view all the answers

What does the walkout verify before the design stage?

<p>Discrepancies between the design platform and the existing equipment (B)</p> Signup and view all the answers

What is the main purpose of creating an 'As-Built' map in the context of high-split initiatives?

<p>To ensure that power size of equipment such as Amplifiers and Ports is correct (D)</p> Signup and view all the answers

What is the priority when upgrading active devices in the network to support 1218/258/204/5MHz signals?

<p>To ensure similar output levels to the legacy output levels (D)</p> Signup and view all the answers

What is the significance of the walkout information collected prior to upgrading high-split projects?

<p>To design the most efficient systems (B)</p> Signup and view all the answers

Why must the standards set forth in the document be upheld for a successful rollout of the High-Split initiative?

<p>To maintain existing locations and decrease the amount of redesign needed (C)</p> Signup and view all the answers

Study Notes

Survey and Design Process

  • Conducting a survey of the entire Node area is necessary to gather information about the existing network and infrastructure.
  • Surveyed data needs to be applied to the design and planning phase of the upgrade project.

Purpose of Surveying Equipment

  • A survey of the equipment in four corners of the node determines the type and condition of existing equipment.

Information from Node Area Survey

  • A survey of the entire Node area provides information about the layout, infrastructure, and existing equipment.

Design Process Phases

  • The two main phases of the design process are planning and implementation.

Walkout Purpose

  • The purpose of the walkout before design is to verify the existing infrastructure and equipment in the Node area.
  • The walkout verifies the accuracy of the surveyed data and ensures that the design is based on correct information.

Legacy Equipment Capability

  • Legacy equipment must be capable of passing 1218/258/204/5MHz signals.

Upgrade Design Project

  • The upgrade design project involves replacing existing equipment with new or upgraded equipment that supports high-split signals.

Upgrading Existing Networks

  • The intent when upgrading existing networks is to support high-split signals and ensure a successful rollout of the High-Split initiative.

'As-Built' Map Purpose

  • Creating an 'As-Built' map is necessary to document the existing network infrastructure and layout after the upgrade.

Priority when Upgrading Active Devices

  • The priority when upgrading active devices is to ensure that they can support 1218/258/204/5MHz signals.

Significance of Walkout Information

  • The walkout information collected prior to upgrading high-split projects is significant because it ensures accurate planning and design of the upgrade.

Importance of Upholding Standards

  • Upholding the standards set forth in the document is crucial for a successful rollout of the High-Split initiative.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Description

Test your knowledge about surveying equipment in a Node (Map Area) and determining the predominant equipment manufacturers in that specific area.

More Like This

Engineering Survey Essentials Quiz
3 questions
Fire Company Surveys and Equipment Inventory Management
40 questions
Surveying Principles and Techniques Quiz
53 questions
Use Quizgecko on...
Browser
Browser