Podcast
Questions and Answers
What is the purpose of conducting a survey of the entire Node area?
What is the purpose of conducting a survey of the entire Node area?
- To find out the number of nodes in the area
- To identify the geographical features of the area
- To determine the predominant equipment and equipment manufacturers in the area (correct)
- To assess the quality of the equipment in the area
What does the surveyed data need to be applied to, according to the text?
What does the surveyed data need to be applied to, according to the text?
- The quality assessment of the equipment
- The equipment manufacturers' locations
- The entire Node map (correct)
- The geographical features of the area
What will a survey of the equipment in four corners of the node determine?
What will a survey of the equipment in four corners of the node determine?
- The types of equipment used in the area
- The equipment manufacturers in the area (correct)
- The number of nodes in the area
- The geographical layout of the area
What information can be obtained from a survey of the entire Node area?
What information can be obtained from a survey of the entire Node area?
What are the two main phases of the design process?
What are the two main phases of the design process?
What is the purpose of the walkout before design?
What is the purpose of the walkout before design?
What must legacy equipment be capable of passing, according to the text?
What must legacy equipment be capable of passing, according to the text?
What does the upgrade design project involve replacing?
What does the upgrade design project involve replacing?
What is the intent when upgrading existing networks?
What is the intent when upgrading existing networks?
What does the walkout verify before the design stage?
What does the walkout verify before the design stage?
What is the main purpose of creating an 'As-Built' map in the context of high-split initiatives?
What is the main purpose of creating an 'As-Built' map in the context of high-split initiatives?
What is the priority when upgrading active devices in the network to support 1218/258/204/5MHz signals?
What is the priority when upgrading active devices in the network to support 1218/258/204/5MHz signals?
What is the significance of the walkout information collected prior to upgrading high-split projects?
What is the significance of the walkout information collected prior to upgrading high-split projects?
Why must the standards set forth in the document be upheld for a successful rollout of the High-Split initiative?
Why must the standards set forth in the document be upheld for a successful rollout of the High-Split initiative?
Study Notes
Survey and Design Process
- Conducting a survey of the entire Node area is necessary to gather information about the existing network and infrastructure.
- Surveyed data needs to be applied to the design and planning phase of the upgrade project.
Purpose of Surveying Equipment
- A survey of the equipment in four corners of the node determines the type and condition of existing equipment.
Information from Node Area Survey
- A survey of the entire Node area provides information about the layout, infrastructure, and existing equipment.
Design Process Phases
- The two main phases of the design process are planning and implementation.
Walkout Purpose
- The purpose of the walkout before design is to verify the existing infrastructure and equipment in the Node area.
- The walkout verifies the accuracy of the surveyed data and ensures that the design is based on correct information.
Legacy Equipment Capability
- Legacy equipment must be capable of passing 1218/258/204/5MHz signals.
Upgrade Design Project
- The upgrade design project involves replacing existing equipment with new or upgraded equipment that supports high-split signals.
Upgrading Existing Networks
- The intent when upgrading existing networks is to support high-split signals and ensure a successful rollout of the High-Split initiative.
'As-Built' Map Purpose
- Creating an 'As-Built' map is necessary to document the existing network infrastructure and layout after the upgrade.
Priority when Upgrading Active Devices
- The priority when upgrading active devices is to ensure that they can support 1218/258/204/5MHz signals.
Significance of Walkout Information
- The walkout information collected prior to upgrading high-split projects is significant because it ensures accurate planning and design of the upgrade.
Importance of Upholding Standards
- Upholding the standards set forth in the document is crucial for a successful rollout of the High-Split initiative.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Test your knowledge about surveying equipment in a Node (Map Area) and determining the predominant equipment manufacturers in that specific area.