What is the maximum length permitted for a dead-end in corridors and exterior exit balconies?

  • 6.50 meters (correct)
  • 5.00 meters
  • 7.00 meters
  • 8.00 meters
  • In what type of buildings does the requirement for one-hour fire-resistive construction not apply to exterior exit balconies, railings, and corridors?

  • Group B Occupancy
  • High-rise buildings
  • Group A Occupancy
  • Group E and F Occupancy occupied by one tenant only (correct)
  • What is the maximum thickness of fixed wire glass allowed for interior openings in corridor walls?

  • 5 millimeters
  • 7 millimeters (correct)
  • 15 millimeters
  • 10 millimeters
  • What is the maximum percentage of the area of an interior corridor wall that all openings, other than doors, can occupy?

    <p>25%</p> Signup and view all the answers

    For stairways serving an occupant load of more than 50, what should be the minimum width according to the text?

    <p>1.10 meters</p> Signup and view all the answers

    What type of buildings are exempt from the requirement related to exterior exit balconies projecting into areas where protected openings are required?

    <p>One-storey buildings housing a Group E and F Occupancy occupied by one tenant only</p> Signup and view all the answers

    How far can foundations encroach into public sidewalk areas?

    <p>Up to 500 millimeters, given that the top is at least 600 millimeters below the established grade</p> Signup and view all the answers

    What must be done if a foundation's projection obstructs existing utilities?

    <p>The owner must pay the entities for the rerouting of the affected utilities</p> Signup and view all the answers

    How much clearance should there be between the lowest part of a balcony and the established street grade?

    <p>At least 3.00 meters</p> Signup and view all the answers

    What is required to construct arcades on sidewalks of streets?

    <p>Compliance with existing building and zoning regulations</p> Signup and view all the answers

    What is a canopy or marquee according to the text?

    <p>A roofed structure above a door projecting over a wall or sidewalk</p> Signup and view all the answers

    In Section 1003, what is required regarding the extent of any projection over an alley or street?

    <p>Uniformity within a block and compliance with Table 1003-A</p> Signup and view all the answers

    What is the requirement for the fire resistance of exterior walls?

    <p>They must have both fire resistance and opening protection as per the Secretary's requirements</p> Signup and view all the answers

    What is the maximum distance projections can extend beyond the exterior wall?

    <p>One-third the distance from a vertical plane located where fire-resistive protection of openings is first required</p> Signup and view all the answers

    What is the maximum percentage of the total area of a storey that can be occupied by openings in exterior walls?

    <p>50 percent</p> Signup and view all the answers

    How should the distance to the property line be measured?

    <p>At a right angle from the property line</p> Signup and view all the answers

    How are the required wall and opening protection determined for buildings on the same property and court walls?

    <p>They are assumed to have a property line between them</p> Signup and view all the answers

    What type of assembly building falls under Division 1 of Group H?

    <p>A building with a stage and an occupant load of less than 1000</p> Signup and view all the answers

    What type of assembly building falls under Division 4 of Group H?

    <p>Stadia, reviewing stands, and amusement park structures</p> Signup and view all the answers

    What is the occupant load requirement for a building to be classified as Group I?

    <p>An occupant load of 1000 or more</p> Signup and view all the answers

    What type of structure falls under Division 2 of Group J?

    <p>Fences over 1.80 meters high, tanks, and towers</p> Signup and view all the answers

    What group does a private garage fall under?

    <p>Group J - Division 1</p> Signup and view all the answers

    According to the code, what should be done with any other occupancy not mentioned specifically in this Section?

    <p>It should be included in the Group which it most nearly resembles based on the existing or proposed life and fire hazard</p> Signup and view all the answers

    What is the primary responsibility of a Building Official in their territorial jurisdiction?

    <p>Enforcing the provisions of the National Building Code and its regulations</p> Signup and view all the answers

    What qualifications must a person possess to be appointed as a Building Official?

    <p>A Filipino citizen with at least five years of diversified and professional experience in building design and construction</p> Signup and view all the answers

    What is the duration of a Building Official's designation made by the Secretary?

    <p>Until regular positions of Building Official are provided</p> Signup and view all the answers

    What is the role of a Building Official regarding building permits?

    <p>Issuing building permits and inspecting buildings for compliance</p> Signup and view all the answers

    What can a Building Official do in the performance of their duties?

    <p>Enter any building or its premises at all reasonable times to inspect and determine compliance with building codes and permit conditions</p> Signup and view all the answers

    Who is a Building Official in the context of the National Building Code?

    <p>A government official responsible for enforcing the Code and issuing building permits</p> Signup and view all the answers