Mining Claim Compliance Quiz

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

What is the term of the lease that may be granted covering the area explored and drilled?

  • 15 years
  • 5 years (correct)
  • 20 years
  • 10 years

What is the maximum surcharge allowed on the total expenses incurred by the Bureau of Mines?

  • 12% (correct)
  • 15%
  • 10%
  • 8%

What does the declaration of location contain a proviso for?

  • Prohibiting exploration work within the area
  • Requiring the mining claims to be recorded with the Bureau of Mines
  • Recognizing the authority of the Director or their representative to enter the mining claims (correct)
  • Granting exclusive rights to the mining claims

What does a land grant to provinces, districts or municipalities not include?

<p>Mineral resources (C)</p> Signup and view all the answers

What is required for the transfer, assignment or sublease of a mining lease contract or any interest therein?

<p>Both b and c (A)</p> Signup and view all the answers

What must the transfer or assignment of a mining lease contract be registered with?

<p>The office of the mining recorder concerned (A)</p> Signup and view all the answers

Who is responsible for marking the corners of mining claims with permanent monuments?

<p>The geodetic engineer (D)</p> Signup and view all the answers

What is the time period for a geodetic engineer to submit the survey returns to the Director?

<p>1 year (D)</p> Signup and view all the answers

What is a valid reason for extending the time period for submitting survey returns?

<p>Reasons of force majeure (D)</p> Signup and view all the answers

What is the consequence of failing to submit the survey returns within the specified time period?

<p>The surveyor's surety bond and/or survey order may be canceled (D)</p> Signup and view all the answers

Who is responsible for issuing rules and regulations governing the manner of execution and verification of mining claim surveys?

<p>The Director (D)</p> Signup and view all the answers

Who is responsible for covering the expenses of the mining claim survey?

<p>The applicant (A)</p> Signup and view all the answers

What is the consequence of a claim owner failing to submit proof of compliance with annual work obligations for two consecutive years?

<p>Automatic abandonment of the mining claim (C)</p> Signup and view all the answers

When should the application for surveying a mining claim for lease purposes be filed?

<p>Within one year from the recording date of the claim (D)</p> Signup and view all the answers

Who is authorized to perform surveys of mining claims for lease, patent, or permit purposes?

<p>A licensed geodetic engineer with prior authority from the Director (A)</p> Signup and view all the answers

What happens if an application for the survey of a mining claim for lease purposes is not filed within one year?

<p>Automatic abandonment of the mining claim (C)</p> Signup and view all the answers

What is required of geodetic engineers before they can perform surveys of mining claims for lease, patent, or permit purposes?

<p>Posting of a bond for faithful execution of the survey (A)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Study Notes

  • Mining leases granted for explored and drilled areas must include stipulations for payment terms, with a maximum surcharge of 12% on total expenses incurred by the Bureau of Mines.
  • Declarations of location for mining claims must recognize the authority of the Director or representative to enter and conduct exploration work on privately located claims if deemed in the country's best interest.
  • Mineral rights are not included in land grants for public purposes like road construction granted to provinces, districts, or municipalities.
  • Approval from the Secretary is required for the transfer, assignment, or sublease of mining lease contracts or interests, ensuring the assignee is qualified and capable of continuing operations.
  • The Director is empowered to issue rules and regulations for executing and verifying surveys of mining claims, with expenses to be covered by the applicant.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

Mining Safety Basics
10 questions

Mining Safety Basics

ThrillingWoodland avatar
ThrillingWoodland
Mining Methods Quiz
10 questions

Mining Methods Quiz

CompactBurgundy avatar
CompactBurgundy
Mining Flashcards
44 questions

Mining Flashcards

AttentiveRococo avatar
AttentiveRococo
Mining Equipment and Technology Quiz
16 questions
Use Quizgecko on...
Browser
Browser