Medical Device Maintenance and Inspection

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary reason for returning an entire load for re-processing?

  • A small percentage of RMD in the load were not cleaned and/or dried effectively. (correct)
  • All items in the load were not processed in a WD.
  • The load was not properly documented.
  • There is visible soil or staining on all items in the load.

What is the purpose of manually inspecting devices under magnification?

  • To verify the completion of device sets.
  • To detect small pieces of bioburden or debris. (correct)
  • To ensure all devices are properly disassembled.
  • To check for corrosion and breakage.

What is the primary purpose of function testing devices?

  • To check for damage or malfunction. (correct)
  • To verify the cleanliness of devices.
  • To ensure all devices are properly disassembled.
  • To confirm the completion of device sets.

What is the purpose of a diathermy pin point tester in inspecting devices?

<p>To ensure the insulation of devices remains intact (D)</p> Signup and view all the answers

What is the primary function of a computerized track and trace system in a CSSD?

<p>To accurately track devices and device trays through the decontamination process (A)</p> Signup and view all the answers

What should be done if a device is damaged or malfunctioning during inspection?

<p>Report the issue to the line manager immediately. (A)</p> Signup and view all the answers

What should be checked on jointed RMD during the inspection process?

<p>The tightness of the screws (C)</p> Signup and view all the answers

What is the purpose of documenting manually cleaned items and non-conformances?

<p>To track the cleaning process for quality control. (B)</p> Signup and view all the answers

What is the result of scanning a barcode label in a computerized track and trace system?

<p>A unique barcode label is generated with a specific serial number (B)</p> Signup and view all the answers

What is the alternative to a computerized track and trace system in a CSSD?

<p>A manual system with a pre-printed tray checklist (D)</p> Signup and view all the answers

What could be the cause of excessive wetness in the load?

<p>Blocked arms (B)</p> Signup and view all the answers

What should be done if a device was not properly disassembled before cleaning?

<p>Return the entire tray for reprocessing (A)</p> Signup and view all the answers

Which issue necessitates the entire load to be returned for re-processing?

<p>Spray arm rotation hindered (D)</p> Signup and view all the answers

What should be checked during the final inspection of the load?

<p>Ensure there's no obvious damage, staining, or residue (B)</p> Signup and view all the answers

What actions should be taken if staining or residue is present after cycle completion?

<p>Send the load back for reprocessing (B)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Related Documents

More Like This

Use Quizgecko on...
Browser
Browser