MATH401: Textile Calculations - Knitting Parameters
30 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the total production in meters per day at 75% efficiency?

  • 3244.82 (correct)
  • 3245.82
  • 3246.82
  • 3244.79
  • What is the total number of shifts required to complete the current order?

  • 38.98
  • 36.98 (correct)
  • 37.98
  • 35.98
  • What is the wage of the machine operators/weavers per shift?

  • Rs. 400/shift (correct)
  • Rs. 350/shift
  • Rs. 450/shift
  • Rs. 300/shift
  • What is the supervisor's wage per day?

    <p>Rs. 769.23</p> Signup and view all the answers

    How many machine operators/weavers are used?

    <p>20</p> Signup and view all the answers

    What is the total number of days required to complete the current order?

    <p>12.33</p> Signup and view all the answers

    What is the formula for calculating Labour Cost?

    <p>Number of labourers × Total working shifts × Wages per shift</p> Signup and view all the answers

    What is the total overhead charge per month?

    <p>Rs. 12,75,000</p> Signup and view all the answers

    What is the total weaving cost?

    <p>Rs. 27,60,000</p> Signup and view all the answers

    What is the weaving cost per metre?

    <p>Rs. 15.36 / metre</p> Signup and view all the answers

    What is the production capacity of a single loom in meters per day at 100% efficiency?

    <p>128.01</p> Signup and view all the answers

    What is the total production of the weaving unit in meters per month?

    <p>1,79,734.82</p> Signup and view all the answers

    What is the cost/pick with 20% profit?

    <p>Rs. 0.00672</p> Signup and view all the answers

    What is the total number of working shifts for machine operators/weavers?

    <p>30 × 3</p> Signup and view all the answers

    What is the total monthly overhead of the company?

    <p>12,25,000</p> Signup and view all the answers

    What is the total wage of the weavers and helpers per shift?

    <p>18,000</p> Signup and view all the answers

    What is the efficiency of the company?

    <p>90%</p> Signup and view all the answers

    How many working hours are there in a day?

    <p>24</p> Signup and view all the answers

    What is the calculation for total production?

    <p>Yarn used - wastage %</p> Signup and view all the answers

    What is the production capacity per shift?

    <p>140 kg</p> Signup and view all the answers

    How many shifts are required to complete the total production?

    <p>7 shifts</p> Signup and view all the answers

    What is the total direct labour cost?

    <p>Rs. 4900</p> Signup and view all the answers

    What is the yarn cost?

    <p>Rs. 200000</p> Signup and view all the answers

    What is the total overhead cost?

    <p>Not given in the text</p> Signup and view all the answers

    What is the primary method of creating an elastic, porous fabric in knitting?

    <p>Interlocking yarns by means of needles</p> Signup and view all the answers

    Which of the following technical parameters is used to determine GSM of knit fabric?

    <p>Courses per Inch (CPI) and Wales per Inch (WPI)</p> Signup and view all the answers

    What is the definition of Wales per Inch (WPI)?

    <p>The total numbers of wales in one inch of linear fabric</p> Signup and view all the answers

    What is the significance of Stitch Length (l) in knitting?

    <p>It engineers the properties of the knitted fabric</p> Signup and view all the answers

    What is the difference between weft and warp knitted fabric?

    <p>Weft knitted fabric has a different loop structure than warp knitted fabric</p> Signup and view all the answers

    What is the unit of measurement for Courses per Inch (CPI)?

    <p>Number of courses per linear inch</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser