Podcast
Questions and Answers
What is the total production in meters per day at 75% efficiency?
What is the total production in meters per day at 75% efficiency?
- 3244.82 (correct)
- 3245.82
- 3246.82
- 3244.79
What is the total number of shifts required to complete the current order?
What is the total number of shifts required to complete the current order?
- 38.98
- 36.98 (correct)
- 37.98
- 35.98
What is the wage of the machine operators/weavers per shift?
What is the wage of the machine operators/weavers per shift?
- Rs. 400/shift (correct)
- Rs. 350/shift
- Rs. 450/shift
- Rs. 300/shift
What is the supervisor's wage per day?
What is the supervisor's wage per day?
How many machine operators/weavers are used?
How many machine operators/weavers are used?
What is the total number of days required to complete the current order?
What is the total number of days required to complete the current order?
What is the formula for calculating Labour Cost?
What is the formula for calculating Labour Cost?
What is the total overhead charge per month?
What is the total overhead charge per month?
What is the total weaving cost?
What is the total weaving cost?
What is the weaving cost per metre?
What is the weaving cost per metre?
What is the production capacity of a single loom in meters per day at 100% efficiency?
What is the production capacity of a single loom in meters per day at 100% efficiency?
What is the total production of the weaving unit in meters per month?
What is the total production of the weaving unit in meters per month?
What is the cost/pick with 20% profit?
What is the cost/pick with 20% profit?
What is the total number of working shifts for machine operators/weavers?
What is the total number of working shifts for machine operators/weavers?
What is the total monthly overhead of the company?
What is the total monthly overhead of the company?
What is the total wage of the weavers and helpers per shift?
What is the total wage of the weavers and helpers per shift?
What is the efficiency of the company?
What is the efficiency of the company?
How many working hours are there in a day?
How many working hours are there in a day?
What is the calculation for total production?
What is the calculation for total production?
What is the production capacity per shift?
What is the production capacity per shift?
How many shifts are required to complete the total production?
How many shifts are required to complete the total production?
What is the total direct labour cost?
What is the total direct labour cost?
What is the yarn cost?
What is the yarn cost?
What is the total overhead cost?
What is the total overhead cost?
What is the primary method of creating an elastic, porous fabric in knitting?
What is the primary method of creating an elastic, porous fabric in knitting?
Which of the following technical parameters is used to determine GSM of knit fabric?
Which of the following technical parameters is used to determine GSM of knit fabric?
What is the definition of Wales per Inch (WPI)?
What is the definition of Wales per Inch (WPI)?
What is the significance of Stitch Length (l) in knitting?
What is the significance of Stitch Length (l) in knitting?
What is the difference between weft and warp knitted fabric?
What is the difference between weft and warp knitted fabric?
What is the unit of measurement for Courses per Inch (CPI)?
What is the unit of measurement for Courses per Inch (CPI)?
Flashcards are hidden until you start studying