MATH401: Textile Calculations - Knitting Parameters

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the total production in meters per day at 75% efficiency?

  • 3244.82 (correct)
  • 3245.82
  • 3246.82
  • 3244.79

What is the total number of shifts required to complete the current order?

  • 38.98
  • 36.98 (correct)
  • 37.98
  • 35.98

What is the wage of the machine operators/weavers per shift?

  • Rs. 400/shift (correct)
  • Rs. 350/shift
  • Rs. 450/shift
  • Rs. 300/shift

What is the supervisor's wage per day?

<p>Rs. 769.23 (A)</p> Signup and view all the answers

How many machine operators/weavers are used?

<p>20 (B)</p> Signup and view all the answers

What is the total number of days required to complete the current order?

<p>12.33 (C)</p> Signup and view all the answers

What is the formula for calculating Labour Cost?

<p>Number of labourers × Total working shifts × Wages per shift (C)</p> Signup and view all the answers

What is the total overhead charge per month?

<p>Rs. 12,75,000 (A)</p> Signup and view all the answers

What is the total weaving cost?

<p>Rs. 27,60,000 (D)</p> Signup and view all the answers

What is the weaving cost per metre?

<p>Rs. 15.36 / metre (A)</p> Signup and view all the answers

What is the production capacity of a single loom in meters per day at 100% efficiency?

<p>128.01 (A)</p> Signup and view all the answers

What is the total production of the weaving unit in meters per month?

<p>1,79,734.82 (A)</p> Signup and view all the answers

What is the cost/pick with 20% profit?

<p>Rs. 0.00672 (D)</p> Signup and view all the answers

What is the total number of working shifts for machine operators/weavers?

<p>30 × 3 (D)</p> Signup and view all the answers

What is the total monthly overhead of the company?

<p>12,25,000 (A)</p> Signup and view all the answers

What is the total wage of the weavers and helpers per shift?

<p>18,000 (C)</p> Signup and view all the answers

What is the efficiency of the company?

<p>90% (A)</p> Signup and view all the answers

How many working hours are there in a day?

<p>24 (C)</p> Signup and view all the answers

What is the calculation for total production?

<p>Yarn used - wastage % (A)</p> Signup and view all the answers

What is the production capacity per shift?

<p>140 kg (A)</p> Signup and view all the answers

How many shifts are required to complete the total production?

<p>7 shifts (A)</p> Signup and view all the answers

What is the total direct labour cost?

<p>Rs. 4900 (D)</p> Signup and view all the answers

What is the yarn cost?

<p>Rs. 200000 (A)</p> Signup and view all the answers

What is the total overhead cost?

<p>Not given in the text (C)</p> Signup and view all the answers

What is the primary method of creating an elastic, porous fabric in knitting?

<p>Interlocking yarns by means of needles (B)</p> Signup and view all the answers

Which of the following technical parameters is used to determine GSM of knit fabric?

<p>Courses per Inch (CPI) and Wales per Inch (WPI) (C)</p> Signup and view all the answers

What is the definition of Wales per Inch (WPI)?

<p>The total numbers of wales in one inch of linear fabric (C)</p> Signup and view all the answers

What is the significance of Stitch Length (l) in knitting?

<p>It engineers the properties of the knitted fabric (D)</p> Signup and view all the answers

What is the difference between weft and warp knitted fabric?

<p>Weft knitted fabric has a different loop structure than warp knitted fabric (B)</p> Signup and view all the answers

What is the unit of measurement for Courses per Inch (CPI)?

<p>Number of courses per linear inch (D)</p> Signup and view all the answers

Flashcards are hidden until you start studying

More Like This

Use Quizgecko on...
Browser
Browser