According to the guidelines, what should be the depth of the pit in relation to the tool diameter?
According to the guidelines, what should be the depth of the pit in relation to the tool diameter?
- The depth of the pit should be 5 times the tool diameter.
- The depth of the pit should be 10 times the tool diameter. (correct)
- The depth of the pit should be equal to the tool diameter.
- The depth of the pit should be half the tool diameter.
What should you do to prevent the service line from twisting during operation?
What should you do to prevent the service line from twisting during operation?
- Lube the tool with oil.
- Connect the hoses to the oiler.
- Uncoil the hoses. (correct)
- Coil the hoses tightly.
How much Hammerhead Mole oil should be used to pre-lube the tool after a long storage period?
How much Hammerhead Mole oil should be used to pre-lube the tool after a long storage period?
- Half an ounce of oil is needed for pre-lubing the tool. (correct)
- No oil is needed for pre-lubing the tool.
- One ounce of oil is needed for pre-lubing the tool.
- Three to five ounces of oil is needed for pre-lubing the tool.
What should you do after connecting all the hoses?
What should you do after connecting all the hoses?
What should you be careful not to lose when partially opening the Euler valve?
What should you be careful not to lose when partially opening the Euler valve?
What is the recommended depth of the pit in relation to the tool diameter?
What is the recommended depth of the pit in relation to the tool diameter?
What should be done to the hoses to prevent the service line from twisting during operation?
What should be done to the hoses to prevent the service line from twisting during operation?
How much Hammerhead Mole oil should be used to pre-lube the tool after a long storage period?
How much Hammerhead Mole oil should be used to pre-lube the tool after a long storage period?
How much Hammerhead Mole oil should be used to pre-lube the tool supply hose?
How much Hammerhead Mole oil should be used to pre-lube the tool supply hose?
What should be done after all connections are made?
What should be done after all connections are made?
According to the guidelines, what is the recommended depth of the pit in relation to the tool diameter?
According to the guidelines, what is the recommended depth of the pit in relation to the tool diameter?
What should be done to the hoses to prevent the service line from twisting during operation?
What should be done to the hoses to prevent the service line from twisting during operation?
How much Hammerhead Mole oil should be used to pre-lube the tool after a long storage period?
How much Hammerhead Mole oil should be used to pre-lube the tool after a long storage period?
What should be done after all connections are made?
What should be done after all connections are made?
What should you be careful not to lose when partially opening the Euler valve?
What should you be careful not to lose when partially opening the Euler valve?
Which tool should be used to undo the bond clamp and remove the drop?
Which tool should be used to undo the bond clamp and remove the drop?
What should be done after removing the drop?
What should be done after removing the drop?
What should be done with the old smoke tube?
What should be done with the old smoke tube?
What should be done to secure the smoke tube in place?
What should be done to secure the smoke tube in place?
What is the purpose of running the new drop through the old smoke tube?
What is the purpose of running the new drop through the old smoke tube?
Study Notes
Pre-Operation Checks
- The recommended depth of the pit should be 3-4 times the tool diameter.
- To prevent the service line from twisting during operation, the hoses should be twisted in a clockwise direction.
Tool Maintenance
- After a long storage period, 1-2 ounces of Hammerhead Mole oil should be used to pre-lube the tool.
- The tool supply hose should also be pre-lubed with 1-2 ounces of Hammerhead Mole oil.
Connection and Setup
- After all connections are made, the system should be pressure-tested.
- When partially opening the Euler valve, be careful not to lose the valve stem.
Drop Removal and Installation
- A wrench should be used to undo the bond clamp and remove the drop.
- After removing the drop, the old smoke tube should be disposed of.
- To secure the smoke tube in place, the new drop should be run through the old smoke tube.
- The purpose of running the new drop through the old smoke tube is to ensure proper installation and securement.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Test your knowledge on operational guidelines for using hammerhead mole pneumatic piercing tools. Learn how to create compact holes for underground installations and keep your project on target. Topics include pit depth, preventing kinking, and hose uncoiling.