2.3.7 Construction Documents - Drawing

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

Who are the primary users of drawings in the construction industry?

  • Product manufacturers and suppliers
  • Architects (correct)
  • Authorities Having Jurisdiction
  • Facility managers and maintenance personnel

What is the role of working drawings for bidders in the construction industry?

  • To review the work on site
  • To prepare bids (correct)
  • To communicate project particulars to clients
  • To obtain bids from sub-contractors and suppliers

Who is usually responsible for planning the production of working drawings in a construction project?

  • The project architect (correct)
  • The sub-contractors
  • The client or owner
  • The contractor

What should the project architect do at the start of the construction documents phase?

<p>Meet with the entire consultant team (A)</p> Signup and view all the answers

Which of the following is NOT a benefit of switching from 2D CAD to BIM?

<p>Reduced time and financial investment (B)</p> Signup and view all the answers

Which organization has created their own drawing standards?

<p>Public Works and Government Services Canada (PWGSC) (C)</p> Signup and view all the answers

What is the primary method for producing working drawings?

<p>Computer-Aided Drawing (CAD) (C)</p> Signup and view all the answers

What does BIM stand for?

<p>Building Information Modeling (B)</p> Signup and view all the answers

Which of the following is NOT necessary when preparing working drawings?

<p>Determining the scale for each working drawing (C)</p> Signup and view all the answers

What is the purpose of a title block on a drawing?

<p>To provide contact information of the architect (B)</p> Signup and view all the answers

Where should notes, symbols, and dimensions be expressed on the drawings?

<p>On the elevations (C)</p> Signup and view all the answers

What is the purpose of using standard symbols on the plans?

<p>To show structural grids (B)</p> Signup and view all the answers

Which of the following is true about working drawings?

<p>Working drawings are also known as construction documents. (B)</p> Signup and view all the answers

What is the purpose of drawings in construction?

<p>Drawings are used to guide the contractor and sub-contractors in the preparation of their price or bid. (B)</p> Signup and view all the answers

When should client approval of the design development documents be obtained?

<p>Client approval should be obtained before the working drawings are prepared. (A)</p> Signup and view all the answers

How can changes requested during the preparation of working drawings affect the project?

<p>Changes can cause delays and additional costs. (C)</p> Signup and view all the answers

Which of the following is the purpose of using schedules in architectural drawings?

<p>To simplify and clarify repetitive information (A)</p> Signup and view all the answers

What do elevations and vertical sections indicate in architectural drawings?

<p>The height of buildings (D)</p> Signup and view all the answers

What is the purpose of including all plans, elevations, sections, and details in architectural drawings?

<p>To carry out the work (B)</p> Signup and view all the answers

How should drawings identify a material or product in architectural drawings?

<p>By using a generic name (D)</p> Signup and view all the answers

What is the method of dimensioning in architectural drawings based on?

<p>The sequence of construc (D)</p> Signup and view all the answers

Which of the following is NOT a potential benefit of using BIM software in architectural practice?

<p>Ability to export BIM models to common two-dimensional drawing formats (C)</p> Signup and view all the answers

What are some challenges that the profession faces when using Building Information Modeling (BIM)?

<p>All of the above (D)</p> Signup and view all the answers

In what situations may working drawings need to be more detailed?

<p>Projects involving restoration, renovation, or addition to an existing building (A)</p> Signup and view all the answers

What is the purpose of the final set of working drawings and the Project Manual?

<p>All of the above (D)</p> Signup and view all the answers

True or false: Including too many notes in drawings can help to simplify and clarify repetitive information.

<p>False (B)</p> Signup and view all the answers

True or false: Drawings should only provide a generic name for materials or products, and should not include specific dimensions.

<p>True (A)</p> Signup and view all the answers

True or false: Plans indicate the height of buildings, while elevations and vertical sections indicate the length and width.

<p>False (B)</p> Signup and view all the answers

True or false: The method of dimensioning in architectural drawings should correspond to the sequence of construction.

<p>True (A)</p> Signup and view all the answers

True or false: Schedules, such as room finish and door schedules, should be used to identify the material or components of repetitive items.

<p>True (A)</p> Signup and view all the answers