Master Project Scheduling Techniques
10 Questions
2 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

______ is a project scheduling technique used to break down the project into a series of tasks, estimate durations and resources, and link them in a logical way.

PERT/CPM

The objective of scheduling is to establish the beginning, ending, and duration of each activity in the project.

objectives

A ______ is a bar chart that represents the scheduling of factors on the vertical axis and time on the horizontal axis.

Gantt chart

The ______ is the longest path in the network and determines the minimum time required to complete the project.

<p>critical path</p> Signup and view all the answers

Slack time is the amount of time an activity can be delayed without delaying the project.

<p>slack time</p> Signup and view all the answers

Which of the following is an objective of project scheduling?

<p>Calculating the overall completion time of the project</p> Signup and view all the answers

What is the purpose of a Gantt chart?

<p>To visually represent the scheduling of factors over time</p> Signup and view all the answers

Which project scheduling technique breaks down the project into a series of tasks and links them in a logical way?

<p>PERT/CPM</p> Signup and view all the answers

What does the critical path represent in a project network?

<p>The longest path to complete the project</p> Signup and view all the answers

What is slack time in project scheduling?

<p>The amount of time an activity can be delayed without delaying the project</p> Signup and view all the answers

More Like This

Project Scheduling Concepts Quiz
6 questions
Gestion d'échéancier de projet
18 questions
Diagrama de Gantt en Proyectos
5 questions
Use Quizgecko on...
Browser
Browser