Master Production Scheduling - Chapter 6
10 Questions
2 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the fundamental role of the Master Production Schedule (MPS) in a manufacturing planning and control system?

  • To balance supply and demand volume
  • To develop company objectives
  • To manage material requirements planning activities
  • To provide an aggregate statement of manufacturing output (correct)

What is the specific role of the sales and operations plan?

  • To balance supply and demand volume (correct)
  • To specify the mix and volume of the output
  • To develop company objectives
  • To manage material requirements planning activities

What does the MPS provide on a day-to-day basis for coordinating sales and manufacturing?

  • Customer promise dates
  • Aggregate statement of manufacturing output
  • Specific products for manufacturing (correct)
  • Material requirements planning activities

How does the MPS contribute to the coordination of sales and manufacturing?

<p>By providing specific products for manufacturing (C)</p> Signup and view all the answers

What is the translation of the sales and operations plan into producible products with their quantities and timing determined called?

<p>Master Production Schedule (MPS) (B)</p> Signup and view all the answers

What is the main role of master production scheduling in manufacturing planning and control?

<p>To resolve trade-offs between sales and manufacturing (B)</p> Signup and view all the answers

What is a key prerequisite for master production scheduling?

<p>Defining the MPS unit and associated bill of materials (A)</p> Signup and view all the answers

What does the master production schedule provide the basis for?

<p>Making good use of manufacturing resources (A)</p> Signup and view all the answers

What are the basic tasks involved in master production scheduling?

<p>Scheduling and capacity planning (A)</p> Signup and view all the answers

How is the MPS converted into a final build schedule?

<p>By following the bill of materials structuring process (D)</p> Signup and view all the answers

More Like This

Master Production Engineering
7 questions
MRP and MPS Quiz
10 questions

MRP and MPS Quiz

TopNotchSerpentine6760 avatar
TopNotchSerpentine6760
Use Quizgecko on...
Browser
Browser