Master Layout Plan Approval: Documents

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

To whom should one apply for Master Layout Plan approval?

  • Collector / Authority (correct)
  • ADTP / TP
  • JDTP
  • Bank

Which document is required as part of the Master Layout Plan approval application?

  • Aadhar Card
  • Passport
  • Voter ID
  • Attested copy of Gazette Notification (correct)

If a project lacks access from an existing 18.0 m wide road, what documents are needed?

  • Employee IDs
  • Personal financial statements
  • Documents showing ownership of land proposed for the access road (correct)
  • Letters of recommendation

What type of guarantee might be required during the Master Layout Plan approval process?

<p>Bank Guarantee (C)</p> Signup and view all the answers

How many sets of Master Layout Plans are required to be submitted?

<p>Three sets (B)</p> Signup and view all the answers

What kind of map is needed to show the land levels?

<p>Contour map (D)</p> Signup and view all the answers

What type of imagery is required as part of the documentation?

<p>Colored Google Earth image (C)</p> Signup and view all the answers

What should the project proponent receive if the submitted documents are incomplete?

<p>Communication from the Collector/Authority within 10 working days (D)</p> Signup and view all the answers

After receiving the complete proposal, how long does the Collector/Authority have to forward it to JDTP?

<p>10 working days (B)</p> Signup and view all the answers

How long does JDTP have to send its remarks to the Collector/Authority?

<p>2 months (A)</p> Signup and view all the answers

Within what time frame must the Collector/Authority approve or reject the application after receiving the reply from JDTP?

<p>Within 1 month (B)</p> Signup and view all the answers

Who grants approval for the Building Plan under the Master Layout Plan?

<p>ADTP / TP of concern branch or by the Authority (A)</p> Signup and view all the answers

How long does it take to get the Building Plan approved from the receipt of the proposal?

<p>30 days (D)</p> Signup and view all the answers

Which of the following must be included in the application?

<p>Village Map (C)</p> Signup and view all the answers

What else should be present in the application?

<p>Phased Program or development of physical infrastructure with amenities under project along with the project cost details. (D)</p> Signup and view all the answers

Flashcards

Master Layout Plan Approval Application

Apply to the concerned Collector/Authority with necessary documents such as attested copies of Gazette Notification, Letter of Intent, Part Plan of Sanctioned RP/DP, Village Map, ownership documents, Bank Guarantee, Undertaking and Affidavit, Master Layout Plan copies, contour map, Colored Google Earth image/Drone survey Image, and Phased Program of development.

Communication of Incomplete Documents

Within 10 working days, the Collector/Authority will inform the project proponent if the documents are incomplete.

Forwarding to JDTP

After receiving the complete proposal, the Collector/Authority will forward it to the Joint Director Town Planning (JDTP) for technical consultation within 10 working days.

JDTP's Response Time

The JDTP must send its remarks to the Collector/Authority within 2 months.

Signup and view all the flashcards

Final Approval Time

The Collector/Authority must grant approval or reject the application within 1 month from receiving the reply from JDTP.

Signup and view all the flashcards

Building Plan Approval Time

Detailed Building Permission under the Master Layout Plan shall be granted by ADTP/TP of the concerned branch or by the Authority within 30 days from receipt of the proposal.

Signup and view all the flashcards

Study Notes

Master Layout Plan Approval Application to Collector/Authority: Required Documents

  • Attested copy of Gazette Notification needed
  • Attested copy of Letter of Intent required
  • Part Plan of Sanctioned RP/DP necessary
  • Submission of Village Map is a must
  • Documentation showing ownership of land proposed for an 18.0 m wide access road is needed if the project lacks access from an existing road of that width
  • A Bank Guarantee of the requisite amount as prescribed in Regulation No. 14.1.1,12 (i) must be submitted
  • Provide an Undertaking and Affidavit as prescribed by the Collector
  • Three sets of Master Layout Plans, with or without Building Plans are required
  • Include a Contour map showing contour levels of lands under the Master Layout Plan
  • Colored Google Earth image / Drone survey Image etc. should be provided
  • A Phased Program of development of physical infrastructure with amenities, along with project cost details, should be included

Collector/Authority Procedure for Master Layout Plan Approval

  • If documents are incomplete, the Collector/Authority must inform the project proponent within 10 working days
  • After receiving the complete proposal, the Collector/Authority forwards it to the JDTP for technical consultation within 10 working days
  • The JDTP must send its remarks to the Collector/Authority within 2 months

Approval Timeline

  • The Collector/Authority must grant approval or reject the application u/s 18 or 44 within 1 month from the reply from JDTP
  • Approval to Building Plan — Detail Building Permission under the Master Layout Plan shall be granted by ADTP / TP of concern branch or by the Authority within 30 days from the receipt on the proposal.