Management Control in Construction for Quantity Surveyors
10 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary objective of management control in a construction company?

  • To ensure compliance with regulatory requirements
  • To maximize profits
  • To improve communication among stakeholders
  • To monitor and correct deviations from plans (correct)
  • Which of the following is a key component of the management control system in a construction company?

  • Budgeting and forecasting
  • Performance measurement and evaluation (correct)
  • Risk management and mitigation
  • Quality control and assurance
  • What is the role of a quantity surveyor in the management control process of a construction company?

  • To monitor and control costs (correct)
  • To ensure compliance with building codes and regulations
  • To manage the construction schedule
  • To prepare and manage budgets
  • What is the purpose of variance analysis in management control?

    <p>To determine the cause of deviations from plans</p> Signup and view all the answers

    Which of the following is a limitation of management control in a construction company?

    <p>It is a reactive process</p> Signup and view all the answers

    What is the primary focus of cost control in a construction company?

    <p>To minimize project costs and maximize profitability</p> Signup and view all the answers

    Which of the following tools is commonly used in management control to identify and correct deviations from planned costs?

    <p>Earned value management</p> Signup and view all the answers

    What is the primary benefit of implementing a management control system in a construction company?

    <p>Better decision-making through data-driven insights</p> Signup and view all the answers

    Which of the following is a common challenge faced by construction companies in implementing effective cost control measures?

    <p>All of the above</p> Signup and view all the answers

    What is the role of a head quantity surveyor in ensuring effective cost control in a construction company?

    <p>To provide expert advice on cost management strategies</p> Signup and view all the answers

    Study Notes

    Management Control in Construction Company

    • The primary objective of management control in a construction company is to ensure that the project is completed within the predetermined constraints of time, cost, and quality.

    Components of Management Control System

    • A key component of the management control system in a construction company is the establishment of standards and benchmarks for performance measurement.

    Role of Quantity Surveyor

    • The role of a quantity surveyor in the management control process of a construction company is to monitor and control the cost of the project by measuring and valuing the work done.

    Variance Analysis

    • The purpose of variance analysis in management control is to identify the differences between the planned and actual performance, and take corrective actions to minimize the deviations.

    Limitations of Management Control

    • One of the limitations of management control in a construction company is that it may not be able to control external factors such as weather conditions, changes in government regulations, or unexpected site conditions.

    Test Purpose

    • Evaluating knowledge of management control and cost control in a construction company

    Test Administration

    • Conducted by a head quantity surveyor

    Test Focus

    • Management control of a construction company
    • Cost control of a construction company

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on the management control system in a construction company, including its objectives, components, and the role of a quantity surveyor. Learn about variance analysis and limitations of management control.