Load Lines Convention (LL, 1966)
21 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary purpose of assigning a load line and freeboards to a vessel?

  • To maximize cargo capacity by reducing the amount of ballast required.
  • To ensure the vessel always travels at its maximum possible speed.
  • To minimize the vessel's draft for navigating shallow waters, regardless of the load.
  • To provide adequate reserve buoyancy against accidental flooding and ensure crew safety and movement. (correct)

Which statement accurately describes the difference between 'weathertight' and 'watertight' integrity?

  • Weathertight integrity prevents leakage under any pressure, while watertight integrity only prevents leakage from splashes.
  • Weathertight and watertight are synonymous terms used interchangeably in maritime engineering.
  • Watertight integrity is relevant only for doors above the waterline, while weathertight integrity applies to those below.
  • Watertight integrity prevents leakage under a specific head of water pressure, while weathertight integrity prevents leakage from spray. (correct)

A ship compartment is fitted with a door that must prevent water ingress during a flooding event up to the main deck level. Which type of door is most suitable for this?

  • A fire-resistant door.
  • A watertight door. (correct)
  • A weathertight door.
  • A standard interior door.

Where are weathertight doors typically located on a ship, and what conditions are they designed to withstand?

<p>Above the waterline, withstanding strong spray and weather conditions. (B)</p> Signup and view all the answers

Why is sufficient subdivision within the hull of a vessel important in the context of buoyancy and safety?

<p>It ensures reserve buoyancy is sufficient to counteract the effect of flooding in one compartment. (D)</p> Signup and view all the answers

What immediate action should be prioritized after a ship loses propulsion during a storm, according to the provided information?

<p>Attempt to restore propulsion to regain control. (A)</p> Signup and view all the answers

What is the primary purpose of the Load Line mark on a ship?

<p>To prevent a ship from loading cargo beyond its safe capacity. (C)</p> Signup and view all the answers

How did the advent of steel ships and powered propulsion influence the Load Line regulations?

<p>It led to the development of more elaborate rules addressing flooding and damage control. (C)</p> Signup and view all the answers

What concept was the First International Convention on Load Lines (1930) based on?

<p>Reserve buoyancy (C)</p> Signup and view all the answers

Why was the introduction of Load Line regulations considered important?

<p>To contribute significantly to the safety of ships by limiting draught/draft. (C)</p> Signup and view all the answers

What role did Lord Plimsoll play in the history of Load Line regulations?

<p>He was a British Parliamentarian who introduced and advocated for the Load Line Act. (C)</p> Signup and view all the answers

What is the relationship between freeboard and the Load Line?

<p>Freeboard is the distance between the Load Line and the upper deck, indicating reserve buoyancy. (C)</p> Signup and view all the answers

How have Load Line regulations evolved over time regarding different types of ships?

<p>Separate tables of Freeboards based on the ship's length existed for both dry cargo ships and tankers. (C)</p> Signup and view all the answers

What primary factor does the Load Line Certificate confirm about a vessel?

<p>The vessel's adherence to the Load Line Convention regulations. (B)</p> Signup and view all the answers

What is the significance of Annex II within the 1966 Load Line Convention?

<p>It defines the geographical zones, areas, and seasonal periods that influence load line assignments. (D)</p> Signup and view all the answers

A cargo ship is being loaded in a port located in a seasonal zone. How does Annex II of the Load Line Convention influence the loading process?

<p>By adjusting the permissible draft of the vessel based on the seasonal period. (A)</p> Signup and view all the answers

Under the 1966 Load Line Convention, which factor is NOT considered when calculating the minimum freeboard of a ship?

<p>The ship's flag state. (C)</p> Signup and view all the answers

A bulk carrier is operating in an area designated as a 'winter seasonal zone' according to Annex II of the Load Line Convention. What specific operational adjustment might the ship need to make compared to operating in a 'summer zone'?

<p>Reduce the maximum cargo load to comply with the winter load line. (A)</p> Signup and view all the answers

Chapter IV of Annex I in the 1966 Load Line Convention outlines special requirements for which type of ships?

<p>Ships assigned timber freeboards. (B)</p> Signup and view all the answers

A general cargo ship is intending to carry timber as a deck cargo. How does Chapter IV of Annex I in the 1966 Load Line Convention affect the ship's operation?

<p>It requires the ship to undergo a stability analysis to ensure the safe carriage of timber. (B)</p> Signup and view all the answers

What is the primary function of the 'Conditions of Assignment' as detailed in Chapter II of Annex I within the 1966 Load Line Convention?

<p>To establish the criteria for determining a ship's eligibility to be assigned a load line. (C)</p> Signup and view all the answers

Flashcards

Load Lines

Limitations on how much a ship can be loaded, affecting its safety.

Freeboard

The height of the ship's side above the waterline.

Plimsoll Mark

A mark on a ship indicating the maximum extent to which the ship may be loaded in various conditions.

Freeboard Table

A table showing allowable freeboards based on ship length.

Signup and view all the flashcards

Weathertight and Watertight Integrity

Ensuring external parts of the ship are sealed against weather and water.

Signup and view all the flashcards

Reserve Buoyancy

Capacity of a ship to remain afloat even if partially flooded.

Signup and view all the flashcards

Hull Stress Avoidance

Avoid excessive stress on the hull due to overloading.

Signup and view all the flashcards

Two Separate Tables of Freeboards

Rules that apply to both dry cargo ships and tankers, with separate tables of Freeboards based on length of ship

Signup and view all the flashcards

1966 Load Line Convention

First International Load Line Convention after IMO's creation.

Signup and view all the flashcards

Purpose of Load Line Convention

Determines ship freeboard considering subdivision, damage stability, and varying zone hazards.

Signup and view all the flashcards

Chapter I of Annex I

Sets out general rules.

Signup and view all the flashcards

Chapter II of Annex I

Details freeboard assignment conditions.

Signup and view all the flashcards

Chapter III of Annex I

Details the specifics of freeboards

Signup and view all the flashcards

Chapter IV of Annex I

Addresses rules for ships carrying timber on deck

Signup and view all the flashcards

Load Line Certificate

Certifies vessel compliance with the Load Line Convention.

Signup and view all the flashcards

Buoyancy

Buoyant volume below the waterline

Signup and view all the flashcards

Sufficient Subdivision

A vessel has sufficient internal compartments to maintain buoyancy even if some compartments are flooded.

Signup and view all the flashcards

Watertight

Prevents water leakage from a closed opening even under water pressure allowing to withstand water pressure from both sides.

Signup and view all the flashcards

Weathertight

Prevents water leakage from a closed opening when exposed to spray.

Signup and view all the flashcards

Watertight Doors

Doors on ships designed to prevent water from passing between compartments during flooding.

Signup and view all the flashcards

Study Notes

  • Lecture 10 provides an overview of load lines and related conventions.
  • The Costa Concordia, an Italian cruise ship, struck rocks near a Tuscan island off the Italian coast in the Mediterranean; there were over 4200 people aboard.
  • On January 26, 2016, the Modern Express, a car carrier, started listing when it lost propulsion and turned broadside to the storm en-route to Le Harve, France.

Convention on Load Lines (LL, 1966)

  • The Convention on Load Lines (LL, 1966) is a key focus.
  • Limitations on the draught/draft to which a ship may be loaded make a significant contribution to her safety.
  • These limits are given in the form of freeboards, besides external weathertight and watertight integrity/strength.
  • The Load Line mark includes a circle with a diametrical line cut across the circle known as the Plimsoll Mark.
  • Ships are allowed to load until this line reaches the waterline to prevent overloading.
  • To determine this line, one refers to a table of Freeboards against length of ship to determine the allowable Freeboard.

History of Load Line Regulations

  • The regulations have a history of over 140 years; introduced in 1854 by British Parliamentarian Lord Plimsoll.
  • In 1876, passed as the first merchant shipping Act, requiring all Merchant ships to have a Load line marked on the ship side at the mid-ship length.
  • With steel ships and powered propulsion, the regulations have evolved covering all known aspects of flooding and damage control.
  • The Load line regulations also applied to dry cargo ships and tankers.
  • The first International Convention on Load Lines, adopted in 1930, was based on the principle of reserve buoyancy.
  • Although it was recognized then that the freeboard should also ensure adequate stability and avoid excessive stress on the ship's hull as a result of overloading.
  • The 1930 Load line regulations came into force after the development of steel ships powered by steam or I.C. engines.

Establishment of L/L by IMO

  • The 1966 Load Line Convention is the first International Load Line Convention after IMO (IMCO) came into existence.
  • The Convention was held from March 3 to April 5, 1966.
  • The L/L Regulations being the outcome of this Convention was adopted on April 5, 1966.
  • Adoption date was April 5 1966.
  • Entry into force date was July 21 1968.
  • The 1966 Load Lines convention, provisions are made for determining the freeboard of ships by subdivision and damage stability calculations.
  • The regulations consider potential hazards in different zones and seasons.

Load Line Convention

  • Consists of 34 articles, and 3 Annexes.
  • Annex I is divided into four Chapters: General, Conditions of assignment of freeboard, Freeboards, and Special requirements for ships assigned timber freeboards.
  • Annex II covers Zones, areas, and seasonal periods.
  • Annex III contains certificates, including the International Load Line Certificate.

Regulations in LL66 based on Chapter:

  • Chapter 1: General (Regulations 1-9)
  • Chapter 2: Conditions of Assignment (Regulations 10-26)
  • Chapter 3: Freeboards (Regulations 27-40)
  • Chapter 4: Special Requirements for Ships Assigned Timber Freeboards (Regulations 41-45)
  • Annex 2: Zones, Areas, and Seasonal Periods

Load Line Certificates

  • Load line certificate certifies that vessel complies with the loadline convention.
  • Minimum freeboard, as required by the loadline convention, is calculated considering factors like reserve buoyancy.
  • The Loadline convention is applied to ships of more than 24 meters in length.

Buoyancy

  • The portion of the buoyant volume below the waterline.

Reserve Buoyancy

  • The portion of the buoyant volume above the waterline

Objectives of Assigning a Load Line With Freeboards:

  • Providing adequate reserve buoyancy against accidental flooding.
  • Ensuring comfortable and safe crew accommodation.
  • Maintaining weather-tight integrity of the freeboard or main deck.
  • Providing sufficient hull subdivision for adequate reserve buoyancy.
  • Assuring adequate strength to the vessels.

Relevant definitions:

  • Watertight: Prevents water leakage from a closed opening when subjected to a predetermined head of water.
  • Weathertight: Prevents water leakage from a closed opening when subjected to a strong spray of water.
  • Watertight condition is stronger than weathertight.
  • Watertight doors prevent water from entering from one compartment to another during flooding or accidents.
  • Weathertight doors are located above the waterline and can handle weather conditions.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

Description

Overview of the International Convention on Load Lines (LL, 1966). It focuses on limitations on the draught to which a ship may be loaded. The load line mark includes the Plimsoll Mark.

More Like This

Use Quizgecko on...
Browser
Browser