Lean-Sigma Introduction to Define Phase

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary purpose of the Lean-Sigma methodology?

  • To improve quality and reduce defects (correct)
  • To maximize profit and minimize costs
  • To train employees on various management techniques
  • To streamline production processes

Which of the following is NOT a key phase in the Lean-Sigma DMAIC methodology?

  • Define
  • Implement (correct)
  • Measure
  • Analyze

What is the purpose of a SIPOC diagram in Lean-Sigma?

  • To prioritize the critical to quality (CTQ) characteristics
  • To identify the key inputs and outputs of a process (correct)
  • To develop an implementation plan for improvements
  • To analyze the root causes of a problem

Which of the following is a key principle of Lean-Sigma?

<p>Eliminate waste and non-value-added activities (C)</p> Signup and view all the answers

What is the purpose of the Define phase in the Lean-Sigma DMAIC methodology?

<p>To clearly define the problem statement, scope, and goals of the project (B)</p> Signup and view all the answers

Which of the following is a key tool used in the Measure phase of Lean-Sigma?

<p>Process capability analysis (D)</p> Signup and view all the answers

What is the main purpose of the Safran Lean-Sigma Facilitator training?

<p>To train participants to become certified Lean-Sigma facilitators within Safran (D)</p> Signup and view all the answers

What is the purpose of the 'Define' phase in the Lean-Sigma methodology?

<p>To define the problem statement and scope of the Lean-Sigma project (C)</p> Signup and view all the answers

Which of the following is NOT a key component of the SIPOC (Suppliers, Inputs, Process, Outputs, Customers) tool used in Lean-Sigma?

<p>Metrics (D)</p> Signup and view all the answers

What is the purpose of the 'CTQ Tree' (Critical to Quality Tree) tool used in Lean-Sigma?

<p>To prioritize the critical requirements of a product or service from the customer's perspective (C)</p> Signup and view all the answers

Which of the following is a key principle of the Lean methodology?

<p>Reducing waste and variability (C)</p> Signup and view all the answers

What is the purpose of the 'Listening' phase in the Lean-Sigma methodology?

<p>To identify and prioritize the critical requirements of the customer (B)</p> Signup and view all the answers

What is the primary purpose of the Lean-Sigma methodology described in the text?

<p>To define and scope a problem for improvement (A)</p> Signup and view all the answers

Which of the following is NOT a key step in the Lean-Sigma methodology described in the text?

<p>Powerfly (D)</p> Signup and view all the answers

What is the purpose of the 'CTQ Tree' mentioned in the text?

<p>To define the critical to quality characteristics of the problem (C)</p> Signup and view all the answers

What is the main focus of the 'Define phase' in the Lean-Sigma methodology?

<p>Defining and scoping the problem to be addressed (D)</p> Signup and view all the answers

Which of the following is NOT a key tool or technique mentioned in the text as part of the Lean-Sigma methodology?

<p>Six Sigma (B)</p> Signup and view all the answers

What is the primary purpose of the 'SIPOC' tool mentioned in the text?

<p>To define the scope and boundaries of the project (D)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Study Notes

Lean-Sigma Description

  • Lean-Sigma is a methodology for defining and scoping problems.
  • It involves listening, defining, and scoping the problem through various phases.

Day 1 Schedule

  • Introduction to Lean-Sigma
  • Defining and scoping the problem
  • Listening and defining the problem through a round table discussion
  • Expectations and CID break
  • Powerfly define phase
  • Introduction to Listening and SIPOC
  • Define 6-Pack
  • Debrief and Needs Theory
  • CTQ Tree Theory
  • Break and Summary
  • Conclusion and Tool summary
  • Assessment and expectations for Day 2

Debrief and Phase D Tool Box

  • Description of the problem using 5W and 2H
  • VoC, VoB, and CTQ goals and impact
  • SMART goals and graphic presentation
  • Specify the scope of the project using IN/OUT SIPOC
  • Project schedule and team risk analysis
  • Communication plan and share the vision
  • Threats and opportunities elevation pitch

Correction/Improvement/Development

  • A scenario about a house with blown-off tiles and no living room or partition walls.
  • The scenario is used to illustrate the need for Lean-Sigma methodology.

Green Belt – Safran Lean Sigma Facilitator

  • Module 1 consists of Days 1-3 training.
  • The training is restricted and confidential.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

Lean Six Sigma Belts
49 questions

Lean Six Sigma Belts

RiskFreeSelenite avatar
RiskFreeSelenite
Facilitation Role in Lean Sigma
16 questions
Lean Six Sigma White Belt: DMAIC Methodology
9 questions
Six Sigma Define Phase
22 questions