Questions and Answers

Which of the following is provided to allow the pump to operate at minimum flow rate when thermostatic radiator valves (TRVs) are fitted?

  • Diverter valve
  • Motorised valve
  • Bypass valve (correct)
  • Mid-position valve

How far should the vent pipe rise above the water level in an F&E cistern in a fully pumped system?

450 mm

Which Building Regulation specifies the requirements for energy conservation in heating systems?

  • Part L1 (correct)
  • Part G
  • Part H1
  • Part J

On a properly controlled system that operates with pumped heating and gravity hot-water primaries, what device is used to control the operation of the gravity primaries?

<p>Motorised valve (B)</p> Signup and view all the answers

By approximately how much does the water in a central-heating system expand when it is heated?

<p>4% (B)</p> Signup and view all the answers

A panel radiator works mostly by:

<p>Convection (D)</p> Signup and view all the answers

Which device permits the independent control of heating and hot water?

<p>Programmer (B)</p> Signup and view all the answers

If a replacement pump is too short for the gap it has to fit into, you should:

<p>Obtain pump extensions (A)</p> Signup and view all the answers

Which of the following can be used in a TRV to operate the valve body?

<p>Gas-filled bellows (B)</p> Signup and view all the answers

Which heat emitter will heat a room quickest?

<p>Fan-assisted convector (D)</p> Signup and view all the answers

Which type of boiler requires a drainpipe?

<p>Condensing (A)</p> Signup and view all the answers

Which rating is the seasonal efficiency of a boiler measured against?

<p>SEDBUK (C)</p> Signup and view all the answers

The first action to be taken when replacing a pump is to:

<p>Isolate the electricity supply. (B)</p> Signup and view all the answers

What is the duration of a pressure test for a central-heating system?

<p>60 minutes (B)</p> Signup and view all the answers

A heating system that appears to have a pipe circling around the house from the flow on the boiler back to the return is called a:

<p>two-pipe circuit with reverse return. (B)</p> Signup and view all the answers

What is the test pressure for a central-heating system?

<p>One-and-a-half times the working pressure (C)</p> Signup and view all the answers

What is the marking for the common pipework connection port on a midposition valve?

<p>AB (A)</p> Signup and view all the answers

What is the best position for a pump on a heating circuit?

<p>Flow pipe (D)</p> Signup and view all the answers

What do you call a valve that has a tamperproof cap as a cover?

<p>Lockshield valve (C)</p> Signup and view all the answers

The open vent to a heating system should be sized as a minimum at:

<p>22 mm. (B)</p> Signup and view all the answers

In a two pipe system, the:

<p>Flow and return pipework are separated (B)</p> Signup and view all the answers

The minimum pipe size for the primary flow and return pipework from an independent solid fuel boiler to a hot water storage cylinder is:

<p>28mm (A)</p> Signup and view all the answers

Which of the following systems does this statement apply to? The temperature of the last radiator on the circuit will be cooler than the first

<p>One pipe system (D)</p> Signup and view all the answers

What is the normal size of the open vent to a fully pumped heating system in a domestic property?

<p>22mm (B)</p> Signup and view all the answers

The connection of an open vent pipe and a cold feed pipe can be made to a fully pumped system using:

<p>An air separator (A)</p> Signup and view all the answers

A Zone valve in a pumped heating circuit is designed to:

<p>Isolate the circuit when the desired temperature is reached (C)</p> Signup and view all the answers

In a combined hot water and central heating system,including a feed and expansion cistern with gravity primaries and pumped heating circuits, the:

<p>Water level in the F&amp;E cistern should be set to allow for thermal expansion (C)</p> Signup and view all the answers

The minimum size for a primary cold feed for a hot water heating system is:

<p>15mm (B)</p> Signup and view all the answers

Before filling a central heating system for the first time, it is advisable to:

<p>Remove the pump(accelerator) and replace with a piece of temporary piping (B)</p> Signup and view all the answers

Which one of the following assists in the removal of flux from heating systems pipework?

<p>Hot flushing a system as part of the commissioning process (A)</p> Signup and view all the answers

Flashcards

Bypass valve

A valve that allows the pump to operate at a minimum flow rate when thermostatic radiator valves (TRVs) are fitted. This prevents the pump from dead-heading and ensures continuous circulation.

Vent Pipe Height

The vent pipe should rise 450mm above the water level in a Feed & Expansion (F&E) cistern. This prevents water from siphoning out.

Energy Conservation Regulation

Building Regulation Part L1 specifies the requirements for energy conservation in heating systems.

Valve for Gravity Primaries

A motorized valve is used to control the operation of the gravity primaries in a controlled system where pumped heating and gravity hot-water primaries are used.

Signup and view all the flashcards

Expansion of Water

The water in a central heating system expands by approximately 4% when it is heated.

Signup and view all the flashcards

Panel Radiator Heat Transfer

Panel radiators work mostly by convection because heat is transfered by the movement of fluids.

Signup and view all the flashcards

Independent Control Valve

A diverter valve permits the independent control of heating and hot water by directing water to either circuit.

Signup and view all the flashcards

Pump Extension

If a replacement pump is too short for the gap, obtain pump extensions to fit it in without altering the pipework.

Signup and view all the flashcards

TRV Actuator

Gas-filled bellows can be used in a TRV to operate the valve body. The gas expands or contracts with temperature changes adjusting the valve.

Signup and view all the flashcards

Fastest Heat Emitter

Fan-assisted convector will heat a room quickly by forcing heated air out faster.

Signup and view all the flashcards

Drainpipe for Boilers

Condensing boiler requires a drainpipe to remove the condensate produced during operation.

Signup and view all the flashcards

Boiler Efficiency Rating

SEDBUK rating measures the seasonal efficiency of a boiler.

Signup and view all the flashcards

Pump Replacement Safety

Isolate the electricity supply, is the first action to be taken when replacing a pump to prevent electrical shock.

Signup and view all the flashcards

Heating System Test

A duration of 30 minutes is the duration of a pressure test for a central heating system.

Signup and view all the flashcards

Heating Pipe Arrangement

A heating system called a one-pipe circuit appears to have a pipe circling the house from the flow on the boiler back to the return.

Signup and view all the flashcards

Test Pressure

The test pressure for a central-heating system is one-and-a-half times the working pressure to ensure integrity.

Signup and view all the flashcards

Mid Position Valve

The common pipework connection port on a midposition valve is marked 'AB'.

Signup and view all the flashcards

Pump Placement

The return pipe is the best position for a pump on a heating circuit.

Signup and view all the flashcards

Tamperproof Valve

A valve that has a tamperproof cap as a cover is called a Lockshield valve.

Signup and view all the flashcards

Open Vent Size

The open vent to a heating system should be sized as a minimum at 22 mm. to allow for thermal expansion and prevent pressure build up.

Signup and view all the flashcards

Two-Pipe Advantage

In a two pipe system, the flow and return pipework are separated allowing better balance.

Signup and view all the flashcards

Solid fuel flow pipe

The minimum pipe size for the primary flow and return pipework from an independent solid fuel boiler to a hot water storage cylinder is: 28mm

Signup and view all the flashcards

Radiator temperature change

The temperature of the last radiator on the circuit will be cooler than the first is typical for a One pipe system.

Signup and view all the flashcards

Vent pipe diameter

The normal size of the open vent to a fully pumped heating system in a domestic property is: 22mm

Signup and view all the flashcards

Connection

The connection of an open vent pipe and a cold feed pipe can be made to a fully pumped system using: An Injector tee

Signup and view all the flashcards

Study Notes

Pump Operation with TRVs

  • A bypass valve allows the pump to operate at a minimum flow rate when thermostatic radiator valves (TRVs) are fitted.

Vent Pipe Height in F&E Cistern

  • The vent pipe should rise 450 mm above the water level in a fully pumped F&E (Feed and Expansion) cistern.

Building Regulations for Energy Conservation

  • Part L1 of the Building Regulations specifies the requirements for energy conservation in heating systems.

Controlling Gravity Primaries in a Pumped System

  • A motorized valve controls the operation of gravity primaries in a properly controlled system with pumped heating and gravity hot-water primaries.

Water Expansion in Central Heating Systems

  • Water in a central-heating system expands by approximately 4% when heated.

Panel Radiator Function

  • A panel radiator works mostly by convection.

Independent Control of Heating and Hot Water

  • A diverter valve permits the independent control of heating and hot water.

Replacement Pump Too Short

  • Obtaining pump extensions is the appropriate solution if a replacement pump is too short for the gap it needs to fit into.

TRV Valve Body Operation

  • Gas-filled bellows can be used in a Thermostatic Radiator Valve (TRV) to operate the valve body.

Quickest Room Heating

  • A fan-assisted convector is the heat emitter that will heat a room the most quickly.

Boiler Drainpipe Requirement

  • A condensing boiler requires a drainpipe.

Boiler Efficiency Rating

  • SEDBUK is the rating against which the seasonal efficiency of a boiler is measured.

Replacing a Pump: First Action

  • Isolating the electricity supply should be the first action when replacing a pump.

Central Heating System Pressure Test Duration

  • The duration of a pressure test for a central-heating system is 30 minutes.

Heating System Pipe Configuration

  • A one-pipe circuit defines a heating system circulating a pipe around the house from the boiler flow back to the return.

Central Heating System Test Pressure

  • Two times the working pressure is the test pressure for a central-heating system.

Mid-Position Valve Common Port Marking

  • AB marks the common pipework connection port on a mid-position valve.

Best Position for Pump on Heating Circuit

  • The return pipe is the best position for a pump on a heating circuit

Valve with Tamperproof Cap

  • A valve with a tamperproof cap as a cover is called a lockshield valve.

Open Vent Size for Heating System

  • 15 mm is the minimum size for the open vent to a heating system.

Two-Pipe System Characteristic

  • Flow and return pipework are separated in a two pipe system.

Minimum Pipe Size for Solid Fuel Boiler

  • 28mm is the minimum pipe size for primary flow and return pipework from an independent solid fuel boiler to a hot water storage cylinder.

Temperature in a One-Pipe System

  • The temperature of the last radiator on the circuit will be cooler than the first in a one pipe system

Open Vent Size for Fully Pumped System

  • 28mm is the normal size of the open vent to a fully pumped heating system in a domestic property.

Connecting Open Vent and Cold Feed

  • An Injector tee facilitates the connection of an open vent pipe and a cold feed pipe in a fully pumped system.

Zone Valve Function

  • A zone valve in a pumped heating circuit is designed to isolate the circuit when the desired temperature is reached.

Combined System F&E Cistern

  • Water level in the F&E cistern should be set to allow for thermal expansion in a combined hot water and central heating system, including an F&E cistern with gravity primaries and pumped heating circuits.

Minimum Size for Primary Cold Feed

  • 22mm is the minimum size for a primary cold feed for a hot water heating system.

Filling a Central Heating System

  • Remove the pump (accelerator) and replace it with a piece of temporary piping before filling a central heating system for the first time.

Flux Removal

  • Hot flushing a system as part of the commissioning process assists in the removal of flux from heating systems pipework.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Use Quizgecko on...
Browser
Browser