What is the purpose of using parametric modeling for cost estimation?

  • Estimating costs after a full-scale design
  • Setting design-to-cost targets (correct)
  • Quickly choosing from alternate design schemes for detailed cost estimation
  • Evaluating the cost of changes to existing products
  • Based on the provided example, what is the total cost estimate for constructing the new warehouse?

  • $5,000,000.00
  • $3,000,000.00
  • $2,464,455.41 (correct)
  • $1,234,455.41
  • What was the approach taken by AMEC engineers to develop the cost estimate for the warehousing facility?

  • Conducting a survey with potential warehouse users
  • Guessing the cost based on intuition
  • Using historical data from a hotel construction project
  • Analyzing the relationship between material costs and building parameters (correct)
  • Why would a company use computerized tools for cost estimation?

    <p>To make working with different cost estimates easier</p> Signup and view all the answers

    In what scenarios can the parametric method be effectively used for cost estimation?

    <p>When quickly choosing from alternate design schemes with little time for detail design</p> Signup and view all the answers

    What is a key advantage of using computer-based tools in construction cost estimation?

    <p>Facilitation of working with different cost estimation models</p> Signup and view all the answers

    Which of the following is NOT a factor that influences the choice of project cost estimation approach by a project organization?

    <p>The company's budgeting requirements</p> Signup and view all the answers

    Which of the following is a key shortcoming of computerized cost estimation tools?

    <p>A meaningful cost plan cannot be developed unless a project plan with considerable detail is available</p> Signup and view all the answers

    Which of the following is NOT one of the four methods of cost estimation mentioned in the text?

    <p>Detailed analysis</p> Signup and view all the answers

    Which of the following is a key advantage of using project planning software?

    <p>All of the above</p> Signup and view all the answers

    What is a key factor that influences the accuracy of cost estimates?

    <p>All of the above</p> Signup and view all the answers

    Which of the following is a potential downside of relying on subjective judgments of estimators when determining resource and skill requirements for project activities?

    <p>It can lead to inaccurate cost estimates</p> Signup and view all the answers

    What is the primary purpose of the Value Analysis Creative Phase?

    <p>To develop realistic alternatives to conventional or current design using brainstorming methods</p> Signup and view all the answers

    Which of the following is NOT a typical step in the Value Analysis methodology?

    <p>Selection Phase</p> Signup and view all the answers

    During the Value Analysis Evaluation Phase, the team typically evaluates the ideas based on which two factors?

    <p>Cost and function</p> Signup and view all the answers

    Which of the following is a key objective of the Value Analysis Implementation Phase?

    <p>To help implement the recommendations during construction, manufacturing, production, and maintenance</p> Signup and view all the answers

    Which of the following is a key output of the Value Analysis Presentation Phase?

    <p>A cost-value analysis, life cycle cost estimate, and sketches</p> Signup and view all the answers

    What is the primary purpose of the Value Analysis Information Phase?

    <p>To evaluate the project and product function criteria and design concepts</p> Signup and view all the answers

    More Like This

    Factors Affecting Architects' Work
    30 questions
    Project Management: Cost Estimation
    34 questions
    AACE Cost Technician Estimating Techniques
    16 questions
    Use Quizgecko on...
    Browser
    Browser