What is the Intensification Ratio if the injection cylinder diameter is 8 inches and the screw diameter is 2.5 inches?

  • 10.24 (correct)
  • 21.1
  • 3.2
  • 10

If the peak pressure at transfer is 15,000 psispec and there is a twenty percent rise in viscosity, what is the new peak pressure?

  • 15,000 psispec
  • 20,000 psispec
  • 18,000 psispec (correct)
  • 12,000 psispec

A mold contains four cavities and a hot runner. Each part is round (6 inches in diameter) with a 0.500 inch hole With a tonnage factor of three tons per square inch, what is the minimum required clamp force to support the mold?

  • 300 tons
  • 100 tons
  • 200 tons
  • 400 tons (correct)

Flashcards

Intensification Ratio

The ratio of the area of the injection cylinder to the area of the screw, calculated as (cylinder diameter / screw diameter)^2.

Peak pressure with 20% viscosity increase

If the peak pressure at transfer is 15,000 psispec and there was a twenty percent rise in viscosity, the new peak pressure at transfer would potentially be 18,000 psispec.

Minimum Required Clamp Force

The minimum required clamp force needed to support a mold with four cavities, each a 6-inch diameter circle with a 0.5-inch hole, given a tonnage factor of three tons per square inch.

Study Notes

  • The diameter of the injection cylinder is 8 inches, and the diameter of the screw is 2.5 inches
  • Intensification Ratio is 10.24
  • The peak pressure at transfer is 15,000 psispec and there was a twenty percent rise in viscosity
  • The new peak pressure at transfer is 18,000 psispec
  • A new mold has four cavities and a hot runner
  • Each part is round with a diameter of 6 inches and has a hole with a diameter of 0.500 inch in the center
  • With a tonnage factor of three tons per square inch, the minimum required clamp force needed to support this mold if using a 400-ton machine is 400 tons

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

Injection Molding Quiz
5 questions
Injection Molding for Thermoplastics
30 questions
Injection Molding Process Quiz
58 questions

Injection Molding Process Quiz

IrresistibleNovaculite4595 avatar
IrresistibleNovaculite4595
Use Quizgecko on...
Browser
Browser