IE454 Industrial Robots Week 11 Integration Quiz

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the main goal of the integrate phase?

  • To assemble the robotic cell (correct)
  • To design the robotic cell
  • To install the robotic cell on the production line
  • To train employees to manage the robotic cell

What is one of the inputs required for the integrate phase?

  • Trained employees for managing the robotic cell
  • Tools for assembling the robotic cell
  • Components for designing the robotic cell
  • Cell plans and parts ready to be assembled (correct)

What is the purpose of off-the-line cell preparation?

  • To gather all the tools needed for assembling the cell
  • To start creating value for the customer
  • To assemble the robotic cell on the production line
  • To perform assembling tasks away from the production line (correct)

What is one of the outputs of the integrate phase?

<p>A robotic cell ready to start operating (C)</p> Signup and view all the answers

What is the next step after checking that all equipment from the bill of material has been delivered?

<p>Gather all the tools needed for assembling the cell (D)</p> Signup and view all the answers

What is an essential result of completing the integration steps?

<p>A robotic cell that's ready to start operating (D)</p> Signup and view all the answers

What should be done in parallel with the previous step of preparing the production line?

<p>Testing the cell components (A)</p> Signup and view all the answers

What is meant by 'process tooling' in this context?

<p>The fixed tooling that’s part of the manual cell’s process (D)</p> Signup and view all the answers

What should be addressed based on the manual-robotic comparison during layout modification?

<p>Moving machines and equipment for the robotic cell (C)</p> Signup and view all the answers

What is done during the installation on the line phase?

<p>Taking the robotic cell to the production line (B)</p> Signup and view all the answers

What does 'training the team' phase involve?

<p>Training specific operators on how to use the robotic cell (C)</p> Signup and view all the answers

What needs to be coordinated with line operators during line preparation?

<p>Testing the cell components (D)</p> Signup and view all the answers

What is involved in infeed and outfeed during production line preparation?

<p>Considering how parts are presented and if specific part-presentation devices are needed (A)</p> Signup and view all the answers

What is needed for a downtime risk analysis and mitigation plan during production line preparation?

<p>Identifying potential causes of downtime and creating a plan to mitigate them. (B)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Related Documents

More Like This

Use Quizgecko on...
Browser
Browser