What is the main goal of the integrate phase?
What is the main goal of the integrate phase?
- To assemble the robotic cell (correct)
- To design the robotic cell
- To install the robotic cell on the production line
- To train employees to manage the robotic cell
What is one of the inputs required for the integrate phase?
What is one of the inputs required for the integrate phase?
- Trained employees for managing the robotic cell
- Tools for assembling the robotic cell
- Components for designing the robotic cell
- Cell plans and parts ready to be assembled (correct)
What is the purpose of off-the-line cell preparation?
What is the purpose of off-the-line cell preparation?
- To gather all the tools needed for assembling the cell
- To start creating value for the customer
- To assemble the robotic cell on the production line
- To perform assembling tasks away from the production line (correct)
What is one of the outputs of the integrate phase?
What is one of the outputs of the integrate phase?
What is the next step after checking that all equipment from the bill of material has been delivered?
What is the next step after checking that all equipment from the bill of material has been delivered?
What is an essential result of completing the integration steps?
What is an essential result of completing the integration steps?
What should be done in parallel with the previous step of preparing the production line?
What should be done in parallel with the previous step of preparing the production line?
What is meant by 'process tooling' in this context?
What is meant by 'process tooling' in this context?
What should be addressed based on the manual-robotic comparison during layout modification?
What should be addressed based on the manual-robotic comparison during layout modification?
What is done during the installation on the line phase?
What is done during the installation on the line phase?
What does 'training the team' phase involve?
What does 'training the team' phase involve?
What needs to be coordinated with line operators during line preparation?
What needs to be coordinated with line operators during line preparation?
What is involved in infeed and outfeed during production line preparation?
What is involved in infeed and outfeed during production line preparation?
What is needed for a downtime risk analysis and mitigation plan during production line preparation?
What is needed for a downtime risk analysis and mitigation plan during production line preparation?
Flashcards are hidden until you start studying