Hydrology Design: Runoff Phase and Sewage System

SportyNovaculite7155 avatar
SportyNovaculite7155
·
·
Download

Start Quiz

Study Flashcards

10 Questions

What is the term for the discharge resulting from rainfall?

Runoff

What is the term for the portion of precipitation that reaches the stream channel?

Runoff

What is the term for the regular removal of accumulated solids from a sewage system?

Desludging

What is the term for the conveyed waste-water in Sewage Treatment Plants (STP)?

Sewage

What is the term for the conveyed waste-water in Septage Treatment Plants (SpTP)?

Septage

What is the term for the average daily demand of water in a Medium Cost Subdivision according to the Design Standard For Water (MWSS)?

265 lpcd

What is the term for the maximum hourly demand of water according to the Design Standard For Water (MWSS) if the average daily demand is ADD?

2.5 * ADD

Which principle addresses the analysis and design of water management systems incorporating technical, economic, environmental, social, legal, and political elements?

Analyzing and designing water management systems incorporating technical, economic, environmental, social, legal, and political elements

What is the term for the portion of precipitation that reaches the stream channel?

Runoff

What is the term for the discharge resulting from rainfall in hydrology design?

Runoff

Test your knowledge of the runoff phase in hydrology design and the differences between sewage and septage systems. This quiz covers the paths of precipitation and the conveyance of waste-water to treatment plants.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Hydrology and Fluvial Geomorphology Quiz
10 questions
Surface Water Hydrology Quiz
5 questions

Surface Water Hydrology Quiz

FineLookingSmokyQuartz avatar
FineLookingSmokyQuartz
Use Quizgecko on...
Browser
Browser