Podcast
Questions and Answers
Where is the paint shop located in the repair station?
Where is the paint shop located in the repair station?
- Ground floor of Building 202 (correct)
- First floor of Building 202
- Narrow Body Hangar
- Jet Propulsion Center Building 611
Which department is NOT located on the first floor of Building 202?
Which department is NOT located on the first floor of Building 202?
- Fluid Analysis Laboratory (correct)
- Materials Management
- Human Resources
- Component Maintenance
What is the purpose of the detailed layouts outlined in the manual?
What is the purpose of the detailed layouts outlined in the manual?
- To provide a detailed guide to the facilities and resources (correct)
- To list all the specialized shops and offices
- To showcase the different departments and their functions
- To ensure compliance with FAA regulations
Who is responsible for maintaining the facilities at the repair station?
Who is responsible for maintaining the facilities at the repair station?
What type of aircraft models does the H75 hangar accommodate?
What type of aircraft models does the H75 hangar accommodate?
Flashcards
Building 202 Layout
Building 202 Layout
Describes the arrangement of departments and shops on the ground and first floors of Building 202.
Repair Station Facilities
Repair Station Facilities
Includes various specialized areas such as painting, fluid analysis, and office departments for maintenance operations.
H75 Hangar
H75 Hangar
A designated area within the repair station for servicing multiple aircraft models including B777 and A320 series.
Director of Facility Management
Director of Facility Management
Signup and view all the flashcards
FAA Reporting Requirements
FAA Reporting Requirements
Signup and view all the flashcards
Study Notes
Housing and Facilities at Repair Station
- The document details the layout of buildings and facilities at the repair station at King Abdulaziz International Airport Jeddah and Building 611, Jet Propulsion Center, Jeddah.
- Specific floor plans are included, identifying departments and shops within each building.
- Building 202, ground floor houses: paint shop, fluid analysis lab, metrology lab, ACM inspection dept, and other shops/offices.
- Building 202, first floor houses: component maintenance, airline support, internal audit, HR, IT, materials management, legal, commercial, and more.
- The document also outlines the narrow body hangar, storage facilities, engine test cell facilities, and other areas.
- The layout of H75 hangar is detailed for various aircraft models: B777-200, A330-300, B787-9, A320neo, A320-200, A321-100, A321-200, A321neo.
Repair Station Facility Management
- The manual ensures availability of equipment and resources for efficient work.
- Facility management is responsible for equipping and maintaining all facilities.
- Standard facilities, such as lighting, electricity, and air conditioning, are provided.
- Significant maintenance impacting operation for over five days must be reported to the FAA.
- Permanent changes to housing and facilities are updated in the RSQCM.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.