NESHAP Quiz
50 Questions
2 Views

NESHAP Quiz

Created by
@AdequateRiver

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which of the following is considered a type of demolition operation?

  • Roadways
  • Strip (correct)
  • Visible emissions
  • Resilient floor covering
  • What does the term 'resilient floor covering' refer to?

  • Visible emissions
  • Strip
  • Roadways
  • Asbestos-containing floor tile (correct)
  • What does the term 'roadways' encompass?

  • Resilient floor covering
  • Visible emissions
  • Strip
  • Public and private highways (correct)
  • What does it mean to 'strip' in the context of the text?

    <p>Take off RACM from any part of a facility or facility components</p> Signup and view all the answers

    What is the definition of a 'structural member'?

    <p>Any load-supporting member of a facility, such as beams and load supporting walls</p> Signup and view all the answers

    What does 'visible emissions' refer to?

    <p>Emissions visually detectable without the aid of instruments</p> Signup and view all the answers

    What is the definition of a 'waste generator'?

    <p>Owner or operator of a source producing asbestos-containing waste material</p> Signup and view all the answers

    What is the method used to determine the asbestos content in resilient floor covering?

    <p>Polarized Light Microscopy</p> Signup and view all the answers

    What is not included in the definition of 'visible emissions'?

    <p>Condensed, uncombined water vapor</p> Signup and view all the answers

    What does the term 'strip' mean in the context of the text?

    <p>Take off RACM from any part of a facility or facility components</p> Signup and view all the answers

    Which of the following is required to be originated and signed by the waste generator?

    <p>Waste shipment record</p> Signup and view all the answers

    When does a working day include holidays?

    <p>Monday through Friday</p> Signup and view all the answers

    Which requirements of paragraphs (a), (b), and (c) of section 61.145 apply to the owner or operator of a demolition or renovation activity?

    <p>Requirements of paragraphs (a) and (b)</p> Signup and view all the answers

    What is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?

    <p>10 working days</p> Signup and view all the answers

    What information should be included in the notice provided to the Administrator?

    <p>All of the above</p> Signup and view all the answers

    When should the certification of a trained supervisor be included in the notice?

    <p>At least 1 year after promulgation of this regulation</p> Signup and view all the answers

    What should be done if unexpected RACM is found or Category II nonfriable ACM becomes crumbled, pulverized, or reduced to powder?

    <p>Stop the removal work and consult with a licensed asbestos professional</p> Signup and view all the answers

    Which of the following requirements apply to a facility being demolished under an order of a State or local government agency?

    <p>Paragraphs (b)(1), (b)(2), (b)(3)(iii), (b)(4) (except (b)(4)(viii)), (b)(5), and (c)(4) through (c)(9) of this section</p> Signup and view all the answers

    In a facility being renovated, which of the following requirements apply if the combined amount of RACM to be stripped, removed, dislodged, cut, drilled, or similarly disturbed is less than one cubic meter (35 cubic feet) off facility components where the length or area could not be measured previously or there is no asbestos?

    <p>Paragraphs (b) and (c) of this section</p> Signup and view all the answers

    How should the owner or operator of a demolition or renovation activity provide the Administrator with written notice of intention to demolish or renovate?

    <p>By U.S. Postal Service, commercial delivery service, or hand delivery</p> Signup and view all the answers

    Which of the following is a requirement for the owner or operator of a demolition or renovation activity according to paragraph (a) of this section?

    <p>Remove all RACM from a facility being demolished or renovated</p> Signup and view all the answers

    Under what conditions does RACM need not be removed before demolition?

    <p>It is Category I nonfriable ACM that is not in poor condition and is not friable</p> Signup and view all the answers

    What should be done if unexpected RACM is found or Category II nonfriable ACM becomes crumbled, pulverized, or reduced to powder?

    <p>Dispose of asbestos-contaminated debris as asbestos-containing waste material</p> Signup and view all the answers

    Which of the following is a requirement for the training of on-site representatives at a facility regulated by this section?

    <p>Training must be completed every 2 years</p> Signup and view all the answers

    What is the minimum requirement for wetting asbestos-containing waste material during the collection and handling operations at a source covered under the provisions of this section?

    <p>Discharge no visible emissions to the outside air from collection, mixing, wetting, and handling operations</p> Signup and view all the answers

    What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material?

    <p>Labels must be printed in letters of sufficient size and contrast</p> Signup and view all the answers

    What is the method specified in the text for processing asbestos-containing waste material into nonfriable forms?

    <p>Form all asbestos-containing waste material into nonfriable pellets or other shapes</p> Signup and view all the answers

    In renovation operations, wetting is not required if which of the following conditions are met?

    <p>The owner or operator has obtained prior written approval from the Administrator based on a written application that wetting to comply with this paragraph would unavoidably damage equipment or present a safety hazard.</p> Signup and view all the answers

    For large facility components such as reactor vessels, large tanks, and steam generators, the RACM is not required to be stripped if which of the following conditions are met?

    <p>All of the above.</p> Signup and view all the answers

    When the temperature at the point of wetting is below 0 °C (32 °F), which of the following conditions must be followed?

    <p>All of the above.</p> Signup and view all the answers

    Which of the following is NOT a requirement for the owner or operator of a demolition or renovation activity according to paragraph (b) of this section?

    <p>Discharge no visible emissions to the outside air</p> Signup and view all the answers

    What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material?

    <p>Adequately wet at all times</p> Signup and view all the answers

    What is the method specified in the text for processing asbestos-containing waste material into nonasbestos (asbestos-free) material?

    <p>Use an alternative emission control and waste treatment method</p> Signup and view all the answers

    According to the text, what is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?

    <p>48 hours</p> Signup and view all the answers

    What is the definition of a 'resilient floor covering' according to the text?

    <p>A type of flooring that is resistant to damage or wear</p> Signup and view all the answers

    What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material according to the text?

    <p>Labeling with the date of wetting is required</p> Signup and view all the answers

    According to the text, what is the method used to determine the asbestos content in resilient floor covering?

    <p>Chemical analysis</p> Signup and view all the answers

    Which one of the following is a requirement for the owner or operator of an active waste disposal site that receives asbestos-containing waste material?

    <p>There must be no visible emissions to the outside air from any active waste disposal site where asbestos-containing waste material has been deposited.</p> Signup and view all the answers

    Which one of the following is a requirement for the warning signs displayed at an active waste disposal site where asbestos-containing waste material is deposited?

    <p>All of the above.</p> Signup and view all the answers

    Which one of the following is a requirement for the waste shipment records of asbestos-containing waste material transported off the facility site?

    <p>All of the above.</p> Signup and view all the answers

    Which regulation requires schools to inspect for asbestos and implement response actions?

    <p>40 CFR 763, Subpart E</p> Signup and view all the answers

    Which regulation protects public employees performing asbestos abatement work in States not covered by OSHA asbestos standard?

    <p>40 CFR 763, Subpart G</p> Signup and view all the answers

    Which regulation specifies worker protection measures for all construction work involving asbestos?

    <p>29 CFR 1926.58</p> Signup and view all the answers

    Which regulation specifies exposure limits, engineering controls, and respiratory protection measures for workers in surface mines?

    <p>30 CFR 56, Subpart D</p> Signup and view all the answers

    Which regulation regulates the transportation of asbestos-containing material?

    <p>49 CFR 171 and 172</p> Signup and view all the answers

    Which of the following is required upon closure of a waste disposal site according to the text?

    <p>Providing a copy of records of asbestos waste disposal locations and quantities to the Administrator</p> Signup and view all the answers

    What is the minimum notice required to be given to the Administrator before excavating or disturbing asbestos-containing waste material?

    <p>45 days</p> Signup and view all the answers

    What information must be included in the notice provided to the Administrator before excavating or disturbing asbestos-containing waste material?

    <p>Scheduled starting and completion dates, reason for disturbing the waste, procedures to control emissions, location of temporary storage and final disposal sites</p> Signup and view all the answers

    What is the requirement for wetting asbestos-containing waste material during collection and handling operations?

    <p>Wetting must be sufficient to prevent visible emissions</p> Signup and view all the answers

    What is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?

    <p>No specific minimum notice required</p> Signup and view all the answers

    More Like This

    Use Quizgecko on...
    Browser
    Browser