Podcast
Questions and Answers
Which of the following is considered a type of demolition operation?
Which of the following is considered a type of demolition operation?
- Roadways
- Strip (correct)
- Visible emissions
- Resilient floor covering
What does the term 'resilient floor covering' refer to?
What does the term 'resilient floor covering' refer to?
- Visible emissions
- Strip
- Roadways
- Asbestos-containing floor tile (correct)
What does the term 'roadways' encompass?
What does the term 'roadways' encompass?
- Resilient floor covering
- Visible emissions
- Strip
- Public and private highways (correct)
What does it mean to 'strip' in the context of the text?
What does it mean to 'strip' in the context of the text?
What is the definition of a 'structural member'?
What is the definition of a 'structural member'?
What does 'visible emissions' refer to?
What does 'visible emissions' refer to?
What is the definition of a 'waste generator'?
What is the definition of a 'waste generator'?
What is the method used to determine the asbestos content in resilient floor covering?
What is the method used to determine the asbestos content in resilient floor covering?
What is not included in the definition of 'visible emissions'?
What is not included in the definition of 'visible emissions'?
What does the term 'strip' mean in the context of the text?
What does the term 'strip' mean in the context of the text?
Which of the following is required to be originated and signed by the waste generator?
Which of the following is required to be originated and signed by the waste generator?
When does a working day include holidays?
When does a working day include holidays?
Which requirements of paragraphs (a), (b), and (c) of section 61.145 apply to the owner or operator of a demolition or renovation activity?
Which requirements of paragraphs (a), (b), and (c) of section 61.145 apply to the owner or operator of a demolition or renovation activity?
What is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?
What is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?
What information should be included in the notice provided to the Administrator?
What information should be included in the notice provided to the Administrator?
When should the certification of a trained supervisor be included in the notice?
When should the certification of a trained supervisor be included in the notice?
What should be done if unexpected RACM is found or Category II nonfriable ACM becomes crumbled, pulverized, or reduced to powder?
What should be done if unexpected RACM is found or Category II nonfriable ACM becomes crumbled, pulverized, or reduced to powder?
Which of the following requirements apply to a facility being demolished under an order of a State or local government agency?
Which of the following requirements apply to a facility being demolished under an order of a State or local government agency?
In a facility being renovated, which of the following requirements apply if the combined amount of RACM to be stripped, removed, dislodged, cut, drilled, or similarly disturbed is less than one cubic meter (35 cubic feet) off facility components where the length or area could not be measured previously or there is no asbestos?
In a facility being renovated, which of the following requirements apply if the combined amount of RACM to be stripped, removed, dislodged, cut, drilled, or similarly disturbed is less than one cubic meter (35 cubic feet) off facility components where the length or area could not be measured previously or there is no asbestos?
How should the owner or operator of a demolition or renovation activity provide the Administrator with written notice of intention to demolish or renovate?
How should the owner or operator of a demolition or renovation activity provide the Administrator with written notice of intention to demolish or renovate?
Which of the following is a requirement for the owner or operator of a demolition or renovation activity according to paragraph (a) of this section?
Which of the following is a requirement for the owner or operator of a demolition or renovation activity according to paragraph (a) of this section?
Under what conditions does RACM need not be removed before demolition?
Under what conditions does RACM need not be removed before demolition?
What should be done if unexpected RACM is found or Category II nonfriable ACM becomes crumbled, pulverized, or reduced to powder?
What should be done if unexpected RACM is found or Category II nonfriable ACM becomes crumbled, pulverized, or reduced to powder?
Which of the following is a requirement for the training of on-site representatives at a facility regulated by this section?
Which of the following is a requirement for the training of on-site representatives at a facility regulated by this section?
What is the minimum requirement for wetting asbestos-containing waste material during the collection and handling operations at a source covered under the provisions of this section?
What is the minimum requirement for wetting asbestos-containing waste material during the collection and handling operations at a source covered under the provisions of this section?
What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material?
What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material?
What is the method specified in the text for processing asbestos-containing waste material into nonfriable forms?
What is the method specified in the text for processing asbestos-containing waste material into nonfriable forms?
In renovation operations, wetting is not required if which of the following conditions are met?
In renovation operations, wetting is not required if which of the following conditions are met?
For large facility components such as reactor vessels, large tanks, and steam generators, the RACM is not required to be stripped if which of the following conditions are met?
For large facility components such as reactor vessels, large tanks, and steam generators, the RACM is not required to be stripped if which of the following conditions are met?
When the temperature at the point of wetting is below 0 °C (32 °F), which of the following conditions must be followed?
When the temperature at the point of wetting is below 0 °C (32 °F), which of the following conditions must be followed?
Which of the following is NOT a requirement for the owner or operator of a demolition or renovation activity according to paragraph (b) of this section?
Which of the following is NOT a requirement for the owner or operator of a demolition or renovation activity according to paragraph (b) of this section?
What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material?
What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material?
What is the method specified in the text for processing asbestos-containing waste material into nonasbestos (asbestos-free) material?
What is the method specified in the text for processing asbestos-containing waste material into nonasbestos (asbestos-free) material?
According to the text, what is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?
According to the text, what is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?
What is the definition of a 'resilient floor covering' according to the text?
What is the definition of a 'resilient floor covering' according to the text?
What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material according to the text?
What is the requirement for labeling containers or wrapped materials that contain wet asbestos-containing waste material according to the text?
According to the text, what is the method used to determine the asbestos content in resilient floor covering?
According to the text, what is the method used to determine the asbestos content in resilient floor covering?
Which one of the following is a requirement for the owner or operator of an active waste disposal site that receives asbestos-containing waste material?
Which one of the following is a requirement for the owner or operator of an active waste disposal site that receives asbestos-containing waste material?
Which one of the following is a requirement for the warning signs displayed at an active waste disposal site where asbestos-containing waste material is deposited?
Which one of the following is a requirement for the warning signs displayed at an active waste disposal site where asbestos-containing waste material is deposited?
Which one of the following is a requirement for the waste shipment records of asbestos-containing waste material transported off the facility site?
Which one of the following is a requirement for the waste shipment records of asbestos-containing waste material transported off the facility site?
Which regulation requires schools to inspect for asbestos and implement response actions?
Which regulation requires schools to inspect for asbestos and implement response actions?
Which regulation protects public employees performing asbestos abatement work in States not covered by OSHA asbestos standard?
Which regulation protects public employees performing asbestos abatement work in States not covered by OSHA asbestos standard?
Which regulation specifies worker protection measures for all construction work involving asbestos?
Which regulation specifies worker protection measures for all construction work involving asbestos?
Which regulation specifies exposure limits, engineering controls, and respiratory protection measures for workers in surface mines?
Which regulation specifies exposure limits, engineering controls, and respiratory protection measures for workers in surface mines?
Which regulation regulates the transportation of asbestos-containing material?
Which regulation regulates the transportation of asbestos-containing material?
Which of the following is required upon closure of a waste disposal site according to the text?
Which of the following is required upon closure of a waste disposal site according to the text?
What is the minimum notice required to be given to the Administrator before excavating or disturbing asbestos-containing waste material?
What is the minimum notice required to be given to the Administrator before excavating or disturbing asbestos-containing waste material?
What information must be included in the notice provided to the Administrator before excavating or disturbing asbestos-containing waste material?
What information must be included in the notice provided to the Administrator before excavating or disturbing asbestos-containing waste material?
What is the requirement for wetting asbestos-containing waste material during collection and handling operations?
What is the requirement for wetting asbestos-containing waste material during collection and handling operations?
What is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?
What is the minimum amount of notice required to be given to the Administrator before asbestos stripping or removal work begins?
Flashcards are hidden until you start studying