What type of contracts include the hiring of tools and plants materials?

  • Public Relations Department
  • Engineering Department
  • Commercial Department
  • Concerned Department (correct)

Which type of contract is associated with sanitation?

  • Commercial/Mechanical/Medical (correct)
  • Engineering
  • Public Relations
  • Concerned Technical Department

What is NOT mentioned as a category for contracts at Railway Commercial Stations?

  • Catering contracts
  • Book stalls and weighing machines
  • Cycle/Scooter/moped stands
  • Photography services (correct)

Which type of contract pertains to the cleaning and disposal of foundry waste?

<p>Operating/Mechanical (A)</p> Signup and view all the answers

What is involved in the contracts related to 'grow more food' campaigns?

<p>Lease of Railway's surplus land (C)</p> Signup and view all the answers

Which department is responsible for the disposal of scrap by auction or tenders?

<p>Stores Department (A)</p> Signup and view all the answers

What type of contracts include the management of hoardings and advertisements at Railway stations?

<p>Public Relations Department (D)</p> Signup and view all the answers

What is one of the primary duties of officers authorized to enter into contracts?

<p>To obtain the best value for money spent (B)</p> Signup and view all the answers

Which method involves inviting tenders through an advertisement to the public?

<p>Open tenders (A)</p> Signup and view all the answers

What is the minimum notice period for inviting tenders for large works?

<p>21 days (C)</p> Signup and view all the answers

Under what condition can the tender notice period for certain works be reduced to 14 days?

<p>When e-tendering is used (B)</p> Signup and view all the answers

What is the primary goal of following guidelines from the Railway Board regarding tender methods?

<p>To facilitate competitive bidding (A)</p> Signup and view all the answers

Which tender type is specifically for inviting bids from only one firm?

<p>Single tender (B)</p> Signup and view all the answers

Which of the following conditions necessitates a longer notice period for tender invitations?

<p>Specialized nature of work (A)</p> Signup and view all the answers

What type of process is mandatory for the procurement of common goods and services?

<p>GeM platform procurement (D)</p> Signup and view all the answers

How should the minimum tender notice period be measured?

<p>From the publication on the e-tendering website (D)</p> Signup and view all the answers

What circumstances allow a contractor to commence work before a contract is signed?

<p>There is extreme urgency to safeguard life or property. (D)</p> Signup and view all the answers

Which of the following statements is true regarding the execution of contracts?

<p>No contract can be executed unless it is authorized under the current rules. (D)</p> Signup and view all the answers

What should be done in exceptional cases where contract preparation cannot be postponed?

<p>Consult with the Financial Adviser &amp; Chief Accounts Officer before starting. (A)</p> Signup and view all the answers

Which restriction applies to contract execution by an authority?

<p>No authority may execute a contract beyond their sanctioned limits. (A)</p> Signup and view all the answers

What is the primary intention behind preparing an agreed statement of rates before work commences?

<p>To ensure clarity over terms, conditions, and specifications. (C)</p> Signup and view all the answers

What is the minimum tender value that requires a committee consisting of two members?

<p>Above Rs.50 lakhs (C)</p> Signup and view all the answers

Who must be a member of the tender committee for tenders above Rs.1 crore?

<p>One from the Accounts Department (C)</p> Signup and view all the answers

When a tender committee recommends acceptance of a tender, who should provide the final acceptance?

<p>The next higher authority (A)</p> Signup and view all the answers

What must be requested from a lowest tenderer who is not on the approved list?

<p>Proof of sound financial position (B)</p> Signup and view all the answers

What should be documented if a lower offer is rejected?

<p>Full reasons for rejection (B)</p> Signup and view all the answers

What action must be taken if there are major changes to specifications in a tender?

<p>Call for fresh tenders (B)</p> Signup and view all the answers

How should tenders without requisite earnest money be treated?

<p>Summarily rejected (B)</p> Signup and view all the answers

What is the maximum committee size for tenders exceeding Rs.1 crore?

<p>Three members (D)</p> Signup and view all the answers

What happens if the lowest tenderer cannot provide evidence of capacity and financial soundness?

<p>His tender is rejected and documented (B)</p> Signup and view all the answers

Which two departments must always be represented in tenders above Rs.50 lakhs?

<p>Accounts and Stores (D)</p> Signup and view all the answers

What should contracts include regarding the contractor's responsibilities?

<p>Adequate supervision and care of government property (D)</p> Signup and view all the answers

Which of the following is NOT a principle to keep in view for contract agreements?

<p>Payment can be vague and flexible (D)</p> Signup and view all the answers

What is required before entering a contract involving uncertain or indefinite liability?

<p>Previous consent from competent legal and financial authority (D)</p> Signup and view all the answers

Which aspect of contract agreements pertains to settling disputes?

<p>The method for settling disputes must be defined (C)</p> Signup and view all the answers

What should be considered when entering long term agreements or contracts?

<p>Power to cancel with notice (D)</p> Signup and view all the answers

Which statement reflects proper contract modification protocol?

<p>Contract terms should not be materially varied without consultation (C)</p> Signup and view all the answers

What type of advice should be sought in contract drafting?

<p>Legal and financial advice (D)</p> Signup and view all the answers

What detail about payments should contracts specify?

<p>Who receives the payment and the payment method (C)</p> Signup and view all the answers

Under what condition can variations or modifications to a contract be made?

<p>With authority competent to order and assess them (D)</p> Signup and view all the answers

Which item must be safeguarded in the contract provisions?

<p>Government property entrusted to a contractor (A)</p> Signup and view all the answers

What is required to commence work or supply materials according to the outlined protocols?

<p>A signed contract by the competent authorities (D)</p> Signup and view all the answers

In cases of urgent works, what form of documentation should ideally still be prepared?

<p>An agreed statement of rates (A)</p> Signup and view all the answers

Which of the following is NOT a condition that disallows an authority from executing a contract?

<p>The contract falls under classified information (B)</p> Signup and view all the answers

What should be done if the circumstances allow for a departure from the standard contract execution protocol?

<p>Expedite the completion and execution of the main contract (C)</p> Signup and view all the answers

What is the intention behind securing the power to retain and set off claims for the Railway Administration?

<p>To address various claims against the contractor effectively (C)</p> Signup and view all the answers

Which type of contract pertains to the management of public freight and coaching traffic at Railway Commercial Stations?

<p>Handling contracts (A)</p> Signup and view all the answers

What is the primary purpose of the guidelines prescribed for inviting tenders and conducting scrutiny?

<p>To ensure transparency and fairness in the tendering process (B)</p> Signup and view all the answers

Which of the following contracts would be relevant to the maintenance of civil works?

<p>Zonal contracts (C)</p> Signup and view all the answers

Which department is indicated as the responsible body for sanitation contracts?

<p>Commercial/Mechanical/Medical Department (A)</p> Signup and view all the answers

What should be treated as supplementary to the rules prescribed in the Indian Railway Code for Stores and Engineering Departments?

<p>Guiding principles for tendering (D)</p> Signup and view all the answers

Which of the following is a specific type of contract concerning the lease of land for agricultural purposes?

<p>Lease for 'grow more food' campaigns (D)</p> Signup and view all the answers

What type of contracts are associated with the sale of scrap by auction or inviting tenders?

<p>Stores contracts (C)</p> Signup and view all the answers

What is the minimum time limit for tender opening for supply contracts?

<p>21 days (B)</p> Signup and view all the answers

How long should the tender validity period be in relation to the tender notice period?

<p>Three times the tender notice period (B)</p> Signup and view all the answers

For tenders above Rs 50 lakh and up to Rs 5 crore, how many members should be on the Tender Committee?

<p>Two members (C)</p> Signup and view all the answers

What is the condition under which direct acceptance of a tender is not allowed for amounts up to Rs 50 lakh?

<p>If the tender notice period is less than 21 days (A)</p> Signup and view all the answers

Who should be consulted for constituting the Tender Committees?

<p>Financial Advisor and Chief Accounts Officer (A)</p> Signup and view all the answers

What is the minimum time limit for opening global tenders?

<p>30 days (D)</p> Signup and view all the answers

What must happen if the tender notice period is less than 21 days and the accepting authority intends to accept an offer other than the lowest?

<p>Direct acceptance is not allowed (B)</p> Signup and view all the answers

For e-tenders exceeding Rs 5 crore, how many members should be on the Tender Committee?

<p>Three members (C)</p> Signup and view all the answers

What instructions should be followed for GeM procurement?

<p>Extant instructions (C)</p> Signup and view all the answers

What must not happen between the officer recommending a tender and the accepting authority?

<p>They must not be the same individual (B)</p> Signup and view all the answers

What should be done if the lowest tenderer fails to provide necessary evidence of capacity?

<p>The fact of rejection should be recorded (B)</p> Signup and view all the answers

In the case of major specification changes before finalizing tenders, what is required?

<p>Fresh tenders must be called (C)</p> Signup and view all the answers

What happens to tenders received without the requisite earnest money?

<p>They should be rejected sumarily (C)</p> Signup and view all the answers

How many members are required in a tender committee for tenders above Rs.50 lakhs?

<p>Two members (A)</p> Signup and view all the answers

What documentation is explicitly required when rejecting a lower offer?

<p>Reasons for rejection on the file (C)</p> Signup and view all the answers

What should a contractor do if they are the lowest tenderer but not on the approved list?

<p>Provide evidence of capability (A)</p> Signup and view all the answers

What occurs if an officer is on the tender committee and is also the accepting authority?

<p>Acceptance must go to the next higher authority (A)</p> Signup and view all the answers

What action is mandated when specifications of a tender change significantly?

<p>Call for fresh tenders with sufficient notice (B)</p> Signup and view all the answers

What is essential to ensure regarding the contract terms before entering into an agreement?

<p>They must be precise and definite to avoid ambiguity. (B)</p> Signup and view all the answers

What should be done to handle variations and modifications in a contract?

<p>The terms for variations should be agreed upon beforehand. (C)</p> Signup and view all the answers

What must be included in contracts regarding the contractor's responsibility?

<p>Supervision and care of all government property under their oversight. (A)</p> Signup and view all the answers

What is required before entering into a contract with uncertain liabilities?

<p>The consent of the competent legal and financial authority is needed. (A)</p> Signup and view all the answers

What should typically be done regarding the method of settling disputes in a contract?

<p>It should be defined clearly within the contract terms. (D)</p> Signup and view all the answers

What should be the approach towards adopting standard forms of contracts?

<p>Adoption is encouraged wherever feasible, with scrutiny of terms. (D)</p> Signup and view all the answers

What is a crucial factor for long-term agreements made by the Railway Administration?

<p>They must reserve the right to cancel with proper notification. (C)</p> Signup and view all the answers

What is implied by the requirement for legal and financial advice in contract drafting?

<p>It is advised to ensure contracts are sound and enforceable. (A)</p> Signup and view all the answers

What should be the structure regarding the specified payment method in contracts?

<p>The contract must cover payment specifics, including amount and method. (C)</p> Signup and view all the answers

What exists regarding safeguarding Government property within contracts?

<p>Provisions for safeguarding must be explicitly included in contracts. (B)</p> Signup and view all the answers

Flashcards

Railway contract categories

Different types of contracts handled across various railway departments like commercial, engineering, operating/mechanical, and stores.

Handling contracts (Railway)

Contracts related to goods movement, public transport, and coaching services at stations, transshipment points, and goods sheds.

Catering contracts (Railway)

Contracts for food and beverage services at railway stations.

Commercial department contracts

Contracts related to railway station facilities (stands, stalls, booking offices, land lease, siding contracts).

Signup and view all the flashcards

Engineering department contracts

Contracts for maintenance of railway infrastructure, land lease for development purposes, and civil maintenance.

Signup and view all the flashcards

Operating/Mechanical contracts

Contracts for activities like waste disposal, ash-pit cleaning, and foundry waste handling in railway maintenance workshops.

Signup and view all the flashcards

Contract Departments

Different Railway departments deal with various types of contracts—Commercial, Engineering, Operating/Mechanical etc., as well as collaboration and material purchase-related tasks.

Signup and view all the flashcards

What is the primary goal of a tender system?

To ensure the best possible value for money spent on contracts.

Signup and view all the flashcards

What are the different types of tender invitations?

  1. Open tenders (advertised): open to all firms.
  2. Limited tenders (bulletin): invited to a select group.
  3. Single tender: invitation to one specific firm.
Signup and view all the flashcards

What is the minimum tender notice period for larger works?

21 days or more.

Signup and view all the flashcards

When can the tender notice period be reduced?

In exceptional circumstances, with consultation with the Financial Advisor and Chief Accounts Officer, the minimum notice period for larger works can be reduced. This applies to Works, Earnings, and Service Contracts (with modifications).

Signup and view all the flashcards

What is the maximum notice period reduction for works valued up to Rs. 2 crore?

Up to 14 days, in consultation with Associate Finance.

Signup and view all the flashcards

What about tenders for works in remote areas or specialized projects exceeding Rs. 50 crore?

They still require a minimum notice period of 21 days to allow for thorough preparation by bidders.

Signup and view all the flashcards

From what date is the minimum tender notice period reckoned?

The date the tender is published on the e-tendering website.

Signup and view all the flashcards

What is GeM?

Government e-Marketplace. A platform for procuring common use goods and services.

Signup and view all the flashcards

Is procuring goods and services through GeM mandatory?

Yes, it is mandatory for goods and services available on the GeM platform.

Signup and view all the flashcards

Precise Contract Terms

Contract terms should be clear and unambiguous, leaving no room for misinterpretation.

Signup and view all the flashcards

Contractor's Responsibilities

A contract should clearly define what the contractor must deliver, including timelines, location, and quality standards.

Signup and view all the flashcards

Payment Terms

The contract must outline the payment amount, coverage, recipient, and payment methods.

Signup and view all the flashcards

Supervision & Protection

Contracts should include clauses about the contractor's responsibility for supervision, safeguarding government property, and protecting staff and the public.

Signup and view all the flashcards

Contract Modification

Contracts should clearly define how alterations or modifications can be made, the authorized parties, and the assessment process.

Signup and view all the flashcards

Breach of Contract

The contract should outline consequences for either party failing to fulfill their obligations, methods to resolve disputes, and dispute resolution procedures.

Signup and view all the flashcards

Legal & Financial Advice

It's essential to consult with legal and financial experts before finalizing any contract.

Signup and view all the flashcards

Standard Contract Forms

Use standardized contract forms wherever possible, but ensure thorough review of their terms before implementation.

Signup and view all the flashcards

Contract Modification Authority

Contract terms should not be significantly changed without consultation with relevant legal and financial authorities.

Signup and view all the flashcards

Uncertain Liability

Contracts with unclear or indefinite liabilities or unusual terms require approval from legal and financial authorities.

Signup and view all the flashcards

Tender Committee Size

For tenders worth Rs. 50 lakh to Rs. 1 crore, the committee has 2 members from the Accounts and Stores Departments. For tenders above Rs. 1 crore, it has 3 members - Accounts, Stores, and Indenting Departments.

Signup and view all the flashcards

Tender Committee Conflict of Interest

The officer recommending a tender should not be the same person who accepts it. If they're the same person, acceptance must be done by a higher authority.

Signup and view all the flashcards

Unlisted Tenderer

If the lowest bidder isn't on the approved list, they need to prove their capacity to handle the work and their financial stability.

Signup and view all the flashcards

Rejected Low Bid

When a lower bid is rejected, the reasons must be recorded for future reference.

Signup and view all the flashcards

Major Changes to Specifications

If there are significant changes to tender specifications, new tenders should be called for with sufficient notice.

Signup and view all the flashcards

Earnest Money Importance

Tenders missing the required earnest money will be rejected immediately.

Signup and view all the flashcards

Tender Acceptance by Tender Committee

The tender committee may be responsible for the acceptance of a tender.

Signup and view all the flashcards

Tender Committee Composition

The tender committee consists of members from different departments depending on the value of the tender.

Signup and view all the flashcards

Tender Process

The tender process involves several steps, from issuing a tender notice to accepting the winning bid.

Signup and view all the flashcards

Tendering

The process of inviting bids for a project or contract, used by railway authorities to select the best supplier or contractor.

Signup and view all the flashcards

Contract Execution Authority

The authority responsible for signing a contract needs to have the power to handle the specific "class" of contract (e.g., commercial, engineering) and the financial capacity to cover the contract's "amount" or value. This authority also needs to ensure the contract aligns with existing rules and regulations and doesn't exceed authorized limits.

Signup and view all the flashcards

Contract Execution - Emergency Cases

In urgent situations like life-threatening events or track damage, contracts can be executed before works begin. However, a written document outlining the agreed rates and conditions should be prepared as soon as possible, even if it's just a basic agreement.

Signup and view all the flashcards

Contract Execution - Less Urgent Cases

For less critical situations where immediate action is necessary, prior consultation with the Financial Advisor & Chief Accounts Officer (F&CAO) is required before contracts are signed.

Signup and view all the flashcards

Contract Execution - Beyond Authority

No authority can execute a contract exceeding its permitted "class" or "amount". Any excess beyond authorized limits requires approval from a higher authority.

Signup and view all the flashcards

Contract Execution - Contravening Rules

A contract cannot be executed if it breaks any existing rules or orders from a higher authority.

Signup and view all the flashcards

What are some examples of commercial contracts at railways?

Commercial contracts at railways cover various services like catering, cycle stands, bookstalls, weighing machines, city booking offices, land lease, siding contracts, and sanitation.

Signup and view all the flashcards

What types of contracts fall under the Engineering department?

Engineering contracts mainly involve civil works, railway infrastructure maintenance, land lease for development, and zonal contracts for maintenance.

Signup and view all the flashcards

What are examples of Operating/Mechanical contracts?

Operating/Mechanical contracts deal with practical tasks like ash-pit cleaning, cinder picking, foundry waste disposal, and technical collaboration.

Signup and view all the flashcards

What is the importance of the Stores department in railway contracts?

The Stores department handles contracts for sales of scrap materials, auctions, tenders, and potentially material purchases.

Signup and view all the flashcards

Why are tendering guidelines crucial for railway contracts?

Tendering guidelines ensure fairness, transparency, and value for money in procuring goods and services. They dictate how contracts are awarded, ensuring the best bidders are selected.

Signup and view all the flashcards

What are the guiding principles for railway contracts?

The guiding principles emphasize transparent tendering procedures, including inviting bids, conducting scrutiny, and adhering to rules in the Indian Railway Code for Stores and Engineering departments.

Signup and view all the flashcards

What is the significance of contract execution authority?

The authority executing a contract must have the power to handle the specific contract type (e.g., commercial) and sufficient financial capacity to cover the contract's value. Any contract exceeding authorized limits must be approved by a higher authority.

Signup and view all the flashcards

Tender Notice Period

The time frame for which a tender is open for bids, calculated from the date it's published on the e-tendering website.

Signup and view all the flashcards

Tender Validity Period

The duration for which a winning bidder's offer remains valid after the tender closing date.

Signup and view all the flashcards

Minimum Tender Opening Time

The shortest period required for opening tenders, varying based on contract type: 21 days for supply contracts, 30 days for global tenders.

Signup and view all the flashcards

Direct Tender Acceptance

The ability to accept tenders for works up to Rs. 50 lakh directly by executive officers, subject to certain conditions.

Signup and view all the flashcards

Tender Committee

A group formed to evaluate tenders, ensuring they meet financial and technical requirements before acceptance.

Signup and view all the flashcards

GeM Procurement

The use of Government e-Marketplace for procuring common goods and services.

Signup and view all the flashcards

Standard Tender Forms

Pre-designed templates for tendering, uploaded on IREPS by relevant departments for use in the tendering process.

Signup and view all the flashcards

Tendering for Works

The process of inviting and accepting bids for construction and maintenance projects in the railway sector.

Signup and view all the flashcards

Tender Committee Conflict

The officer recommending a tender cannot be the same person who accepts it. If they are, acceptance must be done by a higher authority.

Signup and view all the flashcards

Major Specification Changes

If there are significant changes to the tender specifications, new tenders should be called for with sufficient notice.

Signup and view all the flashcards

Earnest Money

Tenders without the required earnest money will be rejected immediately.

Signup and view all the flashcards

Tender Acceptance Authority

The authority accepting a tender should have the power to handle the type of contract (e.g., commercial, engineering) and the financial capacity to cover the contract's value.

Signup and view all the flashcards

Contract Execution: Limits

No authority can execute a contract exceeding their permitted type or value. Any excess requires higher approval.

Signup and view all the flashcards

Study Notes

Contracts General Principles

  • Contracts are awarded by officers in Railway Administration and Railway Board according to delegated powers, broadly categorized, unless otherwise specified.
  • Different departments are responsible for different types of contracts.

Tender System

  • Tender system is a key method for awarding contracts.
  • Invitation to tenders is a crucial step.
  • Tabulation statements and tender committees are involved in the process.
  • Earnest money and security deposits are crucial parts of contracts.

Types of Contracts

  • Stores (excluding work contracts)
  • Clothing and uniforms, printing, forms
  • Sleepers, points, crossings, fabricated stores
  • Works contracts (including machinery and plant)
  • Handling/Transhipment contracts (stations, sheds)
  • Catering/traffic contracts
  • Cycle/scooter stands, book stalls, weighing machines
  • Out-agency, city booking offices
  • Plot/land lease contracts (private sidings, railway users).
  • "Grow more food" campaign leases
  • Zonal contracts for civil maintenance.
  • Ash-pit cleaning, cinder picking
  • Foundry waste, mechanical workshops
  • Technical collaboration
  • Tool/plant hire
  • Advertisement hoardings
  • Railway property scrap sales
  • Sanitation contracts

Further Considerations

  • Tender notices should be given sufficiently in advance of the expiry date of current contracts.
  • Tendering procedures may be reduced from 21 days to 14 days for smaller values.
  • Remote locations/special types have special tender notice periods.
  • For higher value contracts (above Rs.50 crore), notice periods are at least 21 days.
  • Consideration of competitive bidding, maximum value and effective tendering is important.

Tender Committee

  • Committees are constituted by specific individuals (e.g. General Manager) in consultation with particular departments.
  • For tenders up to Rs 50 lakh, direct acceptance is permitted depending on the selection grade/level.
  • For tenders exceeding Rs.50 lakh but less than Rs.5 crore, the committee has two members.
  • For very high value contracts exceeding Rs.5 crore, the committee has three members.

Contract Agreements

  • Precise and definite terms are essential for clarity.
  • Contractor duties (actions, timings and locations).
  • Railway administration duties (payments and terms).
  • Contractor responsibilities (care of property, personnel protection).
  • Contract terms (variations, modifications, breach remedies, termination).
  • Settlement of dispute procedures are crucial.
  • Legal and financial advice in contract formation is sought.
  • Standard forms of contracts are preferred.
  • Contract variations should have express agreement from involved parties
  • Legal advice will be needed on some of the conditions.

Execution of Contracts

  • Contracts cannot be commenced until signed by authorized personnel.
  • Urgent situations allow exemptions to the rule.
  • Prior consultation is necessary when contract execution cannot be delayed.
  • Expeditious execution of contract is required in exceptional circumstances.

No Contract Authority

  • Contracts must stay within the scope of the involved authorities' powers.
  • Contracts exceeding any budgetary limitations are prohibited.
  • Contract provisions exceeding permissible limitations are forbidden.

Contract Documents

  • Specify details including conditions, specifications.
  • Standard forms are preferred for contracts.
  • All required documents must be present.
  • Unusual conditions need approval from higher-ups.

Variation of Contract Conditions

  • Only the original parties can change contract terms.
  • Subsidiary agreements are required for such changes.
  • Standard contract conditions are preferred

Settlement of Disputes

  • Dispute settlement follows the Indian Arbitration and Conciliation Act 1996.
  • Speedy resolution of claims and disputes related to contracts is essential.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Contracts Chapter IV
81 questions

Contracts Chapter IV

ScenicHummingbird6529 avatar
ScenicHummingbird6529
Contratos de Transporte Renfe Viajeros
45 questions
Rate Contracts in Railway Procurement
79 questions
Use Quizgecko on...
Browser
Browser