Flaring and Venting Procedure Quiz
4 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What should be done after connecting the 1" flare hose to the vapor line of the tank?

  • Depressurize the hose.
  • Open the valve on the Flare System and the valve on the tank or vessel slowly. (correct)
  • Monitor for vapor or liquid left in the hose.
  • Close the valve on the vapor line of the tank and the flare system.
  • Why is it important to watch the pressure on the venting tank closely during flaring or venting?

  • To prevent leaks or vapors from escaping.
  • To maintain a constant flow of vapors in the flare line.
  • To avoid contaminating the tank with flare line debris.
  • To ensure that the pressure does not drop below the desired level. (correct)
  • When should the flare hose be disconnected and cap lines placed?

  • Before venting or flaring to desired pressure.
  • After connecting the flare hose to the vapor line of the tank.
  • After depressurizing the hose.
  • Once transfer into or pressuring of tank is finished. (correct)
  • What should be done to the hose after transferring into or pressuring of tank is finished?

    <p>Place it into storage.</p> Signup and view all the answers

    More Like This

    Stages of Combustion Quiz
    78 questions
    Questionário Sem Título
    8 questions
    Latin Future Passive and Verbs of Fearing
    6 questions
    Use Quizgecko on...
    Browser
    Browser